【正文】
quipment must be qualified by a reinspection before installation, reinspections shall be conducted by relevant authorities. 6. 5 如經(jīng)檢驗發(fā)現(xiàn)設(shè)備質(zhì)量不符合要求時,則 XXX工程師拒絕簽認,由供貨方予以更換或處理,合格后再進行檢查驗收。 We have pleted _______________, and hereby submit this inspection application for your kind review and acceptance. 附件: Attachment: 承包單位(章) Contractor (Stamp) 項目經(jīng)理 Project Manager 日 期 Date 審查意見: Review ments: 目監(jiān)理機構(gòu) Project Supervision Company 總 /專業(yè)監(jiān)理工程師 Chief / Discipline Supervision Engineer 日 期 Date 。 The equipment exwork certificate of conformance and technical instructions and quality inspection documents shall be provided when submitting the inspection application form. The equipment cannot enter the construction site until the above documents are reviewed and the inpsction application form is signed off by the XXX engineeer. 6. 3 設(shè)備進場后, XXX工程師應(yīng)組織承包商在規(guī)定的時間內(nèi)檢查,供貨方應(yīng)派人參加,按供貨方提供的設(shè)備清單及技術(shù)說明書、相關(guān)質(zhì)量控制資料檢查驗收,經(jīng)檢查確認合格則驗收人員簽署驗收單。這些原件由 EPC 承包商或 C承包商保存,提交給 XXX的宜是原件或復(fù)印件加蓋原廠印章。 某工程項目 材料設(shè)備進場檢驗程序 Material/Equipment AsReceived Inspection Procedure 材料設(shè)備進場檢驗程序 Page 2 of 8 TABLE OF