freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

土石壩外文翻譯---土石壩及溢洪道設(shè)計-其他專業(yè)(存儲版)

2025-02-28 08:34上一頁面

下一頁面
  

【正文】 結(jié)構(gòu)分析中遵守通用的安全系數(shù),通常都能夠經(jīng)受一定程度的漫頂而不致失事。累積曲線表示一定時期內(nèi)通過河道上某一地點的累積總量。入庫設(shè)計洪水的選擇和確定,則必須在充分研究流域水文因素的基礎(chǔ)上進(jìn)行。 如果需要,應(yīng)該變換填筑層的含水量、鋪層厚度、碾壓遍數(shù)和碾壓機(jī)的型式等,進(jìn)行填筑試驗。而具有高度流限的肥粘土,多半難以施工,必須避免使用。 分期施工:土壩的分期施工往往是可能的,而且在一些情況下是必須的。一般說來,一條橫跨河谷的最短直線,可能滿足要求。各種穩(wěn)定和滲透分析方法,主要是作為證實工程師的判斷而使用的。 ⑥ pressure cells。 The Design of EarthRock Dam and Spillways Part 1 Embankment Dams Selection of embankment type: In general, there are two types of embankment dams: earth and rockfill. The selection is dependent upon the usable materials from the required excavation and available borrow. It should be noted that rockfills can shade into soil fills depending upon the physical character of the rock and that no hard and fast system of classification can be made. Rocks which are soft and will easily break down under the action of excavation and placement can be classified with earthfills. Rocks which are hard and will not break down significantly are treated as rockfills. The selection and the design of earth embankment are based upon the judgment and experience of the designer and is to a large extent of an empirical nature. The various methods of stability and seepage analyses are used mainly to confirm the engineer’s judgment. Freeboard : All earth dams must have sufficient extra height known as freeboard to prevent overtopping by the pool. The freeboard must be of such height that wave action, wind setup, and earthquake effects will not result in overtopping of the dam. In addition to freeboard, an allowance must be made for settlement of the embankment and the foundation which will occur upon pletion of the embankment. Top width : The width of the earth dam top is generally controlled by the required width of fill for ease of construction using conventional equipment. In general, the top width should not be less than 30 ft. If a danger exists of an overtopping wave caused either by massive landslides in the pool or by seismic block tipping, then extra top width of erosion resistive fill will be required. Alignment : construction costs but such alignment should not be such as to encourage sliding or cracking of the embankment. Normally the shortest straight line across the valley will be satisfactory, but local topographic and foundation conditions may dictate otherwise. Dams located in narrow valleys often are given an alignment which is arched upstream so that deflections of the embankment under pool load will put the embankment in pression thus minimizing transverse cracking, Abutments : Three problems are generally associated with the abutments of earth dams:①seepage,② instability, and ③ transverse cracking of the embankment. If the abutment consists of pervious soils it may be necessary to construct an upstream impervious blanket and downstream drainage measures to minimize and control abutment seepage. Where steep abutments exist, especially with sudden changes of slopes or with steep bluff, there exists a danger of transverse cracking of the embankment fills, This can be treated by excavation of the abutment to reduce the slope, especially in the imperious and transition
點擊復(fù)制文檔內(nèi)容
公司管理相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1