【正文】
mer choice, carries on the load putation according to the known transformer substation load material to the transformer substation. Through the load which obtains had determined the host changes the capacity and a number, the host change the pattern, the winding wiring way, the accent press the way and the host changes the impedance. Third chapter is the transformer substation electricity host wiring design, separately through to 10kV side electricity host wiring drawing up, chooses the stablest reliable wiring way. Fourth chapter is the short class putation, first determined shortcircuits the spot, calculates various parts reactance, then to respectively shortcircuits separately to carry on the putation, obtains respectively shortcircuits the shortcircuit current. Fifth chapter is the electrical equipment choice, the electrical equipment including the generatrix, the circuit breaker, the isolator, the electric current and the voltage transformer, the fuse. Sixth chapter is the power distribution equipment, mainly carries on the design to the transformer substation power distribution equipment. Seventh chapter is antiradar with the earth, this chapter has carried on the choice to the arrester, as well as has determined the earth way. Through to the 10kV transfor mer substation design, causes me has to the electrical engineering and its the automated specialized branch curriculum to be prehensive, system grasping, strengthened apply theory to reality the ability, raised the project consciousness, exercised me independently to analyze and the solution electric power project design question ability. [key words] substation ,load ,transmission system , distribution high voltage work , correction equipment. 5 變電站的綜合概述 隨著經(jīng)濟的發(fā)展和現(xiàn)代工業(yè)建設(shè)的迅速崛起,供電系統(tǒng)的設(shè)計越來越全面、系統(tǒng),工廠用電量迅速增長,對電能質(zhì)量、技術(shù)經(jīng)濟狀況、供電的可靠性指標(biāo)也日益提高,因此對供電設(shè)計也有了更高、更完善的要求。s quality of life, improve their living conditions. Analyse change to give or get an electric shock a mission for carrying and customers carries etc. circumstance, choose the address, make good use of customer data proceed then carry calculation, ascertain the correct equipment of the customer. At the same time following the choice of every kind of transformer, then make sure the line method of the transformer substation, then calculate the shortcircuit electric current, choosing to send together with the electric wire method and the style of the wire, then proceeding the calculation of shortcircuit electric current. This first step of design included:(1) ascertain the total project (2) load analysis(3) the calculation of the shortcircu