freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

空調(diào)公司0905設(shè)備管理控制程序-設(shè)備管理-免費(fèi)閱讀

  

【正文】 程 序 文 件 Procedure Document 重慶英特空調(diào)有限公司 Air International Chongqing Co., Ltd. 文件名稱 (Doc Name): 設(shè)備管理控制程序 Equipment Management Control Procedures 版次 Ver 頁(yè)次 Page 發(fā)行日期 Release Date 文件編號(hào) (Doc No): AICQ/QP0904 B/0 9 10 20xx0110 Calculation of availability rate: on monthly/hourly basis (availability rate = monthly scheduled operating hours – unscheduled shutdown hours) / (monthly scheduled operating hours) x 100%. 由制造部設(shè)備部門負(fù)責(zé)設(shè)備編號(hào),并在設(shè)備上附設(shè)備銘牌進(jìn)行標(biāo)識(shí),對(duì)于關(guān)鍵和特殊過程設(shè)備必須進(jìn)行明確標(biāo)識(shí)。 The department that is to cocoon or scrap equipment shall submit its application and fill the Application Form for Equipment Cocooning amp。 In case the equipment is found to fail during daily operation, the operating department shall issue a Job Bill and submit it to the maintenance personnel. At receipt of the Job Bill, the maintenance personnel shall assign proper repairman to make repairs. After pleting the repair, the operating department shall make an inspection. If the repair proves acceptable, the troubles will be recorded in Equipment History Sheet. 維修保養(yǎng) Maintenance amp。 To improve knowledge and skills, the operators must be provided with necessary training. Only those holding qualification certificates are allowed to work on relevant posts. c. 做好年度維修、保養(yǎng)計(jì)劃,按計(jì)劃做好維修保養(yǎng)工作。 protection device must be plete。 missioning report, 程 序 文 件 Procedure Document 重慶英特空調(diào)有限公司 Air International Chongqing Co., Ltd. 文件名稱 (Doc Name): 設(shè)備管理控制程序 Equipment Management Control Procedures 版次 Ver 頁(yè)次 Page 發(fā)行日期 Release Date 文件編號(hào) (Doc No): AICQ/QP0904 B/0 3 10 20xx0110 while the Equipment Section of Manufacturing Department is required to fill in the “Equipment Acceptance Records” and anize the Engineering Department, Manufacturing Department, Quality Department and operating units to carry out inspection and acceptance. The above departments are required to make their signatures on Handover Bill. 驗(yàn)收合格后備件送倉(cāng)庫(kù)保存,技術(shù)資料由制造部設(shè)備部門分類歸檔。 repair, and equipment management. 制造部設(shè)備部門負(fù)責(zé)組織工程技術(shù)部,制造部工藝部門和質(zhì)量部進(jìn)行設(shè)備驗(yàn)收,并對(duì)新設(shè)備和維修過的設(shè)備進(jìn)行設(shè)備能力調(diào)查。 This is applicable to the management of AICQ production equipment. 3 職責(zé) Responsibility 制造部工藝科負(fù)責(zé)設(shè)備采購(gòu)計(jì)劃的編制,制造部設(shè)備科參與 設(shè)備的選型。 The Manufacture Department shall determine the type, specification, quantity and standard of newly purchased equipment by considering the equipment production capability, technical performance, precision, reliability and maintainability in a prehensive way in accordance with the actual requirements of product quality characteristics. Application for equipment purchase shall be formulated and submitted to the GMO for approval. 設(shè)備到貨后,由制造部設(shè)備部門配合供應(yīng)商安裝、調(diào)試。 The equipment operators shall hold qualification certificates and strictly observe the operation regulations. 程 序 文 件 Procedure Document 重慶英特空調(diào)有限公司 Air International Chongqing Co., Ltd. 文件名稱 (Doc Name): 設(shè)備管理控制程序 Equipment Management Control Procedures 版次 Ver 頁(yè)次 Page 發(fā)行日期 Release Date 文件編號(hào) (Doc No): AICQ/QP0904 B/0 4 10 20xx0110 操作工如發(fā)現(xiàn)故障應(yīng)立即停機(jī),通知設(shè)備維修人員處理。 Before operating the equipment, the operators shall inspect the equipment ponents and confirm they are in normal conditions. 機(jī)修人員應(yīng)定期進(jìn)行潤(rùn)滑保養(yǎng)。 Maintenance Planning by consider
點(diǎn)擊復(fù)制文檔內(nèi)容
公司管理相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1