【正文】
粗略的計(jì)算了啟門力而根據(jù)其啟門力來(lái)選取啟閉機(jī)。 培養(yǎng)我們正確的設(shè)計(jì)思想,讓我們更加嚴(yán)肅認(rèn)真的對(duì)待設(shè)計(jì)工作,讓我在以后的生活中具有實(shí)事求是和刻苦鉆研的工作作風(fēng)。在設(shè)計(jì)中,由于畢業(yè)設(shè)計(jì)時(shí)間所限,在一些地方只是進(jìn)行了比較模糊的設(shè)計(jì)。在構(gòu)件自重標(biāo)準(zhǔn)值的作用下,每一個(gè)吊環(huán)按兩個(gè)截面進(jìn)行計(jì)算的吊環(huán)應(yīng)力不應(yīng)大于(構(gòu)件自重的動(dòng)力系數(shù)已考慮在內(nèi)),也就是應(yīng)該滿足:其中式中: —一個(gè)吊環(huán)所受的拉力; —工作橋在吊裝時(shí)的自重標(biāo)準(zhǔn)值; —吊環(huán)的個(gè)數(shù)(當(dāng)一個(gè)構(gòu)件上設(shè)有四個(gè)吊環(huán)時(shí),設(shè)計(jì)中應(yīng)該按三個(gè)吊環(huán)發(fā)揮作用考慮);—吊索的傾角(一般宜采用)。(3)抗剪復(fù)筋計(jì)算以支座邊緣截面為驗(yàn)算截面,由式得應(yīng)由計(jì)算確定復(fù)筋。(查《水工鋼筋混凝土結(jié)構(gòu)學(xué)》表31),則滿足要求。集中荷載一半橫梁自重:一半機(jī)墩自重:集中荷載的設(shè)計(jì)值:可變荷載集中荷載P集中荷載P直接作用于縱梁上的啟門力,通過(guò)地腳螺栓傳遞給縱梁集中荷載PP2,簡(jiǎn)化計(jì)算,直接帶入四個(gè)螺栓的作用力、進(jìn)行計(jì)算。所以、作用下橫梁更危險(xiǎn)。配筋計(jì)算:按照SL1912008計(jì)算。(查《水工鋼筋混凝土結(jié)構(gòu)學(xué)》附錄4表3),滿足要求。中間共4塊面板。懸臂板伸出長(zhǎng)度小于700mm時(shí)可以不做挑梁。 式中:―滑動(dòng)摩擦系數(shù); ―作用在閘門上的總水壓力,kN。 上游面垂直正應(yīng)力:下游面垂直正應(yīng)力:上游面剪應(yīng)力:上游面水壓力強(qiáng)度下游面剪應(yīng)力:上游面水壓力強(qiáng)度上游水平正應(yīng)力:下游水平正應(yīng)力:上游主應(yīng)力:上游主應(yīng)力:壩前水壓力:通過(guò)上面的計(jì)算,在校核工況下,壩基截面滿足抗滑穩(wěn)定條件和應(yīng)力條件。取挑流角度,取五、挑距及沖坑驗(yàn)算前面已經(jīng)求得,按照連續(xù)式挑流鼻坎的水舌挑距按水舌外緣計(jì)算,其估算公式:,用公式,即,則不會(huì)危及大壩的安全。 原點(diǎn)下游堰面曲線 原點(diǎn)下游選用WES曲線按公式進(jìn)行計(jì)算其中Hd為定型設(shè)水頭,x、y為原點(diǎn)下游堰面曲線橫、縱坐標(biāo)。將上面各值代入《水力學(xué)》公式重新計(jì)算從壩址處剖面圖上查得在設(shè)計(jì)洪水位處對(duì)應(yīng)的河道寬是425m,河道的底寬是110m,近似的按照梯形面積計(jì)算??够€(wěn)定驗(yàn)算:故滿足抗滑穩(wěn)定要求。上游面水平正應(yīng)力:下游面水平正應(yīng)力:上游面主應(yīng)力:下游面主應(yīng)力:壩前水壓力:通過(guò)上面的計(jì)算,在設(shè)計(jì)工況下,壩基截面滿足抗滑穩(wěn)定條件和應(yīng)力條件。新設(shè)計(jì)的非溢流壩段的剖面如圖24。初擬非溢流壩段的剖面的如圖21。規(guī)范DL 51081999式() 式中: ―防浪墻頂至正常蓄水位或校核洪水位的高差(m);―波高(m);―波浪中心線至正?;蛐:撕樗坏母卟睿╩);―為安全超高(m)。 擋水泄水建筑物 樞紐等別及大壩級(jí)別由校核洪水位240m從表14可以查得總庫(kù)容:106m3。故不足的礫石料用軋石解決,~12公里范圍內(nèi)。引水建筑物沿線為流紋斑巖分布。本工程曾就獲青、項(xiàng)家、山前巒三個(gè)壩址進(jìn)行地質(zhì)勘測(cè)工作,經(jīng)分析比較,選用了山前巒壩址。 表11 部分氣象特征值統(tǒng)計(jì)表月份降水量蒸 發(fā) 量平 均 值氣 溫平 均 值相對(duì)溫度(%)平均值占全年(%)一月 77二月 79三月 79四月 82五月 86六月 86七月 81八月 85九月 84十月 82十一月 82十二月 84 水文條件流域內(nèi)現(xiàn)這有三處水文站,即王村口,獲青及黃壇口站,黃壇口水文站于解放前已開始觀測(cè),但因資料欠佳未予采用,獲青水文站從1950~1979年有二十九年的水文資料,根據(jù)獲青站二十九年的徑流資料統(tǒng)計(jì)結(jié)果:。由于本人的水平及以前從未進(jìn)行工程實(shí)踐缺乏經(jīng)驗(yàn),在本設(shè)計(jì)中如有遺漏或錯(cuò)誤之處,懇請(qǐng)?jiān)u閱老師諒解予以指正。烏溪江屬衢江支流,發(fā)源于閩、浙、贛三省交界的仙霞嶺,于衢縣樟樹潭附近流入衢江,全長(zhǎng)170公里,流域面積2623平方公里。 Abstract The Wuxijiang hydropower station is located in HuNan Town in ZheJiang province ,which belongs to a chain of exploitation . According to the demand of topographic form ,I choose diversion hydropower station . The geology condition is good .The main construction conclude the water retaining structure (the concrete non –overfall dam) ,the release works (the concrete over –fall dam) ,the diversion structure (pressure seepage tunnel ,the surgechamber ) ,and the surface power station . The normal water level of the reservoir design water level is 238 m ,its corresponding flow amount is 4800 m3/s .The check level is 240 m ,its corresponding flow is 8500 m3/s .Total reservoir capacity of storage capacity 470000000 performance adjustment is inplete for many power plant is a diversion type power station, a mixed development, development task for power generation, taking into account the ecological water downstream first is the river dam, the layout of water diversion and power generation system。壩區(qū)地質(zhì)條件一般,主要建筑物(砼非溢流壩),泄水建筑物(砼溢流壩),引水建筑物(有壓引水遂洞,調(diào)壓室)。壩底高程111m。Hoist.前 言本次畢業(yè)設(shè)計(jì)時(shí)根據(jù)教學(xué)要求,對(duì)水利水電工程專業(yè)本科畢業(yè)生進(jìn)行的最后一項(xiàng)教學(xué)環(huán)節(jié)。第二章為擋水建筑物和泄水建筑物的設(shè)計(jì),對(duì)溢流壩段和非溢流壩段的剖面進(jìn)行設(shè)計(jì)及抗滑穩(wěn)定和應(yīng)力計(jì)算。壩址以上流域面積為2328平方公里。地層多為白堊紀(jì)流紋斑巖及凝灰?guī)r分布,柱狀節(jié)理及順坡向節(jié)理裂隙普遍,斷裂構(gòu)造不甚發(fā)育,受水庫(kù)回水影響,可能有局部土滑、崩坍等情況,但范圍不會(huì)很大,因此庫(kù)區(qū)的岸坡穩(wěn)定問(wèn)題是不嚴(yán)重的。巖石透水性小,相對(duì)抗水層()埋深不大,一般在開挖深度范圍內(nèi),故壩基和壩肩滲透極微,帷幕灌獎(jiǎng)深度可在設(shè)計(jì)時(shí)根據(jù)揚(yáng)壓力對(duì)大壩的影響考慮選用。本區(qū)地震烈度小于6度。此處河流平順,河谷狹窄,可以大大節(jié)省工程量。則初步擬定剖面,上游鉛直,下游坡率m=,由壩址剖面圖可得到壩底高程▽,則H=127m,取102m。表23 安全超高(單位:m)運(yùn)用情況壩的級(jí)別123設(shè)計(jì)情況(基本情況)校核情況(特殊情況)因?yàn)榍懊嬉呀?jīng)得出此工程壩的級(jí)別為1級(jí),所以在設(shè)計(jì)情況下,在校核情況下。按照規(guī)范SL3192005進(jìn)行穩(wěn)定校核。 上游面垂直正應(yīng)力:式中: —作用于壩體上全部荷載(包括揚(yáng)壓力),對(duì)滑動(dòng)平面的法向分值; —作用于計(jì)算截面以上全部荷載對(duì)截面垂直水流流向型心軸的力矩和; B —計(jì)算截面的長(zhǎng)度??够€(wěn)定驗(yàn)算:故滿足抗滑穩(wěn)定要求。 泄水建筑物由壩址的地質(zhì)條件選用單寬流量為,所以,則溢流孔數(shù),取8個(gè)孔。其中a=,;取,則。通過(guò)試算法得出 。 上游面垂直正應(yīng)力:下游面垂直正應(yīng)力:上游面剪應(yīng)力:上游面水壓力下游面剪應(yīng)力:下游面水壓力上游面水平正應(yīng)力:下游面水平正應(yīng)力:上游面主應(yīng)力:下游面主應(yīng)力:壩前水壓力:通過(guò)上面的計(jì)算,在設(shè)計(jì)工況下,壩基截面滿足抗滑穩(wěn)定條件和應(yīng)力條件。查《水工鋼結(jié)構(gòu)》附錄十一的鋼閘門自重估算公式,對(duì)于。 縱梁工作橋縱梁承受整個(gè)橋跨