freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

國際工程管理作業(yè)(資格預(yù)審)-預(yù)覽頁

2025-09-10 09:20 上一頁面

下一頁面
 

【正文】 Technical Manager? Cayeli Bakir Isletmeleri . . 42, ? 53200 Cayeli, Rize, Turkey? Telephone No: (90) 464 544 64 30 Extension 227? Facsimile No: (90) 464 544 62 84) ? Email: wrightj? SUBMISSION OF PROPOSAL? Proposals must be sealed, plete and selfcontained, regardless of prequalification documents. The original and Two (2) copies of the Prequalification Proposals shall be submitted by courier to the address specified above and labeled as follows:. ? PREQUALIFICATION PROPOSAL? RFP for Contract No. CAY 262? CAYELI MINE? SHAFT DEEPENING amp。PREQUALIFICATION REQUEST FOR PROPOSAL FOR THESHAFT DEEPENING AND RELATED DEVELOPMENT/CONSTRUCTION RFP FOR CONTRACT NO. BAOXINYUAN 001BEIJING WANGJING CHINAFOUNDATION PIT. 0086, 100010 BEIJING Samp。 Presinking preparation of the facility as required. The Owner may expedite portions of this work with independent workers – decision prior to award.? Perform such works in the shaft in order to establish the sinking face while allowing continued mine production from the existing ore handling facilities. This may/will include excavation of the spill raise, installation of the shaft sinking/deflector bulkhead below the existing 900 Level loading pocket, shaft bottom cleanout, temporary removal of shaft steel sets, modifications to the shaft headframe structure to allow surface dumping of waste rock, etc.? Deepening the production shaft (surface elevation nominal 1109 metres) from the current elevation (177。 Overall schedule achieved? Project contact references including name, title, address, telephone number, telefax number and address (if available)? KEY MANAGEMENT AND FIELD SUPERVISION PERSONNEL? The Contractor shall submit an organization chart for the Work which identifies key personnel and the responsibilities. Resumes of key personnel shall be submitted with the organizational chart.? The proposal shall identify the location of the Contractor’s administration and engineering offices for the Work.? In the event that the Contractor would form a Joint Venture for this project, a list of key personnel from all panies involved in the Joint Venture shall be submitted for the Owner’s review.
點擊復(fù)制文檔內(nèi)容
語文相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1