freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

北京市某綜合辦公樓地源熱泵空調(diào)畢業(yè)設(shè)計(jì)-預(yù)覽頁(yè)

 

【正文】 Djmax114 Ccl的值:照明散熱量屬于穩(wěn)態(tài)得熱,一般情況下這一得熱量是不隨時(shí)間變化的。人體顯熱散熱引起的冷負(fù)荷計(jì)算式為:CL1=Qs nC其中:Qs——來(lái)自室內(nèi)全部人體的顯熱得熱,查為65*人數(shù);   n——群集系數(shù),;   C——人體顯熱散熱冷負(fù)荷系數(shù),這一系數(shù)取決于人員在室內(nèi)停留的時(shí)間及進(jìn)出的時(shí)間值,逐時(shí)列于下表:時(shí)刻8910111213141516171819C人體潛熱散熱引起的冷負(fù)荷計(jì)算式為CL2=Q n其中:Q——來(lái)自室內(nèi)全部人體的潛熱得熱,為69*人數(shù);則總的冷負(fù)荷為CL=CL1+CL2=n65C+n69 (w)。CaCz=,計(jì)算可得北外窗透過(guò)窗玻璃進(jìn)入的日射得熱引起的逐時(shí)冷負(fù)荷為:時(shí)刻78910111213141516171819CL80829310711612212612612011212212272 m,此房間為辦公室,查資料得普通辦公室中每人空間為4 m/人,故此房間中的人員散熱量按7人計(jì)算?!妫? F——該面圍護(hù)結(jié)構(gòu)的散熱面積,m; t——室內(nèi)空氣計(jì)算溫度,℃; t——室外供暖計(jì)算溫度,℃; a——溫度修正系數(shù)?!妫﹖℃t℃tt℃aQ朝向(%)風(fēng)力附加(%)修正值(%)修正后的熱量(w)Q(w)1234567891011121314101北外墻1812301412001004121177北外窗13370100337地面4280100428102南外墻1812301687150855842727南外窗14051585429東外墻19011585811地面9030100903103北外墻1812301687001006875704北外窗15050100505西外墻1312595296南外墻16871585584南外窗15051585429地面184201001842西墻457595434頂棚19270100927104北外墻1812301687001006878091北外窗15050100505南外墻14121585350南外窗1328515852792東外墻457595434頂棚19620100962地面159236101002361105北外墻18。冬季采用空調(diào)采暖時(shí),室內(nèi)保持正壓狀態(tài),故未計(jì)算通過(guò)門(mén)窗縫隙的冷風(fēng)滲透耗熱量及冷風(fēng)滲入耗熱量。101房間照明散熱引起的冷負(fù)荷由下式計(jì)算:CL=860nnNCcl=8601111/100=163 w101房間的各項(xiàng)冷負(fù)荷及匯總見(jiàn)下頁(yè)表所示:房間分項(xiàng)CL時(shí) 刻78910111213141516171819101辦公室北外墻10510510410410310098979694949494北外窗1018283847556266696967635580829310711612212612612011212212272人顯熱0225262287307324332344353361365373377人潛熱1310131013101310131013101310131013101310131013101310照明163163163163163163163163163163163163163匯總1668190319602009204620742091210621112109212121252071注:外窗的冷負(fù)荷中第一行為玻璃窗瞬變引起的冷負(fù)荷,第二行為透過(guò)窗玻璃進(jìn)入的日射得熱引起的冷負(fù)荷。Djmax℃,室內(nèi)溫度為25℃,北京市北向的逐時(shí)值t值如下:時(shí)刻78910111213141516171819t32.632.632.532.532.432.232.132.031.931.831.831.831.8由CL=Fk(tt)可得北外墻逐時(shí)冷負(fù)荷如下:時(shí)刻78910111213141516171819CL10510510410410310098979694949494北外窗面積F= m,傳熱系數(shù)k= w/m其中N=房間面積照明功率密度值/1000;:此建筑物為綜合辦公樓,全樓共有1084人工作,大多屬極輕勞動(dòng)類型,室內(nèi)設(shè)計(jì)溫度為25攝氏度,在此情況下,查資料得每人散發(fā)的顯熱為65w,潛熱為69w,全熱為134w。Cz:此建筑物所有塑鋼窗及玻璃幕墻傳熱系數(shù)為k= w/m現(xiàn)分項(xiàng)說(shuō)明如下::在日射和室內(nèi)氣溫綜合作用下,外墻和屋面瞬變傳熱引起的空調(diào)冷負(fù)荷,可按下式計(jì)算:CL=Fk(tt)其中:CL——外墻和屋面瞬變傳熱引起的逐時(shí)冷負(fù)荷,w; F——外墻和屋面的面積,m; k——外墻和屋面的傳熱系數(shù),w/m各層主要房間均為辦公室,另兼有會(huì)議室、休息室及餐廳等。 load。關(guān)鍵詞:風(fēng)機(jī)盤(pán)管加獨(dú)立新風(fēng)系統(tǒng);負(fù)荷;管路設(shè)計(jì);制冷機(jī)組 AbstractWith the development of society and the increasing of living standard, more and more people are using the aircondition technology, which built a healthy and fort habitation for people.This design is about the central air conditioner engineering of an office building that locates in Beijing. There are 6 floors. The gross floor area is about 10000 m2, and the air conditioner area is about 6000 m2. The cold duty is 307 kW .We choose ground sourse heat pump for aircondition of this building. According to different functions, there are rooms such as offices, meeting room, dormitory ect. The system adopts the PAU+FCU system. FCU system deals with the fresh air. PAU system carries on the whole cold duty and part wet duty. PAU+FCU systems can send air from the side and the upside。水系統(tǒng)采用閉式雙管同程式,冷水泵兩臺(tái),一用一備;冷卻水泵選兩臺(tái),一用一備。63摘 要隨著社會(huì)的發(fā)展以及人民生活水平的提高,越來(lái)越多的人在使用空調(diào)技術(shù),以營(yíng)造健康舒適的生活環(huán)境。60謝 辭6059十一、消聲減振設(shè)計(jì)5857十、管道保溫與防腐5756535134七、風(fēng)系統(tǒng)水力計(jì)算34282514畢業(yè)設(shè)計(jì)說(shuō)明書(shū)題 目:北京市某綜合辦公樓地源熱泵空調(diào)設(shè)計(jì)院 (部): 城市建設(shè)學(xué)院專 業(yè): 建筑環(huán)境與設(shè)備工程班 級(jí): 44班姓 名:XXX學(xué) 號(hào): 指導(dǎo)教師: 完成日期: 畢業(yè)設(shè)計(jì)說(shuō)明書(shū)目 錄摘 要1318 空調(diào)系統(tǒng)的選擇24四、新風(fēng)負(fù)荷的計(jì)算33九、制冷機(jī)房設(shè)備的選擇計(jì)算風(fēng)機(jī)盤(pán)管加獨(dú)立新風(fēng)系統(tǒng)有百葉風(fēng)口下送和側(cè)送。依據(jù)相關(guān)的空調(diào)設(shè)計(jì)手冊(cè)所提供的參數(shù),進(jìn)一步完成新風(fēng)機(jī)組、水泵、熱水機(jī)組等的選型,從而將其反應(yīng)在圖紙上,最終完成整個(gè)空調(diào)系統(tǒng)設(shè)計(jì)。 in winter, one for using and one for preparing. The system in washroom can ventilate by itself.
The water system is divided into four parts: the first part is the underground room, the second part is the equipment room, the third part is the first and second floor, the fourth part is the standard floors that is the third floor and above..
Keywords: PAU+FCU systems?!妫罕驹O(shè)計(jì)為北京市某綜合辦公樓地源熱泵空調(diào)設(shè)計(jì),建筑面積約10000 m,建筑高度約22米。二、負(fù)荷計(jì)算本設(shè)計(jì)采用冷負(fù)荷系數(shù)法計(jì)算夏季空調(diào)冷負(fù)荷,通過(guò)冷負(fù)荷溫度與冷負(fù)荷系數(shù)直接從各種擾量值求得各分項(xiàng)逐時(shí)冷負(fù)荷。℃。Ca建筑物內(nèi)的照明使用熒光燈,冷負(fù)荷計(jì)算公式為:CL=860nnNCcl其中:Cl——照明散熱引起的冷負(fù)荷,w;N——照明燈具所需功率,kw;n——鎮(zhèn)流器消耗功率系數(shù),;n——燈罩隔熱系數(shù),; Ccl——照明散熱冷負(fù)荷系數(shù),按照不同的空調(diào)設(shè)備運(yùn)行時(shí)間和開(kāi)燈時(shí)間及開(kāi)燈后的小時(shí)數(shù),空調(diào)供冷系統(tǒng)僅在有人時(shí)才運(yùn)行,取Ccl=;由節(jié)能標(biāo)準(zhǔn)得照明功率密度值為11 w/m。各個(gè)房間的空調(diào)冷負(fù)荷及匯總見(jiàn)下列各表(室內(nèi)設(shè)計(jì)溫度為25℃):101房間:北外墻面積F= m,傳熱系數(shù)k= w/mCz顯熱計(jì)算公式CL1=Qs nC,其中Qs=人數(shù)*65w,人體顯熱散熱冷負(fù)荷逐時(shí)系數(shù)如下:時(shí)刻78910111213141516171819Ccl0計(jì)算得人員顯熱散熱引起的冷負(fù)荷如下表:時(shí)刻78910111213141516171819CL0225262287307324332344353361365373377人體潛熱得熱為穩(wěn)態(tài)得熱,公式CL=Q n,其中CL=人數(shù)*69w,群集系數(shù)n=,計(jì)算得CL=1310w。附加耗熱量包括朝向修正、風(fēng)力附加,因各層層高均小于等于四米,故不需要計(jì)算高
點(diǎn)擊復(fù)制文檔內(nèi)容
環(huán)評(píng)公示相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1