【正文】
structural systems of the building or structures with these structural elements, including verticality and bearing and resist strength system of level, and then various load that situation produce in a most succinct way from transmission to foundation. The stage of the structural design can be divided into three stages on the whole: 1. Structural scheme stage: According to the importance of the building, providing fortification against earthquakes in the earthquake intensity, the geologic prospect report of the project of the building site, classification and height and storey of the building of the building field are counted to confirm the structural form of architecture, what this project is adopted is frame structure。(7) 根據(jù)甲方與設(shè)計(jì)單位簽訂的合同內(nèi)容以及甲方對(duì)本工程的具體要求。(4) 工程內(nèi)容:江北區(qū)建創(chuàng)集團(tuán)職工宿舍樓的土建,安裝,一般建筑裝飾以及人防工程,裝修工程。(7) 結(jié)構(gòu)特點(diǎn):本工程采用獨(dú)立基礎(chǔ),與柱進(jìn)行現(xiàn)澆,基礎(chǔ)下的地基持力層土為強(qiáng)風(fēng)化片麻巖,主體結(jié)構(gòu)為框架結(jié)構(gòu)。(3)內(nèi)墻:衛(wèi)生間及淋浴間采用純水泥漿粘貼,白色釉面磚墻面。(4)頂棚:衛(wèi)生間采用U38輕鋼龍骨,石膏刨花板復(fù)面,白色乳膠漆刷面。其余樓面采用12厚水泥白石子磨光面層。(6)油漆:門扇為淺灰色調(diào)合漆刷面,一底兩涂。挖 土基礎(chǔ)、地下室主體結(jié)構(gòu)內(nèi)外裝飾竣工安裝工程砌 體屋面工程本工程總體施工順序如下:打樁(1)本工程業(yè)主要求工期197天,按照招標(biāo)文件的要求、工程的實(shí)際情況以及工程所經(jīng)歷的季節(jié)特點(diǎn),在深入熟悉圖紙和仔細(xì)研究后,確定總工期197天,具體主要節(jié)點(diǎn)目標(biāo)為。(5)具體的見(jiàn)附圖1橫施工計(jì)劃?rùn)M道圖第四章 施工組織管理體系(1)為全面完成本工程的各項(xiàng)施工任務(wù),我公司將實(shí)行“項(xiàng)目法”組織施工,公司授權(quán)項(xiàng)目經(jīng)理對(duì)工程合同范圍負(fù)全責(zé)。(3)項(xiàng)目管理體系如圖41。(3)各級(jí)管理的落腳點(diǎn)是作業(yè)班組。同時(shí)在公司范圍內(nèi)對(duì)勞動(dòng)力、機(jī)械設(shè)備、周轉(zhuǎn)材料等進(jìn)行平衡調(diào)配,保證滿足本工程的施工需要。定期分析工程成本,并采取相應(yīng)措施進(jìn)行控制。負(fù)責(zé)現(xiàn)場(chǎng)安全生產(chǎn)和文明施工、消防、衛(wèi)生和安全保衛(wèi)工作,落實(shí)各項(xiàng)具體措施。負(fù)責(zé)與建設(shè)單位、監(jiān)理單位和設(shè)計(jì)單位洽談?dòng)嘘P(guān)技術(shù)質(zhì)量事項(xiàng)。做好項(xiàng)目工程質(zhì)量保證資料和各項(xiàng)技術(shù)資料的匯集和整理,做好施工記錄,繪制竣工圖。(5)協(xié)助技術(shù)負(fù)責(zé)人做好工程質(zhì)量管理工作,根據(jù)設(shè)計(jì)圖、工程質(zhì)量驗(yàn)評(píng)標(biāo)準(zhǔn)、施工驗(yàn)收標(biāo)準(zhǔn)、質(zhì)量計(jì)劃等參加工程質(zhì)量監(jiān)督檢驗(yàn)。協(xié)助施工員做好現(xiàn)場(chǎng)的雙標(biāo)化工作。分析預(yù)測(cè)工程總成本和階段成本,并提出措施建議。按現(xiàn)場(chǎng)平面布置要求,對(duì)各類材料開(kāi)展定位管理。(2)盡可能沿場(chǎng)地周邊設(shè)置臨時(shí)圍墻,形成一個(gè)封閉的施工區(qū)域。第六章 施工總平面布置(1)本工程平面呈長(zhǎng)方形分布,為了簡(jiǎn)化設(shè)計(jì)點(diǎn)位的坐標(biāo)計(jì)算和便于施工現(xiàn)場(chǎng)的放樣,建立獨(dú)立的坐標(biāo)控制網(wǎng),利用主要建筑軸線建立施工平面控制方格網(wǎng)。應(yīng)同時(shí)建立施工的水平控制基點(diǎn)。在施工期間監(jiān)測(cè)人員應(yīng)及時(shí)控制,并應(yīng)做好記錄及時(shí)整理歸檔并指導(dǎo)施工。根據(jù)四條控制線按照建筑物與主軸線的關(guān)系,逐一在墊層表面定出放樣灰線,經(jīng)質(zhì)量人員復(fù)核后才能進(jìn)入下道工序施工。在施工時(shí)均以該點(diǎn)為基準(zhǔn)對(duì)建筑物進(jìn)行標(biāo)高引測(cè),以上各層均按相關(guān)數(shù)值用鋼卷尺量上,并用水準(zhǔn)儀抄平,誤差控制在最小幅度。然后根據(jù)主控線進(jìn)行放樣工作,彈線必須經(jīng)過(guò)復(fù)核符合要求后,才能進(jìn)入下道工序施工。檢查時(shí)每層用掛線墜方法進(jìn)行。(2) 挖土采用挖掘機(jī)與人工開(kāi)挖。并配備充足的修土人員。(6) 土方開(kāi)挖期間,土方車輛進(jìn)出注意文明施工,控制土方裝車方量,確保渣土無(wú)散漏。(1) 本工程上部結(jié)構(gòu)梁、柱、樓板均采用九夾板進(jìn)行支模,支承系統(tǒng)采用木擱柵和扣件式鋼管。(3) 如梁高超過(guò)500㎜,上下設(shè)兩道水平鋼管,配以短鋼管加扣件連接。(5) 樓梯支模應(yīng)結(jié)合設(shè)計(jì)圖中樓梯踏步面層材料的做法及其工藝要求。拆模遵循先支后拆,先百承重部位,后承重部位,自上而下的原則。搭設(shè)鋼筋加工棚,配備全套鋼筋加工機(jī)械,并安排專職人員進(jìn)行從鋼筋加工驗(yàn)收、取樣試驗(yàn)、制作加工、焊接取樣試驗(yàn)、成品掛牌、分類堆放、核查發(fā)貨等整個(gè)鋼筋制作加工過(guò)程的管理,以確保鋼筋制作加工的質(zhì)量。(4) 鋼筋進(jìn)場(chǎng),制作加工前,先檢查鋼筋表面應(yīng)潔凈,粘著的油污、泥土、浮銹使用前必須清理干凈。(8)彎起鋼筋中間部位彎折處的彎曲直徑D不少于鋼筋直徑的5 d。(10)豎向柱筋的彎鉤應(yīng)朝向柱心,角部鋼筋的彎鉤平面與模板面夾角對(duì)矩形柱應(yīng)為450角,小截面柱為振動(dòng)器插入需要將彎鉤偏轉(zhuǎn)時(shí),與模板夾角也不得小于150。箍筋接頭交錯(cuò)設(shè)置,接頭與相應(yīng)部位的架立筋綁扎。鋼筋端部的彎鉤應(yīng)朝向混凝土內(nèi)。在項(xiàng)目部技術(shù)負(fù)責(zé)人難以明確梁或鋼筋關(guān)系情況下,通過(guò)圖紙會(huì)審或技術(shù)聯(lián)系單明確設(shè)計(jì)意圖,決不盲目施工。墻柱模板的清掃口應(yīng)在清除雜物及積水后再封閉。(4) 樓面梁板澆筑混凝土,由一端開(kāi)始用“趕漿法”推進(jìn),先將梁分層澆筑成階梯形,當(dāng)達(dá)到樓板位置時(shí)再與板的混凝土一起澆筑,隨著階梯形的不斷延長(zhǎng),連續(xù)向前推進(jìn)。每次混凝土澆筑前施工縫的處理同柱子新老混凝土處理。平板振動(dòng)器的移動(dòng)間距應(yīng)能保證振動(dòng)器的平板覆蓋已振實(shí)部分邊緣。(9)混凝土澆筑完成后,應(yīng)在12小時(shí)以內(nèi)加以覆蓋,并澆水養(yǎng)護(hù)。(2) 砌筑用磚要提前澆水濕潤(rùn)。在同一墻面上各部份的組砌方法應(yīng)統(tǒng)一,并使用權(quán)上下一致?;铱p應(yīng)橫平豎直,水平灰縫和豎向灰縫寬度應(yīng)控制在10mm左右。(6)。(2) 找平層與突出屋面的構(gòu)造(女兒墻、管道)等處陰陽(yáng)角均做R角半圓弧(R≥50)。(5) 卷材及配套材料符合國(guó)家標(biāo)準(zhǔn)規(guī)定并驗(yàn)收合格。(8) 采用熱熔封邊,將卷材搭接處用噴槍加熱,趁熱使二者粘結(jié)牢固,以邊緣擠出瀝青為度;未端收頭用密封膏嵌填嚴(yán)密。(3) 在梁、柱與墻體交接處,應(yīng)用砂漿填滿擠實(shí)。分格條采用寬15深10,兩邊倒斜口的嵌條,提前用水浸透,分格條兩側(cè)用粘稠素水泥漿(摻107膠)與墻面抹成45176。(7) 面層末好后即可拆除分格條,并用素水泥漿把分格縫勾平整。頂面抹出流水坡度,底面外沿邊做出滴水線槽,滴水線槽深度與寬度為10mm。(10)外墻涂料施涂前,提前將墻面上缺棱掉角等處,用與基體強(qiáng)度大致相同的水泥砂漿或水泥漿修補(bǔ)平整(包括分格縫)。(1) 基層處理:清除墻面的塵、污垢、堿膜、砂漿塊等附著物,要灑水潤(rùn)濕。對(duì)于高級(jí)抹灰,應(yīng)先將房間規(guī)方,一般可銜在地面上彈出十字線作為準(zhǔn)線,并結(jié)合墻面平整、垂直程度大致確定墻面抹灰厚度,進(jìn)行“打墩”,“打墩”時(shí)應(yīng)先在左右墻角上各做一個(gè)標(biāo)準(zhǔn)墩,然后用線錘吊垂直線做墻下角兩個(gè)標(biāo)準(zhǔn)墩(高低位置一般踢腳線上口),再在墻角左右兩標(biāo)準(zhǔn)墩面之間通線,~ m左右及在門窗陽(yáng)角等處上下各補(bǔ)做若干個(gè)砂漿墩。抹灰要嚴(yán)格控制平整度,用壓尺刮平找直后,用木蟹磨平。待灰漿稍干時(shí),要及時(shí)壓實(shí)壓光,并視灰漿干濕程度用灰匙蘸水抹壓、溜光,使面層更為細(xì)膩光滑。要完成好這任務(wù),應(yīng)做好三項(xiàng)工作: (1) 制定工程建設(shè)項(xiàng)目總進(jìn)度目標(biāo)和總計(jì)劃。在施工工程的實(shí)際進(jìn)度與計(jì)劃進(jìn)度發(fā)生偏離,無(wú)論是進(jìn)度加快、進(jìn)度滯后都會(huì)對(duì)施工組織設(shè)計(jì)產(chǎn)生影響,都會(huì)對(duì)施工工序帶來(lái)問(wèn)題,都要及時(shí)采取有效措施加以調(diào)整,對(duì)偏離控制目標(biāo)的要找出原因,堅(jiān)決糾正。主體結(jié)構(gòu)確保長(zhǎng)城杯,滿足業(yè)主的質(zhì)量要求,實(shí)現(xiàn)設(shè)計(jì)意圖和招標(biāo)文件中規(guī)定的質(zhì)量要求,圓滿實(shí)現(xiàn)對(duì)業(yè)主及社會(huì)的承諾。(4) 建立“質(zhì)量管理點(diǎn)”,在施工生產(chǎn)現(xiàn)場(chǎng)中,特別對(duì)屋面滲水,塑鋼窗滲水,涂料外觀質(zhì)量,地面、墻面空鼓,地磚鋪設(shè)質(zhì)量以及各細(xì)節(jié)處理等實(shí)行強(qiáng)化管理,使工程達(dá)到優(yōu)質(zhì)標(biāo)準(zhǔn)。(3) 施工時(shí)若有些部位鋼筋發(fā)生矛盾時(shí),不得隨意切斷,無(wú)法綁扎時(shí),應(yīng)向項(xiàng)目總師室和建設(shè)、監(jiān)理單位匯報(bào),及時(shí)與設(shè)計(jì)單位聯(lián)系,處理意見(jiàn)后再繼續(xù)進(jìn)行施工。(3) 特殊工種必須持證上崗。(4) 做到施工方案不施工,有方案無(wú)安全交底不施工,班組上崗前沒(méi)安全交底不施工。(6) 每月二次組織各部門及各分包單位進(jìn)行安全設(shè)施大檢查,進(jìn)行總結(jié)評(píng)比和獎(jiǎng)懲。(1) 工地進(jìn)門口布置一圖五牌,即施工現(xiàn)場(chǎng)平面布置圖、工程概況牌、安全生產(chǎn)六大紀(jì)律和十項(xiàng)安全技術(shù)措施牌、安全生產(chǎn)活動(dòng)記錄牌、現(xiàn)場(chǎng)防火責(zé)任牌等(2) 設(shè)置充足的各類安全宣傳警告牌。所有洞口、臨邊的安全設(shè)施在解除前,應(yīng)征得施工員的同意。現(xiàn)場(chǎng)施工用的機(jī)電設(shè)備均應(yīng)有良好的二級(jí)防護(hù)裝置。(6) 配備專職用電管理員全面負(fù)責(zé)施工用電的管理,制定用電制度,規(guī)范設(shè)置用電線路及設(shè)施,定期進(jìn)行用電線路及設(shè)備的檢查,電線不得亂拉、亂拖。腳手架嚴(yán)格按方案搭設(shè),其立桿間距、大橫桿步距、防護(hù)欄桿、剪刀撐、拉墻桿的設(shè)置必須符合有關(guān)腳手架規(guī)程。(10) 模板鋼管支撐拆除前,必須由技術(shù)人員確定混凝土養(yǎng)護(hù)時(shí)間,并視實(shí)際情況決定是否還需要留設(shè)一部分臨時(shí)支撐,然后由技術(shù)負(fù)責(zé)人簽署拆除命令。第十一章 施工總承包協(xié)調(diào)措施(1) 項(xiàng)目經(jīng)理部全體人員要確立“業(yè)主是上帝”的觀念,把建設(shè)單位期望的工期和工程質(zhì)量作為核心,為業(yè)主建造一流的建筑產(chǎn)品,讓業(yè)主滿意。(2) 開(kāi)工前將正式施工組織設(shè)計(jì)及施工計(jì)劃報(bào)送監(jiān)理工程師審定。變更用材時(shí),事前應(yīng)征請(qǐng)?jiān)O(shè)計(jì)、監(jiān)理意見(jiàn),不同意者不進(jìn)行變更。 (8) 若發(fā)現(xiàn)質(zhì)量事故,及時(shí)報(bào)告監(jiān)理和業(yè)主,并嚴(yán)格按照共同商定的方案進(jìn)行處理。 回顧整個(gè)設(shè)計(jì)過(guò)程,由于時(shí)間較為緊張,又是初次嘗試獨(dú)立完成整個(gè)住宅樓的設(shè)計(jì),我在做畢業(yè)設(shè)計(jì)期間系統(tǒng)總結(jié)回顧所學(xué)知識(shí),中間我溫習(xí)了以前所學(xué)的房屋建筑學(xué)、混凝土結(jié)構(gòu)設(shè)計(jì)原理、施工組織與管理等書(shū);學(xué)習(xí)了從更多方面搜集相關(guān)資料,學(xué)到了很多東西,除了掌握自己所學(xué)的課本外,要更多的了解規(guī)范,因?yàn)樗俏覀冊(cè)O(shè)計(jì)工作的準(zhǔn)繩。與此同時(shí),也增強(qiáng)了我的專業(yè)技能以及以理論知識(shí)為基礎(chǔ)。 本次畢業(yè)設(shè)計(jì)雖然凝聚著自己的汗水,但卻不是個(gè)人智慧的產(chǎn)品,沒(méi)有老師的指導(dǎo),沒(méi)有父母和朋友的幫助和支持,這次的畢業(yè)設(shè)計(jì)不會(huì)這么圓滿的。什么是奮斗?奮斗就是每天很難,可一年一年卻越來(lái)越