【正文】
ormance to should of work, thus rise the Class that the high class counts the machine to high one Class. You heard too many this phrases perhaps: crash, the meaning that is mostly is a workload of CPU to lead greatly, the internal resources shortage etc. the circumstance can39。 But whole pair works is both can send out and accept the data, and can send out and accept at the same time. Be like the Inter is a typical example. The process that information transport also has synchronous and different step cent: The data line and the clock lines are synchronous when synchronous meaning lie in sending out the data, is also the data signal and the clock signals to be carry on by the CPU to send out at the same time, this needs to all want the specialized clock signal each other to carry on the transmission and connect to send, and is constrained, the characteristics of this kind of method lies in its speed very quick, but correspond work time of take up the CPU and also want to be long oppositely, at the same time the technique difficulty also very big. Its request lies in canting have an error margins in a dates deliver, otherwise the whole piece according to pare the occurrence mistake, this on the hardware is a bigger difficulty. Applied more and more extensive in some appropriative equipments, be like the appropriative medical treatment equipments, the numerical signal equipments...etc., in pare the one data deliver, its result is very good. And the different step is an application the most extensive, this receive benefit in it of technique difficulty is opposite and want to be small, at the same time not need to prepare the specialized clock signal, its characteristics to lie in, its data is partition, the longlost send out and accept, be the CPU is too busy of time can grind to a stop sex to work, also reduced the difficulty on the hardware, the data throw to lose at the same time opposite want to be little, we can pass the examination of the data to observe whether the data that we send out has the mistake or not, be like strange accidentally the method, tired addition and eight efficacies method etc, can use to helps whether the data that we examine to send out have or not the 華北科技學院畢業(yè)設(shè)計 (論文 ) 第 5 頁 共 12 頁 mistake occurrence, pass the feedback to carry on the discriminator. A line of transmission of the information contains a string of and bines the cent of: The usual PLC is 8 machines, certainly also having 16 machines. We can be at the time of sending out the data a send out to the other party, also can be 88 send out the data to the other party, and 8 differentiations are also the as that we say to send out the data and bine sends out the data. A speed is more and slowly, but as long as 2 or three lines can solve problem, and can use the telephone line to carry on the long range control. But bine the ocular transmission speed is very quick of, it is a string of ocular of 25600%, occupy the advantage in the short distance, the in view of the fact TTL electricity is even, being limited by the scope of one meter generally, it bine unwell used for the data transmission of the long pull, thus the cost is too expensive. Under a lot of circumstances we are total to like to adopt the string to bine the conversion chip to carry on deliver, under this kind of circumstance not need us to carry on to deposited the machine to establish too and plicatedly, but carry on the data exchanges through the data transmission instruction directly, but is not a very viable way in the correspondence, because the PLC of the other party must has been wait for your data exportation at the time of sending out the data, it can39。t give the superior reply。t is tolerant of. New technique always for bringing more safe and convenient operation for us, make we a lot of problems for face on sweep but light, do you understand the HMI? Says the HMI here you basically not clear what it is, also have no interest understanding, change one inside text explains it into the touch to hold or 華北科技學院畢業(yè)設(shè)計 (論文 ) 第 3 頁 共 12 頁 manmachine interface you knew, it bines with the PLC to our larger space. HMI the control not only is reduced the control press button, increase the vivid of the control, more main of it is can sequence of, and at can the change data input to output the feedback with data, control in the temperature curve of imitate but also can keep the manifestation of view to e out. And can write the function help procedure through a plait to provide the help of various what lies in one39。s address and saving machine