【正文】
downward (lips), can use the same as tools to implement, which can ensure the rain along the steel plate terminal is expelled, and not because of the capillary or wind back to the flat bottom chassis. 。用工具握住鋼板終端,將底盤往上折,折彎每一底盤。 屋面外板在屋脊的地方,都可用收邊工具將位于鋼板終端肋條之間的底盤向上折。供應(yīng)的螺絲可帶有塑料頭、不銹鋼頂蓋或涂有特殊的耐久保護(hù)層。墻面板最小重迭長度為100mm.For onsite processing, and transportation to consider, if necessary, can be used two short pieces of steel plate by end lap to cover the whole length, each column plate lap sequence from bottom to top, and then put down a column. To use the method of transmission fixed roof and wall steel plate side lap to locate on the support. To slope (50) in 1/12 ~ 1/4 (150) between the roof and steel end overlap length of at least 200 mm。Second, the color plate lateral and end lap. When installing each piece of steel plate, should be put before the joints edge accurately on a steel plate, and with a steel plate before clamping, until plate fixed on both ends. A simple and effective method is to use a clamp pliers clamp shelter lap steel plate, respectively. Along the longitudinal steel in place, theoven especially the upper department need pliers cl