【正文】
23600 600 2291000 600 34800 500 3301000 500 45500 400 4311000 500 56710 400 67800 300 78340 500 732710 500 89500 400 816680 600 910600 300 9141000 500 1011600 300 1112990 300 1213600 300 1314600 400 1415430 500 1516310 500 1617700 500 1718500 600 1819800 700 1831800 700 1920600 700 1930800 700 2021500 700 2122490 800 2223500 1000 2228330 700 2324500 1000 2425260 1000 2526856 1000 2627385 1000 2728535 1000 2829500 700 2930600 700 3031800 600 3132500 500 二區(qū)最大時(shí)流量分配表 管段編號(hào)管段長(zhǎng)/m分配流量L/s管徑(mm)12800 700119809 7001819413 7001718440 70023500 7002171000 6001617500 60034590 6003161000 6001516600 60045550 6004151000 5001415550 60056600 5005141000 5001314600 50067500 5006131000 5001213500 50078750 4007121000 5001112750 40089800 3008111000 3001011800 3009101000 300(最高用水時(shí)):以最高日最高時(shí)用水量確定的管徑為基礎(chǔ),將最高時(shí)用水量分配、管段流量進(jìn)行管網(wǎng)平差,詳細(xì)采用哈工大平差軟件。: 從各時(shí)段城市用水量變化情況表中可知:一區(qū): ∑q=(875++) m3/h= (L/s) L/s ,B廠0 L/,28節(jié)點(diǎn)處有A工廠二區(qū):沒有集中流量。最高日綜合生活用水量Q1 : Q1=qNfQ1―—城市最高日綜合生活用水,m3/d ;q――城市最高日綜合用水量定額,L/(cap*d);N――城市設(shè)計(jì)年限內(nèi)計(jì)劃用水人口數(shù);f――城市自來(lái)水普及率,采用f=100%Q1=qNf=370147592/1000=(1)工業(yè)企業(yè)職工的生活用水量Q2: Q2=0(2)工業(yè)企業(yè)職工的淋浴用水量Q3: Q3=0 (3)工業(yè)生產(chǎn)用水量Q4: Q4=0:;每天澆灑1次。最高日綜合生活用水定額為240~370 L/(人綠化用水量按4 L/ m2 計(jì),由于面積太大澆灑面積按總面積的5%算Q5=(30%1042+20%4104)5%103= (m3/d)按最高日用水量的20%計(jì)算。d),由于該區(qū)給水排水設(shè)備淋浴設(shè)備齊全,而且有集中熱水供應(yīng),故取綜合生活用水定額為360 L/(人對(duì)水廠廠址的選擇,應(yīng)根據(jù)下列要求,并且通過技術(shù)經(jīng)濟(jì)比較來(lái)確定:①給水系統(tǒng)布局合理; ②不受洪水威脅; ?、塾休^好的廢水排除條件; ?、苡辛己玫墓こ痰刭|(zhì)條件; ?、萦辛己玫男l(wèi)生環(huán)境,并便于設(shè)立防護(hù)地帶; ?、奚俨疬w,不占或少占良田; ?、呤┕ぁ⑦\(yùn)行和維護(hù)方便。連接管之間的間距考慮在800-1000m左右。③ 干管盡量靠近大用戶,減少分配管的長(zhǎng)度。城市給水管網(wǎng)的布置取決于城市的平面布置、水源、調(diào)節(jié)構(gòu)筑物的位置、大用戶的分布等。1) 排水體制選擇2) 城市排水管網(wǎng)定線的說明(包括方案比較);3) 設(shè)計(jì)流量計(jì)算;4) 控制分支管及總干管的水力計(jì)算;5) 任選1條雨水管路的水力計(jì)算(若體制為分流制);6) 繪圖(平面圖、縱剖面圖)四、設(shè)計(jì)參考資料《給排水設(shè)計(jì)手冊(cè)》第一冊(cè)或《給排水快速設(shè)計(jì)手冊(cè)》第5冊(cè)《給排水管道工程》教材五、設(shè)計(jì)成果設(shè)計(jì)說明書一份(包括前言、目錄、設(shè)計(jì)計(jì)算的過程、總結(jié))城市給水排水管道總平面布置圖1張,比例尺為1:10000(1號(hào)圖);給水管網(wǎng)等水壓線圖1張(2號(hào)圖);污水總干管縱剖面圖1張(由指導(dǎo)教師指定某一段,長(zhǎng)度大約1000米左右)(2號(hào)圖);六、要求按正常上課嚴(yán)格考勤;設(shè)計(jì)說明書要求條理清楚,書寫端正,無(wú)錯(cuò)別字;圖紙線條、符號(hào)、字體符合專業(yè)制圖規(guī)范);按時(shí)完成設(shè)計(jì)任務(wù)七、其他:設(shè)計(jì)時(shí)間:20102011學(xué)年第一學(xué)期(第117周 12月13號(hào)12月25號(hào))上交設(shè)計(jì)成果時(shí)間: 19周周五下午設(shè)計(jì)指導(dǎo)教師: 張奎、譚水成 、宋豐明、余海靜第2章 給水管網(wǎng)設(shè)計(jì)與計(jì)算 給水管網(wǎng)布置及水廠選址該城市有一條自東向西和自南向北轉(zhuǎn)向西流的水量充沛,水質(zhì)良好的河流,可以作為生活飲用水水源。3) 火車站用水量為 6 L/s。s basic training.(2) Skilled cities give the water sewerage system the detailed putation and the raise certain theoretical analysis and the design ability. Enhances the plan the parison, the technical economy, the environment, the society and so on the various aspects generalized analysis and proves the ability.(3) Raise puter operation and application ability. Skilled specialized software application. 目 錄第1章 課程設(shè)計(jì)任務(wù)書第2章 給水管網(wǎng)設(shè)計(jì)與計(jì)算 給水管網(wǎng)布置及水廠選址 給水管網(wǎng)設(shè)計(jì)計(jì)算 清水池調(diào)節(jié)容積 管網(wǎng)水力計(jì)算 管網(wǎng)平差 消防校核第3章 污水管網(wǎng)設(shè)計(jì)與計(jì)算第4章 雨水管網(wǎng)設(shè)計(jì)與計(jì)算第5章 設(shè)計(jì)總結(jié)參考文獻(xiàn)附表一: 一區(qū)管網(wǎng)平差結(jié)果附表二:二區(qū)管網(wǎng)平差結(jié)果附表三:一區(qū)消防校核平差結(jié)果附表四:二區(qū)消防校核平差結(jié)果第1章 課程設(shè)計(jì)任務(wù)書一、 設(shè)計(jì)題目: 常熟市給水排水管道工程設(shè)計(jì)。ForewordWater drains, water supply and drainage project is an important ponent of the project can be divided into drains and water supply pipeline project works two categories.Water pipeline project is on the upgrading of water, transmission, storage, distribution and regulation of science. Its most basic task is to ensure that the raw water source sent to the water treatment structures and water users with the water quality standard transmission and distribution to users. This task through the pump stations, pipelines, distribution mains network structure and regulation and other facilities to work together to achieve, and they formed a water pipeline project. Design and management is a basic requirement for at least the construction costs and management fees to ensure that the necessary water users and pressure to ensure water quality and safety, reduce leakage and achieve the required reliability.Water drainage network project is a water supply and drainage project in the very important ponent of the needs (building) there is also a great investment, the general water supply and drainage works about a total investment of 50% to 80%. At the same time network engineering systems direct services to the people, and people39。②熟練城鎮(zhèn)給水排水工程系統(tǒng)的詳細(xì)計(jì)算和培養(yǎng)一定的理論分析和設(shè)計(jì)的能力。 室外給水排水工程是城鎮(zhèn)建設(shè)的一個(gè)重要組成部分,其主要任務(wù)就是為城鎮(zhèn)提供足夠數(shù)量并符合一定水質(zhì)標(biāo)準(zhǔn)的水;同時(shí),把人們?cè)谏?、生產(chǎn)過程中使用后的污水匯集并輸送到適當(dāng)?shù)攸c(diǎn)進(jìn)行凈化處理,達(dá)到一定水質(zhì)標(biāo)準(zhǔn)后,或重復(fù)使用,或灌溉農(nóng)田,或排入水體。設(shè)計(jì)和管理的基本要求是以最少的建造費(fèi)用和管理費(fèi)用,保證用戶所需的水量和水壓,保證水質(zhì)安全,降低漏損,并達(dá)到規(guī)定的可靠性。前 言 給水排水管道工程是給水排水工程的重要組成部分,可分為給水管道工程和排水管道工程兩大類。這一任務(wù)是通過水泵站,輸水管,配水管網(wǎng)及調(diào)節(jié)構(gòu)筑物等設(shè)施的共同工作來(lái)實(shí)現(xiàn)的,它們組成了給水管道工程。因此,合理地進(jìn)行給水排水管道工程規(guī)劃、設(shè)計(jì)、施工和運(yùn)行管理,保證其系統(tǒng)安全經(jīng)濟(jì)地正常運(yùn)行,滿足生活和生產(chǎn)的需要,無(wú)疑是非常重要的。學(xué)生通過設(shè)計(jì),綜合運(yùn)用和深化所學(xué)的基本理論、基本技能,培養(yǎng)學(xué)生獨(dú)立分析和解決問題的