【正文】
ution of party passes party consciousness, maintaining the authority of the constitution. General Secretary Xi Jinping pointed out that no rules, no side round. Party constitution is the fundamental law, the party must follow the general rules. In early 2015 held the eighth session of the Central Commission for Discipline Inspection Fifth Plenary Session of the 16th Central Committee, Xi Jinping again pointed out that constitution is the party must follow the general rules, but also the general rules. the revision of the code and rule is Method in adhere to the regulations established for the purpose of bining rule of virtue is to adhere to the party constitution as a fundamental to follow, the constitution authority set up, wake up the party constitution and party rules the sense of discipline, the party constitution about discipline and selfdiscipline specific requirements. 4 second is to adhere to in accordance with the regulations governing the party and the party. The Party of rule of virtue de, mainly refers to the party39。 the third is banned terms and discipline law, both with the party discipline, disciplinary regulations repeat and Criminal law and other laws and regulations repeat。s leadership, to solve the masses of the people reflect a focus on the problem. The new revision of the code and rule , reflects the party39。 the second part is the interpretation of the two fundamental principles of the revision of laws and regulations in the party。九、工程驗收本工程驗收遵照《建筑工程施工質(zhì)量驗收統(tǒng)一標(biāo)準(zhǔn)》、《建筑地基處理技術(shù)規(guī)范》等規(guī)范和設(shè)計院要求遵照執(zhí)行。技術(shù)資料由專人負(fù)責(zé),必須及時正確、完整,符合檔案管理要求。工地必須醒目懸掛安全宣傳標(biāo)語和安全警告牌。(3)進(jìn)場前,向監(jiān)理工程師提交輔材堆放場地,盡量保證不影響現(xiàn)場各方施工。電動力設(shè)備必須按規(guī)定接地接零,做到一機(jī)一閘一箱一鎖和三級漏電保護(hù),電工要勤檢查,發(fā)現(xiàn)問題及時整修。進(jìn)入施工現(xiàn)場必須正確佩戴安全帽,高空作業(yè)必須拴好安全帶,嚴(yán)禁酒后操作鉆機(jī)、攪拌機(jī)等。嚴(yán)格勞保用品穿戴。五、施工安全措施建立專職安全管理部門,專人負(fù)責(zé)安全工作。2)混凝土攪制應(yīng)對原材料質(zhì)量與計量、混凝土配合比、坍落度、混凝土強(qiáng)度等級等進(jìn)行檢查?,F(xiàn)場記錄:(1)施工班組記錄員應(yīng)及時、詳細(xì)、認(rèn)真地填寫《長螺旋混凝土壓灌樁施工記錄表》,如實反映施工過程中的各種情況。20mm。然后根據(jù)施工場地標(biāo)高,鉆桿長度,假設(shè)護(hù)套為地面,計算出鉆桿入土深度,然后在鉆塔上做好相應(yīng)標(biāo)記。樁身垂直度控制:樁機(jī)就位時,根據(jù)鉆塔兩個方向線錘控制。(2)樁位定位用鋼筋扎入土中拔出后灌入雙飛粉,并插入2030cm長的竹簽。9)、壓灌應(yīng)連續(xù)進(jìn)行。7)、選用24m3/小時泵速輸送混凝土,鉆頭活門打開后,應(yīng)先泵入混凝土并停頓10~20秒后開始提鉆。如鉆桿提升晚,將造成活門難以打開。4)、鉆孔過程中,未達(dá)到設(shè)計標(biāo)高不得反轉(zhuǎn)或提升鉆桿。整個測量放線過程均需復(fù)測、檢查誤差控制在允許范圍,方可進(jìn)入下道工序。2mm)合格報監(jiān)理工程師確認(rèn)后,埋設(shè)永久高程點,并加以標(biāo)識保護(hù)。4)、在質(zhì)量指標(biāo)上實行重獎重罰,我公司將從工程款中按一定比例提取質(zhì)量獎勵金,交由項目部按責(zé)任、崗位,質(zhì)量好壞合理分配;具體獎罰則按公司質(zhì)量管理系列制度中的規(guī)定嚴(yán)格執(zhí)行。質(zhì)量管理制度與政策為了確保質(zhì)量目標(biāo),將嚴(yán)格推行如下制度與政策。質(zhì)量與管理制度為了確保質(zhì)量目標(biāo)的實現(xiàn),我公司將嚴(yán)格按公司的質(zhì)量保證體系進(jìn)行質(zhì)量控制。(四)鋼筋籠制作及沉籠技術(shù)措施 鋼筋籠一次制作成型(即僅一道焊縫),焊口錯開滿足規(guī)范要求,為保證起吊鋼筋籠過程中鋼筋籠不發(fā)生彎曲或扭曲,影響壓籠質(zhì)量,我公司計劃采用25噸吊車吊籠(保證起吊高度),兩噸振動錘沉籠,起吊前先用¢120鋼管置于鋼籠內(nèi)側(cè),固定鋼籠,起吊時同時用吊車的正鉤與副鉤起吊,當(dāng)鋼籠就位及采取定位措施后,隨壓隨提鋼管,據(jù)已完成的工程實例驗證,以上措施能保證本工程順利完成。10mm,箍筋間距177。50mm樁徑。鋼筋籠體材料HPB300(Φ)HRB335(Φ),HRB400(Φ),鋼筋保護(hù)層70。800mm,有效樁長為24米,工程量約 760 立方米。(2). 編制依據(jù)①、 建設(shè)單位 提供的《金悅大廈樁基礎(chǔ)說明》圖號結(jié)施03a。根據(jù)廣西土木勘察檢測治理有限公司2011年12月提供的《巖土工程詳細(xì)勘察報告》表明,擬建建筑場地巖土評價:粘土①層,場地內(nèi)均有分布,承載力較高,中等壓縮性,厚度大,分布均勻,可直接作低層、多層建筑的基礎(chǔ)持力層;粉質(zhì)粘土②層場地內(nèi)均有分布,承載力小,不宜用作基礎(chǔ)持力層;圓礫③層、泥巖④層、泥巖⑤層,場地內(nèi)均有分布,厚度較大,承載力較高,是良好的樁端持力層。,高30F,地下室一層,178。我公司將根據(jù)建筑基礎(chǔ)圖,國家有關(guān)施工技術(shù)規(guī)范,并根據(jù)業(yè)主、設(shè)計和監(jiān)理工程師的要求,融合以往類似工程的施工經(jīng)驗,編制詳細(xì)的施工組織設(shè)計,本著精心組織、精心施工、真誠為業(yè)主提供優(yōu)質(zhì)服務(wù)的原則,迅速及時合理地組織人員、設(shè)備進(jìn)場施工。二 設(shè)計要求 鉆孔壓灌砼樁:樁數(shù)共 63 根,樁徑216。(一)施工工藝流程圖(見下圖)商品砼理監(jiān)工程師鉆進(jìn)到設(shè)計深度、停鉆 鉆機(jī)對位調(diào)平測放樁位泵送砼提鉆泵送砼至設(shè)計超灌標(biāo)高、停泵、放籠、提鉆鉆機(jī)移位質(zhì)量監(jiān)督(二)樁體材料樁體原材料采用碎石,石屑,粉煤灰,水泥配置而成的C35細(xì)石商品混凝土,粗骨料采用碎石,最大粒徑不宜大于30mm。3)樁的施工允許偏差執(zhí)行《建筑地基處理技術(shù)規(guī)范》(JGJ792002)規(guī)定:①、樁徑允許偏差:177。4)施工時應(yīng)控制樁頂標(biāo)高高出設(shè)計標(biāo)高不少于500,設(shè)計圖紙和說明中樁長均為有效樁長.5)鋼筋籠制作偏差應(yīng)符合下列規(guī)定:主筋間距177。10mm。質(zhì)量目標(biāo)根據(jù)本工程特點及甲方要求,確定此分項工程質(zhì)量目標(biāo):“合格率達(dá)到100%,無重大質(zhì)量、安全事故”。三個控制階段即圍繞著施工全過程又涉及到過程中27個要素的具體內(nèi)容,抓住主要矛盾進(jìn)行控制,即起到提綱契領(lǐng),又能深入細(xì)致的檢查各項工作,及時發(fā)現(xiàn)隱患,及時予以糾正。3)、嚴(yán)格執(zhí)行各工序責(zé)任人本人簽字制度,確保參與施工的人員自始至終保持高度的責(zé)任感和質(zhì)量意識。(4)高程點引入現(xiàn)場經(jīng)檢查(誤差允許177。10mm;工程樁位小于20mm;水準(zhǔn)網(wǎng)小于5mm。3)、開鉆前必須檢查鉆頭上的契形出料活門是否閉合,嚴(yán)禁開口鉆進(jìn)。6)、壓灌與鉆桿提升配合好壞,將直接影響樁的質(zhì)量。為保證活門的打開,在鉆進(jìn)至設(shè)計標(biāo)高后鉆機(jī)空轉(zhuǎn)510秒再停鉆,將鉆頭上的泥甩開以保證活門打開。提鉆同時應(yīng)鏟除鉆桿上渣土。質(zhì)量控制技術(shù)措施:樁位控制:(1)樁位軸線測放后通知監(jiān)理工程師復(fù)測認(rèn)可后方可進(jìn)行下道工序。b、條形樁基沿軸線方向和群樁基礎(chǔ)中間樁,樁位允許偏差150mm。樁頂?shù)讟?biāo)高控制:(1)樁底標(biāo)高控制:根據(jù)建設(shè)單位提供的水準(zhǔn)點,會同建設(shè)方將設(shè)計177。100mm,樁徑允許偏差177。樁鋼筋 籠縱筋接頭應(yīng)采用焊接接頭,焊縫長度≥10d(單面焊,其中d為鋼筋直徑),應(yīng)盡量減少接頭,主筋在同一截面上的接頭數(shù)量不得超過50%,兩接頭間距≥900mm,箍筋采用螺旋箍, 12加勁箍須與縱向筋每隔一根點焊。樁基工程質(zhì)量檢查及驗收(1)成樁質(zhì)量檢查1)灌注樁的成樁質(zhì)量檢查主要包括成孔及清孔,混凝土灌注等三個工序過程的質(zhì)量檢查。3)及時檢查施工記錄,根據(jù)預(yù)定的施工工藝對工程樁進(jìn)行質(zhì)量評定,對于不合工藝要求的工程樁需根據(jù)其所在的位置、數(shù)量等具體情況,通過質(zhì)量分析,提出補(bǔ)強(qiáng)或增加附近工程樁等措施。對職工進(jìn)行安全教育,簽訂安全合同。做好新工人入場“三級”安全教育和新設(shè)備、新工藝的安全教育,努力提高全體員工安全意識和增強(qiáng)自我保護(hù)意識。鉆機(jī)在遇有六級以上大風(fēng)、大雨時停止作業(yè)。(2)施工人員每班12小時,每日施工兩班。 擬投入主要施工設(shè)備:序號機(jī)具名稱型號規(guī)格功率單位數(shù)量1長螺旋鉆機(jī)JZB26110KW臺12砼輸送泵HBT9090KW臺13電焊機(jī)XF30040KW臺3兩臺主設(shè)備及輔助設(shè)備用電量共計450kw.八、現(xiàn)場文明施工措施施工現(xiàn)場必須設(shè)有“五牌一圖,即:①施工單位及工地名稱牌;②安全生產(chǎn)紀(jì)律宣傳牌;③安全無重大事故宣傳牌;④工地主要管理人員名單牌;⑤農(nóng)民工工資保障承諾牌;施工現(xiàn)場總平面布置圖。材料堆放應(yīng)嚴(yán)格按照現(xiàn)場平面布置圖堆放,進(jìn)料數(shù)量嚴(yán)格按照計劃進(jìn)行。嚴(yán)格認(rèn)真執(zhí)行南寧市計劃生育管理辦法和外來人員暫住辦法,對現(xiàn)場外地工人必須辦理暫住證,協(xié)助公安機(jī)關(guān)進(jìn)行管理。 rule around the party discipline, disciplinary ruler requirements, listed as negative list, focusing on vertical gauge, draw the party organizations and Party members do not touch the bottom line . Here, the main from four square face two party rules of interpretation: the first part introduces two party Revised regulations the necessity and the revision process。 follow the correct direction, grasp the limited goals, adhere to the party39。 the second is concisely positive advocated by the lack of prohibited provisions excessive, no autonomy requirements。 third is the main discipline for the leading cadres, does not cover all Party members. Based on the above situation, need to the criterion of a clean and honest administration and rule the two is likely to be more relevant regulations first amendment. By revising, really put the authority of Party discipline, the seriousness in the party tree and call up the majority of Party members and cadres of the party constitution of party passes party consciousness. (II) two party regulations revision process the Central Committee of the Communist Party of China attaches great importance to two regulations revision . Xi Jinping, general books recorded in the Fifth Plenary Session of the eighth session of the Central Commission for Discipline Inspection, on the re