【正文】
ction all over, and acceptance. Boiler air and f lue gas ducts clean, clut t er fr ee, ext er nal oven sit e has been cleaned up. , ESP inst alat ion plet ion and accept ance of visa, waterf ilm dust colector pletes t he inst allation of approved wat er condit ions, gray t r ench cover under installat ion conditons, must pass t hr ough the channel t o t emporary walkway, pool not inst aled ar ound the r ailngs t o tempor ary fencing t o prevent persons falling r esidue. 5. 1. 9, the drum and t he expansion of t he indicator on t he header, should drum and set t he box to check the local inst alation of temporary inf lation indicat or . 5. 1. 10, t he wall built af t er t he manhole, inspect ion dor should be opened for nat ur al drying. , chosing a f urnace wall t emper at ure measurement point s accor ding t o the requirement s and sampling points t emperatur e m easur ing point s wit h t he f ol wing location: above t he bust ion chamber side wall f ur nace nonCent ral Of fice, at the outlet of t he f urnace, and economizer exit f lue, middle of back wall. belongs all valve t one, boiler system, and t he name is cor ect. , boiler f eed wat er fr ont open drum air door s, t o empty t he exhaust valve and t r aps the superheat er header , inj ect ed int o t he boiler af ter t reatment and soft ening water t o drum zero meter level, glass t ube level gauge should be clear and cor ect . , acres of fine f uels such as wood, coal, f uel m ust not be m ixed wit h ir on class t uf f. 5. 1. 15, accor ding t o prepar ed baking programme, t o t echnology t o give 4 A. 不按規(guī)定安裝后下部防護(hù)裝置 B. 不按規(guī)定安 裝車身反光標(biāo)識 C. 不按規(guī)定噴涂放大號 D. 不按規(guī)定安裝機(jī)動車號牌 答案: ABCD 10. 林某 駕車 以 110 公里 /小時 的速度 在 城市道路行駛, 與一輛機(jī)動車追尾 后 棄車逃離 被群眾攔下 。不按導(dǎo)向箭頭行駛) A. 一種違法行為 B. 二種違法行為 C. 三種違法行為 D. 四種違法行為 答案: C 5. 動畫 5 中有幾種違法行為。1, and pr epar ed accor ding t o 1. 1, and t herm al power engineering start ed debugging wor k pr ovides 1. 2, and t herm al power power plant constr uction engineering start ed and t he plet ed accept ance pr ocedur es 1. 3, and t herm al power unit start ed st eam Blowpipe guide is 1. 4, and t herm al power engineering adj ustment t ry shipped qualit y t est and t he evaluation standar d 2, and 1 f ur nace st art ed debuging or ganizat ion m easures and t he r elat ed pr ovides 2. 1, and or ganization Division: f or guar ant ee wide up t herm al power plant 1 f urnace start ed debugging and t he par t st eam m achine syst em of sm oot h vot ed shipped, special est ablished 1 f urnace t ry shipped pr ofessional gr oup, m em bers f ol wing: leader: Deput y Leader: supervision: crew: wide up t ry shipped per sonnel: wide up accept ance personnel: 2. 2, and ebugging, and t ry shipped cont ent: boiler auxilar y m achine Division debugging electr ic dust of Division t r y t ur ned and t he debugging baking f urnace Cook f ur nace boiler r ushed t ube, and blow sweep securit y door check , and oper ation provides and the Division: ① 1 f ur nace debugging, and t ry shipped by 1 f ur nace t r y shipped pr of essional gr oup r equir em ent s f or, which single t r y t ur ned and Division try shipped by xD three pany led is responsible for. ② all moving operation operation must be in strict accordance wit h t he pr ior aut horization of t he 1 boiler missioning pr ofessional wor king gr oup, and af t er st ar ting, t he t est m andapproved 1 furnace steps in the test programme, event of temporary changes be reported to headquarters approval. ③ missioning, t rial oper ation pr ocess is r equir ed f or each pr oj ect by Nort hwest elect ric power constr uction pany r eady equipment inst al t ion r ecor ds, and f il n t he t est application f orm, t he a and b sides af ter passing t he checks, f il n par tial missioni g checking bef or e a visa, r epor t ed head of t he approval, car ried out by t he leader of unif ied mand. About each action ar e m ade by t he leader of a unif ied m and, oper at ion af t er t he r eport o t he t eam leader . Wit hout he Dir ector39。(行駛中遮擋號牌,超速行駛) A. 一種違法行為 B. 二種違法行為 C. 三種違法行為 D. 四種違法行為 答案: B 4. 動畫 4 中有幾種違法行為 ? (遮擋號牌,闖紅燈。s consent shal not unilat er ally m ake any st ar tup operat ion, such as single operations, who is r esponsible for all securit y r esponsibilt ies, wit h no t ies to t he other side. ⑤ all before the first turn of the motor, must be approved by both parties a mon rol insulation measurement can be carried out properly. ⑥ After the end of each project missioning, fil n partial acceptance visa trial shipments. As motor in r ot at ing equipment missioning t est swit ch and mechanical par t of their t r ial cannot cont inuously, t his is considered two t est project s hal be car ried out according t o t he above f our steps. 2. 4, and att ached wor k votes issued people, and license people, and wor k head list : par ty elect rical f ir st species, and second species wor k votes license people list : part y engine wor k vot es license people list : b electr ical f ir st species, and second species work vot es issued people: b hot contr ol pr ofessional issued people list : b hot cont rol pr ofessional wor k head: b steam machine professional wor k votes issued people: b st eam m achine pr of essional wor k votes head: b boiler professional wor k vot es issued people: b boiler prof essional work votes head: att ached: about personnel of cont act phone part y b Division 3, boiler auxilar y equipment debuging scenar ios 3. 1, send, induced draft fan tr y t urned , t ry t ur ni g t he f ormer r equir ement s of : , f an body and motor installed, based the second Gr outing ends, and t he concrete str ength is up. 3. 1. 1. 2, coupling the Cent re has f inished aligning st andar ds, approved visa. , bearing clear ance normal out er r ims and bear ing clearance is up t o st andar d. , Benton . . Condit i