【正文】
ng the material is too long. The whole contract period is only 1 month+. Please reduce to reasonable time frame. They are submiting perforamnce bond right? Cannot find in the LOA. Thanks.With regards to Qn No. 2, our suggestion is to go for champagne color powder coat instead to match the rest of the developmentFor the qualification of the tenderer, Main con called to advise that they will provide the qualification of the firm that they are working with in due course, which I think is ok given the tight timeline (caroline – is this ok with you ? pls advise).For design/drawings – sonny pls follow up asap.For contract provisions – yan mei pls follow up asap.By copy of this mail, appreciate Amy, Michelle and Caroline can help review in parallel and revert with your ments, if any, in parallel.Please understanding that we are calling several contracts in parallel in order to meet the tight timeline and your assistance in the above are appreciated.With regards to Qn No. 2, our suggestion is to go for champagne color powder coat instead to match the rest of the developmentPlease reply to question number 2 as a matter of urgency so DLS can reply to the tenderers.Pls include in your prelim assessment and provide the prelim assessment on Monday morningPlease reply to the following urgently. The tenderers need to do some design development as part of their tender return so we need to give some more lead timeAs per discussed yesterday, please provide the followings:1. SKK spray paint finish as a replacement material for stone cladding as indicated in Capol’s drawing. Please provide the specification for tenderers.4. Door finish.7. Please provide design intent writeup for the canopy as indicated in Capol’s drawing.Please provide in Chinese for the above where possible as we are dealing with local contractors.For the qualification of the tenderer, Main con called to advise that they will provide the qualification of the firm that they are working with in due course, which I think is ok given the tight timeline (caroline – is this ok with you ? pls advise).For design/drawings – sonny pls follow up asap.For contract provisions – yan mei pls follow up asap.By copy of this mail, appreciate Amy, Michelle and Caroline can help review in parallel and revert with your ments, if any, in parallel.Please understanding that we are calling several contracts in parallel in order to meet the tight timeline and your assistance in the above are appreciatedPer our concall for the Lift Supply LOA – ments/concensus as follow as noted by QS in the attached :1. item – order of listing – suggest update the special conditions instead2. item (3) – maintain 75% max per agreement during tender clarifications3. item (d) – suggest amend the minor error when signing the contract4. item (3) – same as item 2 above.5. other queries – as clarified by QS.As the above items have been clarified, there is no more issue with the supply LOA which KONE had stamped and returned. QS will update on the special conditions and installation LOA separately for discussion/concall asap (Jerry pls target for Friday afternoon say 4pm as spoken)Per our concall for the Lift Supply LOA – ments/concensus as follow as noted by QS in the attached :6. item – order of listing – suggest update the special conditions instead7. item (3) – maintain 75% max per agreement during tender clarifications8. item (d) – suggest amend the minor error when signing the contract9. item (3) – same as item 2 above.10. other queries – as clarified by QS.As the above items have been clarified, there is no more issue with the supply LOA which KONE had stamped and returned. QS will update on the special conditions and installation LOA separately for discussion/concall asap (Jerry pls target for Friday afternoon say 4pm as spoken)As per discussed yesterday, please provide the followings:2. SKK spray paint finish as a replacement material for stone cladding as indicated in Capol’s drawing. Please provide the specification for tenderers.5. Door finish.8. Please provide design intent writeup for the canopy as indicated in Capol’s drawing.Please provide in Chinese for the above where possible as we are dealing with local contractors.Appreciate if you could clear the attached contract. I will go through at my end in parallel.1. I have no further ments on both the bond and advance payment bond, however, as there are deviations from the format given for the bond, please ensure that clearance is obtained from May Lan, Edward and Tracy as per SOP requirements.2. Also, if the 2 bonds are not from the big 4 banks here, please obtain clearance from May Lan as wellFor update, phase 2 main contract is being signed by SCG and they target to return by next Monday. Appreciate your URGENT review and revert your ments, if any, on the related performance bonds per attached for QS/SCG follow up on activationcalled me this morning. He mentioned that main con would like to deduct the Pamp。n更多企業(yè)學(xué)院: 《中小企業(yè)管理全能版》183套講座+89700份資料《總經(jīng)理、高層管理》49套講座+16388份資料《中層管理學(xué)院》46套講座+6020份資料5 – To remove the priced BQ from these 2 sets of documents if the BQ has been superseded by the contract BQ.3. Contract BQ – Is the design for the main entrance door type FM乙4 () the same as the Public Area timber fire door type FM乙4 ()? If it’s the same thing, please readjust the rates to tie in with each other.4. Is the BQ given plete? The total cost shown under the Contract BQ (RMB975,) does not tie up with the awarded sum (RMB1,210,).5. 專用條件a) The item in the contents page does not match with the actual clause. is know as 竣工報備in the contents page but is reflected as 竣工報表 in the actual clause.b) Clause , subclause on page SCC/38. Reference is made to clause of the 投標(biāo)須知 in paragraph 1. The 投標(biāo)須知 is not part of this contract, so please check to ensu