freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

哈爾濱音樂學(xué)院教學(xué)樓設(shè)計-全文預(yù)覽

2025-02-06 09:45 上一頁面

下一頁面
  

【正文】 G+EA2B2G-EB2C2G+EB2C2G-EA3B3G+E續(xù)表214A3B3G-EB3C3G+EB3C3G-EA4B4G+EA4B4G-EB4C4G+EB4C4G-EA5B5G+EA5B5G-EB5C5G+EB5C5G-E根據(jù)抗震規(guī)范可知,框架柱端截面組合的剪力設(shè)計值應(yīng)調(diào)整為:V =ηvc (Mc上+Mc下)/Hn ()其中, Hn為相鄰層柱的反彎點之間的距離,一般取柱高 Mc上為柱上端的彎矩值 Mc下為柱下端的彎矩值 對三級框架柱, 則柱端剪力設(shè)計值調(diào)整計算表如下:表215 柱端剪力設(shè)計值調(diào)整計算表桿件組合類別Hn (m)M柱上(KNM 按強剪弱彎要求對柱端、梁端剪力進行調(diào)整為保證梁柱的延性,梁端及柱端的抗剪能力應(yīng)大于其抗彎能力。對A柱:在G+E組合下,MC = = KNG+EA1G-E-----B1G+EB1G-E-----A2G+EA2G-E-----B2G+EB2G-E-----A3G+EA3G-E-----B3G+E-B3G-E-------A4G+EA4G-E-B4G+E--B4G-E-------A5G+EA5G-EB5G+E-----B5G-E-----表中的Mtc上 = Mc上/∑Mc ηc 。彎矩調(diào)幅只對豎向荷載作用下的內(nèi)力進行,水平荷載作用下的彎矩不參加調(diào)幅。:A、梁彎矩以使梁下部受拉為正,上部受拉為負; B、柱彎矩以使柱左側(cè)受拉為正,右側(cè)受拉為負;C、剪力以使桿端順時針轉(zhuǎn)為正,逆時針轉(zhuǎn)為負;D、軸力以使桿件受拉為正,受壓為負。(2)因為風荷載效應(yīng)同地震作用效應(yīng)相比較小,不起控制作用,則在下列組合中風荷載內(nèi)力未參與,僅考慮分別由恒荷載和活荷載控制的兩種組合,①+③①+③兩列。柱分為邊柱和中柱,每根柱有2個控制截面。節(jié)點C:需分配的總不平衡彎矩其它節(jié)點照此運算。 內(nèi)力計算 (所有荷載值均取用荷載標準值) 恒荷載作用下的內(nèi)力計算用迭代法進行計算 圖中梁上分布荷載由梯形和三角形兩部分組成,在求固端彎矩時先將梯形和三角形分布荷載。由于本建筑地處6度地震區(qū),且高度≤30m,由《混凝土結(jié)構(gòu)設(shè)計規(guī)范》可知框架的抗震等級為三級,要求x≤,即,故(滿足)。⑴作用于屋面梁及各層樓面梁處的重力荷載代表值為屋面梁處: =結(jié)構(gòu)和構(gòu)件自重+50%雪荷載 樓面梁處: =結(jié)構(gòu)和構(gòu)件自重+50%活荷載 其中結(jié)構(gòu)和構(gòu)件自重取樓面上、下1/2層高范圍內(nèi)(屋面梁處取頂層的一半)的結(jié)構(gòu)及構(gòu)件自重(包括縱、橫梁自重,樓板結(jié)構(gòu)層及構(gòu)造層,縱、橫墻體及柱等自重)。樓面:,準永久值系數(shù).作用于頂層框架梁上的線荷載: ==作用于中間層框架梁上的線荷載: ==作用于頂層邊節(jié)點的集中荷載: =1/21/2=作用于頂層中間節(jié)點的集中荷載:=(1/21/2+)=作用于中間層邊節(jié)點的集中荷載: =1/21/2=作用于中間層中間節(jié)點的集中荷載:=(1/21/2+)= 風荷載標準值計算風荷載標準值計算公式為 ()風壓高度變化系數(shù)按地面粗糙度C類取用,因結(jié)構(gòu)高度H=30m,可取=;對于矩形平面=;可查荷載規(guī)范,當查得的,取=。 為了便于施工,中跨梁的尺寸與邊跨的尺寸一致。由于各層柱的截面尺寸不變,故梁跨等于柱截面形心軸線之間的距離。 其他結(jié)構(gòu)選型 (1)樓層、屋面結(jié)構(gòu):全部采用現(xiàn)澆混凝土板結(jié)構(gòu),屋面板按不上人屋面的使用荷 載選用。 。 工程概況 本工程是一五層教學(xué)樓綜合建筑主體共五層。每層設(shè)男女衛(wèi)生間各兩個,現(xiàn)澆混凝土框架結(jié)構(gòu),抗震設(shè)防烈度按6度考慮。 全部采用加氣混凝土砌塊填充墻,外墻和內(nèi)墻厚度均為240mm。 ⑴窗臺高度:,靠走廊處設(shè)高窗,; ⑵采光通風:按窗地比大小規(guī)定設(shè)置窗戶尺寸,走廊內(nèi)墻設(shè)高窗,走廊兩段設(shè)落窗以滿足走廊內(nèi)采光要求,門窗相對,利用穿堂風解決自然通風問題; ⑴屋面排水:采用有組織排水,按2%排水坡度把屋面降水有組織地排到天溝,通過落水管排到地面,防水材料采用聚氨酯防水涂料。據(jù)設(shè)計任務(wù)書的要求及規(guī)范規(guī)定,本著設(shè)計標準化、構(gòu)建生產(chǎn)標準化、施工機械化的原則,本方案設(shè)計盡可能采用標準圖集,考慮施工方便,采用長方形柱網(wǎng)布置,鋼筋混凝土框架結(jié)構(gòu)。 自然條件(1)溫度:最熱月平均310C,冬季極端最低80C。關(guān)鍵詞: 框架;結(jié)構(gòu)設(shè)計;抗震設(shè)計 AbstractThis is a teaching building of a university. It has five stories, and the height of the every storey is meters. The building area of this engineering square meter, height is meter. Building the intake workinteger arranges for L form, the structure is now to sprinkle the steel concrete framing structure, anti the earthquake establishes to defend strong kilowatt hour as 7 kilowatt hour, anti earthquake order is xrated. Structural design the hour take a has the representative framing proceeds the design. In the calculation of internal forces,permanent load function uses iterative method o carry on the putation , while variable load uses the delamination to carry on the putation,level quake function adoption the bottom shearing force logarithm of timw fitting method logt putes, inner force putation inside perpendicular lading function adoption the layering logarithm of timw fitting method logt proceeds the putation, the level lading function adopts the worth logarithm of timw fitting method logt in D proceeds the putation, inner force articulation consider not anti earthquake bine to shake the articulation with the hour of design considers the weak beam, strong shear in strong stanchion is weak curved of principle proceeding inner force readjustment. Finally to the stair way designWhen the directions of the frames is determined, firstly the weight of each floor is calculated. The seismic force can be assigned according to the shearing stiffness of the frames of the different axis. Then the internal force (bending moment, shearing force and axial force ) in the structure under the horizontal loads can be easily calculated. After the determination of the internal force under the dead and live loads, the bination of internal force can be made by using the Excel software, whose purpose is to find one or several sets of the most adverse internal force of the wall limbs and the coterminous girders, which will be the basis of protracting the reinforcing drawings of the ponents. The design of the stairs is also be approached by calculating the internal force and reinforcing such ponents as landing slab, step board and landing girder whose shop drawings are pleted in the end. Keywords : frames, structural design, antiseismic design目 錄摘 要 IAbstract II第1章 建筑設(shè)計說明書 1 場地圖 1 工程概況 1 工程名稱 哈爾濱音樂學(xué)院教學(xué)樓 1 工程類型 多層教學(xué)建筑 1 工程規(guī)模 1 自然條件 1 2 建筑設(shè)計說明 2 平面設(shè)計 2 2 2 2 3 3 3第2章 教學(xué)樓結(jié)構(gòu)設(shè)計說明書 7 工程概況 7 本工程是一五層教學(xué)樓綜合建筑 7 本工程采用框架結(jié)構(gòu) 7 本工程抗震設(shè)防烈度為7度。 在確定框架布局之后,先進行了層間荷載代表值的計算,接著利用頂點位移法求出自震周期,進而按底部剪力法計算水平地震荷載作用下大小,進而求出在水平荷載作用下的結(jié)構(gòu)內(nèi)力(彎矩、剪力、軸力)。黑龍江東方學(xué)院本科畢業(yè)設(shè)計哈爾濱音樂學(xué)院教學(xué)樓設(shè)計摘 要本工程是教學(xué)樓,共五層,,建筑總體布置為一字形,結(jié)構(gòu)為現(xiàn)澆鋼筋混凝土框架結(jié)構(gòu),抗震設(shè)防烈度為6度,抗震等級為三級。截面設(shè)計時考慮“強柱弱梁、強剪弱彎”的原則進行內(nèi)力調(diào)整,最后進行了樓梯設(shè)計。此外還進行了結(jié)構(gòu)方案中的室內(nèi)樓梯的設(shè)計,完成了平臺板,梯段板,平臺梁等構(gòu)件的內(nèi)力和配筋計算及施工圖繪制。 9 結(jié)構(gòu)選型 9 結(jié)構(gòu)體系選型 9 其他結(jié)構(gòu)選型 9 樓板及屋面板的設(shè)計 13 荷載統(tǒng)計 13 板的配筋計算 18 框架結(jié)構(gòu)荷載標準值計算 (取一榀框架為計算單元) 21 恒荷載標準值G 21 核算框架梁柱截面尺寸及框架水平位移 28 內(nèi)力計算 (所有荷載值均取用荷載標準值) 31 恒荷載作用下的內(nèi)力計算 31 活荷載作用下的內(nèi)力計算 39 57 內(nèi)力組合 58 考慮梁端彎矩調(diào)幅 59 按強剪弱彎要求對柱端、梁端剪力進行調(diào)整 61 框架內(nèi)力組合 65 66 66 強剪弱彎的要求 67 梁、柱截面配筋計算 69 梁截面設(shè)計 69 柱截面設(shè)計 75 樓梯
點擊復(fù)制文檔內(nèi)容
環(huán)評公示相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1