freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

工程碩士論文:關(guān)山水庫工程項目后評價研究-全文預(yù)覽

2025-06-24 08:40 上一頁面

下一頁面
  

【正文】 民和綜合后評價系統(tǒng)的內(nèi)容、特征, 建立了評價體系 ,并將 兩種評價方 法 (模糊綜合評價法和層次分析法) 相結(jié)合對關(guān)山水庫工程項目后評價指標(biāo)體系進(jìn)行了全面評價,其評價結(jié)果對于關(guān)山水庫工程建設(shè)管理者和項目決策者具有啟示和借鑒作用。 最后論文總結(jié)取得的研究成果并提出了進(jìn)一步 的 研究方向 。本文還致力于 推廣多種系統(tǒng)綜合評價方法的結(jié)合與應(yīng)用。s social, economic and ecological development. To promote regional’s development. Effective and objective project post evaluation of Guan Shan reservoir can make the reservoir management decision makers learn lessons 、 raise the level of decision making and improve the investment efficiency of Guan Shan reservoir. Referring existing theory and method of water construction project Guan Shan reservoir engineering, content and features of immigration and integrated detailed evaluation indicators system. The full post evaluation of indicators system of Guan Shan reservoir project is obtained with the bination of AHP and fuzzy integrated evaluation law. Its evaluation results has inspiration and reference role for Guan Shan reservoir engineering construction managers and project decision makers. In first, the theories, and research progress of postproject evaluation are described. The characteristics and development of post evaluation on construction project of Water Conservancy in China are analyzed in detail. Followed, the basic theory and method of post evaluation of water construction project in China are introduced in system. The content, features and building method of evaluation indicators system are summed an analyzed. The related features of integrated evaluation method of existing water construction project are discussed and the basic models are developed. Again, taking into account the particular characteristics of Guan Shan reservoir project are studied and conclusions are drawn based on the above indicator system and evaluation methods. At last, the research results are summed and a further study direction is given. In the construction of post evaluation index system of Guan Shan reservoir, immigration system is separated with other system taking into account the characteristics of the immigration system. The system of evaluation indicators is refined reflecting the bination of theory and practice of water conservancy construction project evaluation. At the same time, the analytic hierarchy process and fuzzy prehensive evaluation are bined on the prehensive evaluation of index. The important conclusion is drawn. The study results of the thesis consistent with the practice and give the enlightenment for construction manager of Guan Shan reservoir. It is an unprecedented approach. Establishment of the index system is aimed at the exploration of allround, multiangle prehensive integrated evaluation index system of water conservancy construction project. And also, this thesis promotes a variety of bination and application of prehensive evaluation methods. It is hoped that the study results can provide some references on the theory, method and practice for evaluation practitioners of water conservancy construction projects. 遼寧石油化工大學(xué)工程碩士學(xué)位論文 4 Key words: post evaluation of water conservancy construction project, post evaluation index system, the analytic hierarchy process, fuzzy prehensive evaluation method 遼寧石油化工大學(xué)工程碩士學(xué)位論文 5 目錄 1 緒論 ...................................................................................................... 7 研究背景及意義 ............................................................................. 7 研究背景 .................................................................................. 7 研究意義 .................................................................................. 7 項目后評價研究現(xiàn)狀 .................................................................... 8 項目后 評價概述 ....................................................................... 8 項目后評價的研究動態(tài) ........................................................ 10 我國水利建設(shè)項目后評價的特點、原則及研究動態(tài) .......... 13 研究內(nèi) 容、框架與方法 ............................................................... 16 研究內(nèi)容 ................................................................................ 16 研究框架 ................................................................................ 16 研究方法 ................................................................................ 17 論文的創(chuàng)新點 .............................................................................. 17 2 水利建設(shè)項目后評價的基本理論 .................................................... 18 水利建設(shè)項目后評價的內(nèi)容 ....................................................... 18 過程后評價 ............................................................................ 18 經(jīng)濟(jì)后評價 ............................................................................ 19 影響后評價 ............................................................................ 20 可持續(xù)性后評價 ..................................................................... 21 移民后評價 ............................................................................. 21 水利建設(shè)項目后評價體系的構(gòu)建原則 ....................................... 22 關(guān)山水庫工程項目后評價的方法 ............................................... 23 層次分析法 ............................................................................. 24 模糊綜合評價法 ..................................................................... 26 3 關(guān)山水庫工程后評價 ........................................................................ 27 關(guān)山水庫工程概況 ...................................................................... 27 自然地理概括 ......................................................................... 28 社會經(jīng)濟(jì)概況 ......................................................................... 29 遼寧石油化工大學(xué)工程碩士學(xué)位論文 6 工程建設(shè)概括 ......................................................................... 29 水庫淹沒及移民安置 ............................................................. 30 關(guān)山水庫工程移民后評
點擊復(fù)制文檔內(nèi)容
研究報告相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1