freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

會計(jì)學(xué)外文翻譯:中國建筑行業(yè)的成本控制-建筑結(jié)構(gòu)-全文預(yù)覽

2025-06-16 16:36 上一頁面

下一頁面
  

【正文】 lification Control Qualification control in China is a system under which a professional organization or a professional has to achieve a professional qualification or being registered in a recognized professional qualification system before it can carry out its professional services allowable under the Law. 。imgname=433_Cost+Engineering+in+Chinese+Construction+ ) Cost Control in the Chinese Construction Sector Abstract China has been moving away from a planned economy system towards a market cost engineering system in China has also been evolving to suit this socialist economy system. The paper examined the recent development of some elements of cost engineering relating to the construction sectors as follows and provided some ments thereon : ? The cost control process 5 key stages of cost assessment ? Tendering and Bidding System ? Bills of Quantities and Allinrates ? Contract Forms ? Qualifications Control The Cost Control process – 5 key stages of cost assessment Due to the heavy capital investment, long construction period and plex nature of construction projects, the cost control process normally involves 5 key stages of cost estimating and assessment over the lifespan of a project, each using different calculation and estimating methods. Stage This is an important document for making decisions as to the feasibility of the project. It sets down the budget limit for a project which normally should not be exceeded. Due to the limited information available at this feasibility stage the estimate would just be a rough indication of costs based on historical data. Design Stage This estimate is an update of the Feasibility Estimate upon receipt of subsequent design development information. This document is essential in supporting the submission of the Preliminary design to the Government Planning Department for approval. If the Preliminary Estimate exceeds the budget set in the feasibility estimate either additional funding is to be sought or a revision to the design is required to bring down the estimate to within the budget. Design Stage This estimate is prepared on the basis of an itemized buildup according to the recognized rules and method of measurement, after pletion of the detailed construction drawings. Under a tender situation if this estimate is pleted by the Developer then it can be used as the Pretender Estimate which must be submitted to the Tender Bureau for record purposes. The Pretender Estimate, duly signed and stamped by a Registered Cost Engineer, is also a prerequisite for the issue of the Construction Permit for the Works. If the tender sums received are deviated from the Pretender Estimate and the deviation amount is beyond the limits set out in the marking scheme for the tender assessment, the tender exercise has to be cancelled and a retender action is to be carried out. Stage These are the cost assessments carried out during the construction stage in order to determine the value of work ex
點(diǎn)擊復(fù)制文檔內(nèi)容
畢業(yè)設(shè)計(jì)相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1