freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

外文翻譯---fidic合同對(duì)承包商的約定-全文預(yù)覽

  

【正文】 on. However, the Contractor may retain on Site, during the Defects Notification Period, such goods as are required for the Contractor to fulfill obligations under the Contract. 24 Fossils All fossils, coins, articles of value or antiquity, and structures and other remains or items of geological or archaeological interest found on the Site shall be placed under the care and authority of the Employer. The Contractor shall take reasonable precautions to prevent Contractor’s Personnel or other persons from removing or damaging any of these findings. The Contractor shall, upon discovery of any such finding, promptly give notice to the Employer, who shall issue instructions for dealing with it. If the Contractor suffers delay and/or incurs Cost from plying with the instructions, the Contractor shall give a further notice to the Employer and shall be entitled subject to SubClause [Contractor’s Claims] to: (a) an extension of time for any such delay, if pletion is or will be delayed, under SubClause [Extension of Time for Completion],and (b) payment of any such Cost, which shall be added to the Contract Price. After receiving this further notice, the Employer shall proceed in accordance with SubClause [Determinations] to agree or determine these matters. FIDIC合同對(duì)承包商的約定 –1– FIDIC 合同對(duì)承包商的約定 國(guó)際咨詢工程師協(xié)會(huì) 關(guān)鍵詞:雇主, 合同,承包商 1 承包商的一般義務(wù) 承包商應(yīng)按照合同設(shè)計(jì)、實(shí)施和完成工程,并修補(bǔ)工程中的任何缺陷。 (b) copies of quality assurance document documents, test results and certificates of Materials。 and (c) the Contractor shall indemnify and hold the Employer harmless against and from all damages, losses and expenses (including legal fees and expenses) resulting from the transport of Goods, and shall negotiate and pay all claims arising from their transport. 17 Contractor’s Equipment The Contractor shall be responsible for all Contractor’s Equipment. When brought on to the Site, Contractor’s Equipment shall be deemed to be exclusively intended for the execution of the Works. 18 Protection of the Environment The Contractor shall take all reasonable steps to protect the environment (both on and off the Site) and to limit damage and nuisance to people and property resulting from pollution, noise and other results of his operations. The Contractor shall ensure that emissions, surface discharges and effluent from the Contractor’s activities shall not exceed the values indicated The Contractor of FIDIC –9– in the Employer’s Requirements, and shall not exceed the values prescribed by applicable Laws. 19 Electricity, Water and Gas The Contractor shall, except as stated below, be responsible for the provision of all power, water and other services he may require. The Contractor shall be entitled to use for the purposes of the Works such supplies of electricity, water, gas and other services as may be available on the Site and of which details and prices are given in the Employer’s Requirements. The Contractor shall, at his risk and cost, provide any apparatus necessary for his use of these services and for measuring the quantities consumed. The quantities consumed and the amounts due (at these prices) for such services shall be agreed or determined in accordance with SubClause [Employer’s Claims] and SubClause [Determinations]. The Contractor shall pay these amounts to the Employer. 20Employer’s Equipment and FreeIssue Material The Employer shall make the Employer’s Equipment (if any) available for the use of the Contractor in the execution of the Works in accordance with the details, arrangements and prices stated in the Employer’s Requirements. Unless otherwise stated in the Employer’s Requirements: (a) the Employer shall be responsible for the Employer’s Equipment, except that (b) the Contractor shall be responsible for each item of Employer’s Equipment whilst any of the Contractor’s Personnel is operating it, driving it, directing it or in possession or control of it. The appropriate quantities and the amounts due (at such stated price) for the use of Employer’s Equipment shall be agreed or determined in accordance with SubClause [Employer’s Claims] and SubClause [Determinations]. The Contractor shall pay these amounts to the Employer. The Employer shall supply, free of charge, the “freeissue material” (if any) in accordance with the details stated in the Employer’s Requirement. The Contractor of FIDIC –10– The Employer shall, at his risk and cost, provide these materials at the time and place specified in the contractor. The Contractor shall then visually inspect them, and shall promptly give notice to the Employer of any shortage, defect or default in these materials. Unless otherwise agreed by both Parties, the Employer shall immediately rectify the notified shortage, defect or default. After this visual inspection, the freeissue materials shall e under the care, custody and control of the Contractor. The Contractor’s obligations of inspection, care, custody and control shall not relieve the Employer of liability for any shortage, defect or default not apparent from a visual inspection. 21 Progress Reports Unless otherwise stated in the Particular Conditions, monthly progress reports shall be prepared by the Contractor and submitted to the Employer in six copies. The first report shall cover the period up to the end of the first calendar month following the Commencement Date. Reports shall be submitted monthly thereafter, each within 7 days after the last day of the period to which it relates. Reporting shall continue until the Contractor has pleted all work which is known to be outstanding at the pletion date stated in the TakingOver Certificate for the Works. Each report shall include: (a) charts and detailed descriptions of progress,
點(diǎn)擊復(fù)制文檔內(nèi)容
畢業(yè)設(shè)計(jì)相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1