freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

法液空吊裝作業(yè)培訓(xùn)中英文雙語(yǔ)版alhzhse_training009(文件)

 

【正文】 on certificate by the technical supervision bureau shall be kept by the ALHZ Site HSE Lead Engineer. 作業(yè)人員(操作員、指揮員、起重工等等)的資格證書(shū)和技術(shù)監(jiān)督局的起重機(jī)技術(shù)檢驗(yàn)證書(shū)應(yīng)由 ALHZ現(xiàn)場(chǎng)的 HSE現(xiàn)場(chǎng)主管保管 Broken Track Qualification資質(zhì) 20 Lifting authorization Work Permit 起重許可證和操作許可證 ? For lifting activities on site, as per the CGS10101 procedure, the following rules apply: 根據(jù) CGS10101 程序,現(xiàn)場(chǎng)起重操作需遵守以下規(guī)則 ? On site: ? During construction, pipes lifting and hoisting are considered as “routine work”. Thus they only require a general work permit (CFRM10101). If the load exceeds 10 tons, then the work is considered as heavy lifting and a lifting authorization (CFRM902) is required (such as columns, exchangers, machines, etc.). That lifting authorization is an attachment to the work permit. Refer to EGS931. ? During missioning, whatever is the weight of the load, a lifting authorization is required. ? 現(xiàn)場(chǎng) ? 在施工期間,由于管道提升和吊裝被視為“常規(guī)操作”,所以只需一般的操作許可證 (CFRM10101)即可。 ? In MF: the procedure CPR1702 Inhouse Safe Work Permit shall be respected. ? 在制造部:根據(jù) CPR1702程序的規(guī)定,需要具備室內(nèi)安全作業(yè)許可證 21 Lifting appliances起重機(jī)組成 Crane introduction 起重機(jī)指示 22 術(shù)語(yǔ) 23 ? Wire rope鋼絲繩 Lifting appliances 吊裝用具 SWL=safety working load 安全工作載荷 Ensure the correct wire rope is used. Use a wire rope of a greater whenever the exact weight of the load is unknown or there is a hazard to personnel. 確保使用正確的鋼絲繩。 ? 貨物要在吊鉤中間,不得用吊鉤的尖端起吊。 ? 合金鋼鏈環(huán)不得重新焊接,必須由制造商更換。通過(guò)鏈環(huán)的磨損和裂痕、鏈環(huán)的拉伸或鏈環(huán)的綁扎情況辨別是否可以拉伸。 ? 載重不能超過(guò)吊鉤的額定載重能力。根據(jù) EGS931起重許可證為作業(yè)許可證的附件。 Background 背景 8 Improper loads or speeds can result in the tipping of the crane 不合理的載重或者速度會(huì)導(dǎo)致起重機(jī)側(cè)翻。此次事故導(dǎo)致封頭側(cè)的法蘭以及管口撞彎,同時(shí)導(dǎo)致整個(gè)換熱器框架彎曲成波浪狀。 4 Background 背景 Description 描述 Inspection to tower crane equipment acted on July 06 and defects are noted as below: 7月 6日對(duì)塔吊進(jìn)行檢查,其缺點(diǎn)如下: ? Parts of tower crane platform and strutting structure deformed and damaged. ? 塔吊的部分平臺(tái)以及鋼結(jié)構(gòu)發(fā)生變形和損害。因?yàn)楫?dāng)時(shí)貨物與起重機(jī)的距離為 18米,超過(guò)了 25噸起重機(jī) 16米的工作半徑。CRANE 起重機(jī) ALHZ HSE_training 009a. Based on CGS1702A JHA() HSE plan Table of content Background 背景 Objective目的 Definition of crane起重機(jī)定義 Risk analysis風(fēng)險(xiǎn)分析 Risks precautions 風(fēng)險(xiǎn)的預(yù)防 Summary 總結(jié) 2 Background 背景 Description 描述 On July 13th, MCC is unloading the weight of 80t crane from truck. Due to space limit, the working position of 25t crane can not fulfill this mission. The distance between 3t weight and crane is 18m, which is beyond the 25t crane39。由于空間的限制, 25噸起重機(jī)工作的位置無(wú)法完成吊裝任務(wù)。 3 Background 背景 Description 描
點(diǎn)擊復(fù)制文檔內(nèi)容
教學(xué)課件相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1