【正文】
E lead engineer for approval. ? 在施工或調試現(xiàn)場實施起重作業(yè)前 , 假如起重設備重量等于或超過 10噸,分包商需在作業(yè)前制訂起重計劃,并交由 ALHZ現(xiàn)場 HSE 主管確認 ? Before executing a lifting job in MF, if the weight of the lifting equipments equal or more than 30t, the lifting team shall develop a lifting plan and submit to ALHZ MF HSE manager for approval. ? 在制造部實施起重作業(yè)前 , 假如起重設備的重量等于或超過 30噸,起重小組需在作業(yè)前制訂起重計劃,并交由 ALHZ現(xiàn)場 HSE 主管確認 17 Risks precautions 風險預防 The lifting plan shall cover:起重計劃包括: ? Route that transport will take to position of the load to lifting ? 裝載到起重地點的路線 ? Initial lifting of the load including radius ? 貨物的初步起吊(包括半徑 ) ? Final placement position of the load including radius ? 最后卸載地點(包括半徑) ? Location of the crane起重機的位置 ? Obstruction/equipment/facilities in the vicinity of lifting operation ? 起重作業(yè)附近的阻礙物 /設備 /設施 ? Safety measures/precaution to ensure safe lifting ? 為確保起重安全的安全措施 /預防措施 18 Risks precautions 風險預防 Lifting equipment selection 起重裝備的選擇 Make sure the crane selection can satisfy the: 確保選擇的起重機滿足: ? Rated Load Capacities額定裝載量 ? Operating Speeds運行速度 ? Location of center of gravity 重心位置 ? Special handling requirements特殊操作要求 Load Rating Chart 19 Risks precautions 風險預防 All crane and lift equipment operators on the ALHZ site shall be qualified in accordance with GB codes and related AL rules 根據國標的規(guī)定和相應的 AL條例, ALHZ現(xiàn)場所有的吊車和起重機操作員須有相應的資質 The petent person must inspect all machinery and equipment prior to each use, and during use, to make sure it is in safe operating condition. 在使用之前和使用過程中,有資質的人員要對機械以及設備方面進行檢查,確保其處于安全使用范圍。 ? No screw bolt fastened for meeting stile joint, only binding by iron wire. ? 平臺階梯結合處的螺栓沒有擰緊,且僅僅通過鐵絲來固定。s working radius 16m. To save time, the crane39。這個危險的吊裝行為導致起重機的后方支撐腿離開地面 50毫米。 The middle part of the crane stands on the foundation of the beam which prevents the crane downward together with its foreside 起重機的中部坐落一根梁上, 導致起重機不能與其前部同時向下運動 。 ? In MF: the procedure CPR1702 Inhouse Safe Work Permit shall be respected. ? 在制造部:根據 CPR1702程序的規(guī)定,需要具備室內安全作業(yè)許可證 21 Lifting appliances起重機組成 Crane introduction 起重機指示 22 術語 23 ? Wire rope鋼絲繩 Lifting appliances 吊裝用具 SWL=safety working load 安全工作載荷 Ensure the correct wire rope is used. Use a wire rope of a greater whenever the exact weight of the load is unknown or there is a hazard to personnel. 確保使用正確的鋼絲繩。 ? 合金鋼鏈環(huán)不得重新焊接,必須由制造商更換。 ? 載重不能超過吊鉤的額定載重能力。 Background 背景 8 Improper loads or speeds can result in the tipping of the crane 不合理的載重或者速度會導致起重機側翻。