freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

土木工程材料第四章(文件)

2025-09-10 08:57 上一頁面

下一頁面
 

【正文】 0mm Procedure of Slump test a. Fill the cone using standard procedure b. Strike off excess c. Raise the mold and measure the displacement of the original center of the specimen Slump ? In the slump test, the number of mm the original center of the cone sinks or settles uniformly is measured to the nearest 5 mm. The measurement is called slump. ? . slump can be 75, 80, 85mm, etc. Types of slump ? Nearzero slump ? Very dry mix ? Normal slump ? Properly proportioned concrete ? Shear slump ? Concrete lacks plasticity and cohesion ? Collapse slump ? Lean, harsh or extremely wet concrete Remended slumps for various type of construction Type of construction Slump (mm) Max Min Footings, caissons, foundation walls and substructure walls 75 25 Beams, columns and walls 100 25 Pavement and slabs 75 25 Mass concrete 50 25 Factors affecti
點擊復(fù)制文檔內(nèi)容
環(huán)評公示相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1