freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

注塑模具venting(文件)

2025-08-19 16:51 上一頁面

下一頁面
 

【正文】 in moulding will crush it otherwise ? insert must be sparked on both sides, machining it will close the gaps between the particles ? needs to be low cost and easily replaceable, it will get blocked Efficient Venting Page 8 Priority venting, guiding principles: ? vent land must be as short as possible ? vent land must be as wide as possible ? split line venting must cover at least the last 1/2 of fill, more is better ? relief channels must exit to atmosphere without restriction ? moving cores/ejector pins must be vented ? fixed cores/inserts should also be vented ? known gas trap areas need extra venting. Additional ejector pins solely there for venting should be considered Efficient Venting Page 9 Typical split line relief channel positions: gate Continue to atmosphere Vent land length 2mm for hardened steel 5mm everything else . for endgated oblong Efficient Venting Page 10 Typical split line relief channel positions: . for centre gated disc Continue to atmosphere, 2 or more places Vent land length 2mm for hardened steel 5mm everything else Efficient Venting Page 11 Typical split line relief channel positions: . for oblong with cutouts gate Continue to atmosphere Vent land length 2mm for hardened steel 5mm everything else Continue to atmosphere . drill back to ejector box Efficient Venting Page 12 Typical relief channel positioning Efficient Venting Page 13 Typical relief channel positioning Efficient Venting Page 14 Typical split line vent crosssection: Vent land length 2mm for hardened steel 5mm everything else core Split line Relief channel depth, cavity Relief channel shape and width dependant on total shutoff land available. Must taper up towards split line to maintain steel strength and not be d
點擊復(fù)制文檔內(nèi)容
環(huán)評公示相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1