freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

abb傳感器pfea111-112中英文手冊(文件)

2025-07-17 10:18 上一頁面

下一頁面
 

【正文】 ↑or↓ Confirm with √ 目錄里↑或↓選擇響應時間 (15,75,250, or 750 ms) 按√確定11. CurrentOut Select Yes and press √ to set up the current output. Confirm with √ 輸出電流 選擇Yes并且按下√到產(chǎn)生電流輸出,按√確定12. SetTensionAt20mA Enter the tension value corresponding to 20mA調(diào)整張力電流10V 鍵入與壓力數(shù)值相應的 10mA 按下√確定13. SetpresponseTime Select the step response time (15,75,250, or 750 ms) from the list with (同10) ↑or↓ Confirm with √14. Finished PressOk Press √ to finish the fast setup and go to the operator menu. 完成 按OK 按下√完成快速設置返回操作菜單 Performing Fast Setup using Wrap Gain (用Wrap Gain實現(xiàn)快速設置)(,其少數(shù)差別如下:)3 SetWrapGain Select WrapGain from the list with↑or↓Confirm with√ 設置包角增益 選擇WrapGain(包角增益)按下√確定7. EnterWrapGain Enter the calculated wrap gain. For calculating wrap gain, see Appendix 鍵入包角增益(值) (B,C,D or E) for installed load cell type. Confirm with √ 鍵入計算好的包角增益。NOTE(注意)If you don’t know in which direction the force is acting,如果你忘記了那些指導強制動作Connect load cell A and B with the same force direction.連接壓頭A和B與強制指示一致To change the polarity of load cell A, invert X1:5 and 6 (In A+ and In A)改變壓頭A極性,顛倒X1:5和6To change the polarity of load cell B, invert X1:9 and 10(In B+ and In B)改變壓頭B極性,顛倒X1:9和102. After changing load cell polarity, check that the display reading is positive for increased web tension.在替換壓頭極性以后,檢查是否增強紙幅張力使顯示讀數(shù)為正。1. Push with your hand to apply a force corresponding to increased web tension on one load cell at a time (as close to the load cell as possible) and check if the display reading is positive. If the display reading is negative, invert the load cell signal connection to the tension electronics.每次在一個壓頭上,用你的手推動產(chǎn)生一個相當于增強幅面張力的強制力,檢查是否顯示讀數(shù)為正信號。Figure 31 Setting Wrap Gain with Hanging Weights (example of installation)圖31 懸掛砝碼設置增益(安裝范例)Follow the steps below to run a fast setup using hanging weights.跟隨下面步驟利用懸掛砝碼執(zhí)行快速設置1 Web Tension Press√ for 5 seconds to go to the FastSetUp menu.幅面張力 按下√5秒進入FastSetUp菜單2 Fast SetUp Press√ to start the fast setup sequence. 快速設置 按下√開始快速設置順序3 SetWrapGain Select HangingWeights from the list with↑and↓Confirm with√ 設置增益 選擇HangingWeights(懸掛砝碼)按下√確定4 CellsOnRoll Select the number of load cells that support the roll (1or2) from the list 軋輥單元 with ↑or↓ Confirm with √ ↑或↓選擇對于測壓元件支撐的軋輥號碼 按√確定。按裝置的提問輸入需要的數(shù)據(jù)。3. Check the supply voltage檢查供應電壓DINrail mounted IP20unit (unsealed)安裝在DIN導輥上的IP20unit (unsealed)Nominal 24VDC, Working range 1836VDC, X1:12額定值24VDC,工作范圍1836VDCWall mounted IP65unit (NEMA)在墻壁上安裝好的IP65unit (NEMA)85264V AC,(100V15% to 240V+10%), 4565HZ, X9:12 Nominal 24V DC, Working range 1836V DC, X124. Perform basic setting (if necessary)演示基本操作(如果需要的話)5. perform setup:演示調(diào)整Fast setup開始演示Complete setup結(jié)束演示6. Check load cell signal polarity檢查壓力傳感器信號極性7. Check load cell function檢查測壓元件程序 Performing Basic Settings 演示基本設置 When the tension electronics has been powered on for the first time after delivery, you are asked to SetLanguage and then to SetUnit. These two settings must be performed to be able to proceed with the rest of the setup. Language and unit can be changed later on if desired.在張 力測量裝置交付后第一次通電時,須設定語言和(計量)單位。If you have pressed√ so that the parameter is placed within brackets, you can cancel the entering mode by pressing . The selections you have done with ↑ and ↓ will not be stored. If is pressed the old value is displayed without brackets.如果你已經(jīng)按下√,參數(shù)放置在括號中,通過按下鍵你可以取消輸入模式;選擇你不想儲存的,如果按下舊的數(shù)據(jù)顯示就沒有括號。OK (acknowledgment) button. Confirms a selection or a parameter setting.確認按鍵,確定菜單選擇或參數(shù)設置。 Service tools (維修工具) Using the Panel Buttons (面板按鍵) Navigating and Confirming (操作確認)Display (顯示器) Button (按鍵)Steps back to previous menu. Sometimes you must press this button two or more times to get back to the desired menu.返回至上級菜單,有時你可以按這個按鍵2次或更多次來恢復你所需要的菜單。1. Load cell type and nominal load, see Appendix for installed load cell type壓力傳感器的類型和額定負載,參照相關附錄2. Object type, see Section (對象類型,)— Standard roll (two load cells) 標準輥(兩個壓力傳感器)— Single side measurement (one load cell) 單個邊測定 (壓力傳感器)3. Maximum web tension 最大限度的測量壓力4. Desired output data at given web tension 假定的壓力測量系統(tǒng)其輸出量的希望值數(shù)據(jù)5. Communication data, see Section 交往數(shù)據(jù)。Chapter 3 Commissioning (調(diào)試) About this Chapter(簡介) This chapter contains necessary information for missioning your web Tension System. It is assumed that the Web Tension System has been installed according to the instructions given in Chapter 2 Installation and Appendix (B, C, D or E) depending on installed load cell type。If PXUB 201 is mounted close to the terminal group, it is not necessary for the cable between the tension electronics and PXUB 201 to be screened.如果PXUB201隔離放大器緊貼端子排安裝,那么連接PXUB 201和張力測試裝置的電纜不必使用屏蔽。 Connecting the Load CellsInformation for connecting the load cells is given in the appendix for each load cell type, see table below.每種壓頭連接信息詳見以下表格 Type of load cell (測壓元件類型) Cable diagrams in Appendix (附錄中的接線圖) Connecting Optional Units (套管選擇) Insulation Amplifier PXUB 201 (only for the IP 20version) (隔離放大器)Insulation amplifier PXUB 201 is used when galvanic insulation between input and output, or between power supply and input/output, is required. See Section Insulation Amplifier PXUB201.當輸入和輸出或電源盒輸入輸出需要絕緣就需要使用隔離放大器。所有的電纜屏蔽必須接接地排且長度不可超過50毫米NOTE The cable screens must be earthed at one end only. 信號電纜和電源電纜需分別雙絞。 Earthing (接地) For trouble free operation, the earthing must be carried out carefully. Note the following: When choosing a place for installation, check that there will be space to open the enclosure lid fully. Also check that there is enough working space in front of the enclosure.
點擊復制文檔內(nèi)容
外語相關推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1