【正文】
c situation. Second chapter is shoulders the putation and the transformer choice, carries on the load putation according to the known transformer substation load material to the transformer substation. Through the load which obtains had determined the host changes the capacity and a number, the host change the pattern, the winding wiring way, the accent press the way and the host changes the impedance. Third chapter is the transformer substation electricity host wiring design, separately through to 10kV side electricity host wiring drawing up, chooses the stablest reliable wiring way. Fourth chapter is the short class putation, first determined shortcircuits the spot, calculates various parts reactance, then to respectively shortcircuits separately to carry on the putation, obtains respectively shortcircuits the shortcircuit current. Fifth chapter is the electrical equipment choice, the electrical equipment including the generatrix, the circuit breaker, the isolator, the electric current and the voltage transformer, the fuse. Sixth chapter is the power distribution equipment, mainly carries on the design to the transformer substation power distribution equipment. Seventh chapter is antiradar with the earth, this chapter has carried on the choice to the arrester, as well as has determined the earth way. Through to the 10kV transformer substation design, causes me has to the electrical engineering and its the automated specialized branch curriculum to be prehensive, system grasping, strengthened apply theory to reality the ability, raised the project consciousness, exercised me independently to analyze and the solution electric power project design question ability. [key words] substation ,load ,transmission system , distribution high voltage network ,correction equipment.變電站的綜合概述隨著經(jīng)濟(jì)的發(fā)展和現(xiàn)代工業(yè)建設(shè)的迅速崛起,供電系統(tǒng)的設(shè)計(jì)越來越全面、系統(tǒng),工廠用電量迅速增長,對電能質(zhì)量、技術(shù)經(jīng)濟(jì)狀況、供電的可靠性指標(biāo)也日益提高,因此對供電設(shè)計(jì)也有了更高、更完善的要求。所以輸送和分配電能是十分重要的一環(huán)。可能造成停電等事故,給生產(chǎn)生活帶來很大不利。升壓變電所一般建在發(fā)電廠,降壓變電所一般建立在靠近負(fù)荷中心的低點(diǎn)。變電所有升壓變電所和降壓變電所兩大類。變電所的主要設(shè)備有電力變壓器,母線和開關(guān)設(shè)備等。工業(yè)產(chǎn)品的效率提高也就意味著產(chǎn)品成本的降低,市場競爭力增大,進(jìn)而可以使企業(yè)效益提高,為國民經(jīng)濟(jì)的發(fā)展做出更大的貢獻(xiàn)。隨著計(jì)算機(jī)技術(shù)、現(xiàn)代通訊和網(wǎng)絡(luò)技術(shù)的發(fā)展,為目前變電站的監(jiān)視、控制、保護(hù)和計(jì)量裝置及系統(tǒng)分隔的狀態(tài)提供了優(yōu)化組合和系統(tǒng)集成的技術(shù)基礎(chǔ)。本變電所的初步設(shè)計(jì)包括了:(1)總體方案的確定(2)負(fù)荷分析(3)短路電流的計(jì)算(4)高低壓配電系統(tǒng)設(shè)計(jì)與系統(tǒng)接線方案選擇(5)繼電保護(hù)的選擇與整定(6)防雷與接地保護(hù)等內(nèi)容。首先根據(jù)任務(wù)書上所給系統(tǒng)與線路及所有負(fù)荷的參數(shù),分析負(fù)荷發(fā)展趨勢。本設(shè)計(jì)的第一章為緒論,主要闡述了變電站在電力系統(tǒng)中的地位。. 三章是變電站電氣主接線的設(shè)計(jì),分別通過對110kV、35kV、10kV側(cè)電氣主接線的擬定,選擇出最穩(wěn)定可靠的接線方式。通過對60kV變電站設(shè)計(jì),使我對電氣工程及其自動(dòng)化專業(yè)的主干課程有一個(gè)較為全面,系統(tǒng)的掌握,增強(qiáng)了理論聯(lián)系實(shí)際的能力,提高了工程意識,鍛煉了我獨(dú)立分析和解決電力工程設(shè)計(jì)問題的能力。第五章是電氣設(shè)備的選擇,電氣設(shè)備包括母線、斷路器、隔離開關(guān)、電流和電壓互感器、熔斷器。第二章是負(fù)荷計(jì)算及變壓器的選擇,根據(jù)已知變電站的負(fù)荷資料對變電站進(jìn)行負(fù)荷計(jì)算。本次畢業(yè)設(shè)計(jì)以10kV 變電站為主要設(shè)計(jì)對象,該10kV變電站是