【正文】
office. 現(xiàn)場排水系統(tǒng),沿施工道路兩側(cè)設(shè)置貫通明排水溝,排水溝為300300。用電線路主運(yùn)采用架空銅芯電線,各用電點(diǎn)采用二級(jí)三級(jí)配電箱送電。The mobilization of construction machinery and equipment to site and demobilization of equipment off site shall be rationally organized according to different construction stages. ,做到場內(nèi)材料堆放整齊、有序。Cooperate with all specialist subcontractors to make a good arrangement and control on the construction plan layout. 第七章 施工總進(jìn)度控制計(jì)劃及工期保證措施Chapter Seven: Control Plan of General Construction Progress and Construction Period Assurance Measures Principle to Control Construction Period在確保工程質(zhì)量,工程使用功能和安全生產(chǎn)的前提下,在目標(biāo)工期內(nèi)完成本工程施工任務(wù)并交付業(yè)主投產(chǎn)使用。Establish the system to hold the Production Routine Meeting. 23 engineering routine meetings to be held every week, focusing on the construction progress, quality of work and production safety. 4.實(shí)行合理的工期、目標(biāo)獎(jiǎng)罰制度,根據(jù)工作需要,工人的工作日為從星期一到星期天作業(yè),不休息(包括節(jié)假日)。The prehensive management on construction to be strengthened, particular in the construction management plan, technology, quality, safety, material and equipment allocation and distribution, the optimized management is required for them.加大工程投入,調(diào)配充足的施工人員,施工機(jī)械及工程材料以滿足工程需要。In special construction stage, 24 hours continuous work will be executed and threeshift work system to be carried out. 第八章 主要分項(xiàng)工程施工方法及技術(shù)措施Chapter Eight Construction Method and Technical Measures of Main Subdivisional Works 施工測量 Construction Survey Provision of Survey Instruments主要配置一臺(tái)全站儀,一臺(tái)J2經(jīng)緯儀及一臺(tái)高精度水準(zhǔn)儀和50米鋼尺等測量儀器設(shè)備,所有儀器經(jīng)檢校合格后方可施工,儀器由專人保管維護(hù)。While executing the foundation works, the level meter and staff gauge to be used for measuring and controlling the elevation. While executing the superstructure works, the steel tape is used for establishing elevation control point at staircase and corner column.所有預(yù)埋件及預(yù)埋螺栓固定時(shí)均高精度水準(zhǔn)儀測定其標(biāo)高。While executing the excavation of foundation pit, the general direction shall follow starting from the south to the north. 1m3 excavator to be used. The isolated foundation is excavated independently, while the cap foundation connected with base beam and strip foundation shall adopt the strip typed excavation method. While excavating the cap foundation, 500mm working surface should be maintained at perimeter of foundation. Due to bad soil quality, the foundation sloping is required to make 1:. Around the foundation pit, 200200 ditches to be built and 400400400 water collection well is required and the submerged pump is place inside the well. While the excavator is working, special person is required for direction of operation, it is prohibited to make the excavator collide with the pile body. The pile body should be protected well from damage or rupture. When excavating up to 200mm away the design level of pit bottom, manual excavation method is adopted, excess excavation is forbidden. 2)~ Excavation of Deep Foundation 4m深的基礎(chǔ)主要出現(xiàn)在100區(qū)域內(nèi),而5m深的基礎(chǔ)主要出現(xiàn)在100區(qū)域、400區(qū)域、500區(qū)域、600區(qū)域、800區(qū)域。4m deep foundations mainly exist in area 100. While 5m deep foundations mainly exist in area 100, 400, 500, 600 and 800. Due to deeper buried foundation, one excavator to be used for basin typed excavation. The side slope is laid to double stage sloping. The upper and lower stage sloping are all laid to 1:2. The foundation slope is protected with 30mm mortar and steel mesh. The open ditch is established around the bottom of foundation pit, the blind ditch is set up in the middle of foundation pit and catch pits are built at four corners of foundation pit. The water collected in the catch pits to be pumped out by submerged pump to ensure the water smoothly flowing through open ditch and a dry foundation pit. When excavating up to 200mm away the design level of pit bottom, manual excavation method is adopted. While the excavator is working, special person is required for direction of operati。挖土過程中沿坑底四周設(shè)置排水明溝,在基坑中央設(shè)置排水盲溝,基坑四角設(shè)置集水井,井內(nèi)積水采用潛水泵隨時(shí)抽凈,以此確??拥酌髋潘畷惩?,坑底干燥。In area 100 to 900, the foundation depth is .1)1. 0m~Excavation for shallow foundation 基坑挖土?xí)r總的流程為由南向北進(jìn)行挖土,采用1m3挖機(jī)進(jìn)行挖土,獨(dú)立基礎(chǔ)單個(gè)開挖,承臺(tái)基礎(chǔ)并有基礎(chǔ)梁相連的以及條形基礎(chǔ)則采用條型開挖的方式,各承臺(tái)基礎(chǔ)基坑挖土?xí)r周邊留500mm工作面,由于土質(zhì)較差,基坑放坡坡度為1:,在基坑四周挖200200的排水溝,并挖設(shè)400400400集水井,內(nèi)放置潛水泵。Based on the coordinate provided by the Owner, establish the axis control grid net as the basis of survey and verification. The control point of axis grid net should be established at 10m away the building’s axis and protected for ensuring its stability. While setting out, the laser survey meter to be used for measuring the angel and distance. For other axis measurement, J2 transit and 50m steel tape are to be used. Elevation Survey以業(yè)主提供的現(xiàn)場絕對(duì)高程控制點(diǎn)為基礎(chǔ),在變形比較穩(wěn)定的區(qū)域建立三個(gè)高程控制點(diǎn)并作良好保護(hù)。Keep a close contact with all specialist subcontractors, solve the issues in technology, work procedure and coordination.編制工程進(jìn)度月計(jì)劃、周計(jì)劃以控制階段工期的如期完成。Preparation work and construction cooperation should be made well. The construction preparation plan to be worked out to ensure the high quality and high efficiency logistic work. Technical Assurance Measures優(yōu)化施工組織設(shè)計(jì)并組織實(shí)施以利工程能在優(yōu)質(zhì)、安全的前提下能如期完成。The capable and high efficiency project management department will be organized to ensure the immediate execution of instructions from the Owner.2.項(xiàng)目經(jīng)理部實(shí)施項(xiàng)目法施工,對(duì)本工程行使計(jì)劃、組織、指揮、協(xié)調(diào)、控制監(jiān)督六項(xiàng)基本職能,并在我單位內(nèi)選擇成建制的、能打硬杖的、并有施工過同類型工程的施工隊(duì)伍組成作業(yè)層,擔(dān)任本工程的施工任務(wù)。All construction personnel should provided with accesspermit cards, In normal condition, nonconstruction workers are not allowed to enter the construction area.、衛(wèi)生保持清潔,安全設(shè)施到位及配置合理的消防設(shè)施,并加強(qiáng)有效管理。According to the drawing, each 10KW searchlight will be erected at southwest side and northwest side as the overall site lighting system. At each construction area, the lighting system will adopt iodine lamps (1KW). 220v lamps to be used in construction administrative area. The safety work to be ensured for lighting system. Special person to be assigned for regular check of lighting system. Fencing施工區(qū)域和施工人員辦公區(qū)域的圍墻采用鋼絲網(wǎng)圍墻。For the site drainage water system, the open