freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

上海某乙烯裂解裝置工程安裝施工組織設(shè)計-wenkub

2023-07-10 02:51:04 本頁面
 

【正文】 he construction to be organized strictly according to our mitments made in the tendering documents, to ensure pletion of the works with high quality, safety, high speed and low cost. Specification and Code本工程遵循國家或地方版發(fā)的施工規(guī)范及規(guī)程The following state or local construction specification, code and regulation to be followed for this project:地基與基礎(chǔ)工程施工及驗收規(guī)范(GBJ20283)“Code of acceptance and construction of foundation and ground works” (GBJ20283)混凝土結(jié)構(gòu)工程施工及驗收規(guī)范(GB5020492)“Code of acceptance and construction of concrete structural works” (GB5020492)砌體工程施工及驗收規(guī)范(GB5020398)“Code of acceptance and construction of masonry works” (GB5020398)地面及樓地面工程操作規(guī)范(YSJ40789)Operation Code of Ground and Floor Ground Engineering (YSJ40789)建筑地面規(guī)程施工驗收規(guī)范(GB5020995)“Code of acceptance and construction of architecture ground regulation” (GB5020995)門窗安裝工程操作規(guī)程(YSJ40889)Operation regulation of doors and windows installation works (YSJ40889)屋面工程施工操作規(guī)程(YSJ41089)“Operation Regulation of construction of roof works” (YSJ41089)屋面工程技術(shù)規(guī)范(GB5020794)“Technical Code of roof works” (GB5020794)建筑裝飾工程施工及驗收規(guī)范(JGJ7391)“Code of Construction and Acceptance of Architectural Decoration Works” (JGJ7391)建筑裝飾工程操作規(guī)程(YSJ40989)Operation Regulation of Architectural Decoration Works (YSJ40989)建筑內(nèi)部裝修設(shè)計防火規(guī)范(GBJ5022295)Code of Fire Protection of Architectural Internal Decoration Design (GBJ5022295)建筑工地施工現(xiàn)場供用電安全技術(shù)規(guī)程(JGJ4688)Safety and Technical Regulation of Power Supply Usage on Construction Site (JGJ4688)第二章 工程概況Chapter Two: General Situation General Situation of the Project本工程地處上海某化工園區(qū)內(nèi),由上海某石化有限公司投資興建的上海乙烯裂解裝置工程。 。 。上海某乙烯裂解裝置工程安裝施工組織設(shè)計第一章 編制說明Chapter One: Description to Tender Principle to Tender本施工組織設(shè)計是本工程的投標(biāo)文件之一,主要從宏觀上闡明本工程施工組織管理模式和方法,一旦中標(biāo),它將作為本工程組織施工管理的指導(dǎo)性文件,在此基礎(chǔ)上,再編制詳盡的施工方案。The drawings and geological exploration report supplied by the Owner。The construction experience and construction method for similar projects undertook by our enterprise。This project is located in Shanghai Caojing Chemical Industrial Zone, invested and constructed by Shanghai SECCO Petrochemicals Co., Ltd. 工程名稱:上海乙烯裂解裝置工程Name of Project: Shanghai Ethylene Cracker Complex Project工程地點: 上海某化工園區(qū)內(nèi)Location: Shanghai Caojing Chemical Industrial Zone建設(shè)單位: 上海某石化有限公司Owner: Shanghai SECCO Petrochemicals Co., Ltd.設(shè)計單位:ABB盧瑪司全球設(shè)計事務(wù)所Design Institute: ABB Luma Global Co.地質(zhì)勘察單位:某工程公司勘察設(shè)計院Geological Exploration Unit: SINOPEC Shanghai Jinshan Engineering Co. Survey Design Institute Design Situation Architectural Design1變電站50m27m,;29m,;3變電站29m。The floor ground is designed as the one with antislip ground tiles and wearproof concrete floor. 外墻設(shè)計裝飾做法:外墻涂料、水泥砂漿打底粉光。The ceiling is designed as the painted one and the gypsum board ceiling. 門窗設(shè)計:主要有鋼質(zhì)防火門、鋁合金窗及百葉窗。The foundation is designed as the one with pile cap, the pile foundation uses concrete precast piles. The foundation has isolated foundation, strip foundation, platform foundation and equipment foundation, the concrete grade is C30. 變電站上部結(jié)構(gòu)設(shè)計狀況:框架結(jié)構(gòu),墻體為200厚空心砌塊。Due to the project invested by the foreign pany and chemical plex installation, the construction has to be executed and managed strictly according to the Owner’s management patterns. Construction Conditions Site Conditions現(xiàn)場沉樁施工正在進行,為以后土建單位進駐現(xiàn)場準(zhǔn)備了條件。Only the detail and accurate construction drawings are handed over to the Construction Company in advance, shall the construction condition be met. In order to achieve such goal, it requires the good cooperation among the Owner, design institute, equipment supplier and every specialist pany, to solve the technical issues existed in the drawings, to ensure smooth execution of the works. ,施工配合工作是保證工作順利竣工的前提保證。To ensure total construction period to meet 595 calendar days.施工周期2003年1月15日2004年8月31日。項目經(jīng)理全權(quán)代理公司履行工程承包合同,對工程進行全面管理。Rebar Works: The Electroslag welding to be adopted for the connection of vertical thick rebars。 20mm thick of plywood mainly for columns and beam boards。因此總的施工流程為由西到東,3區(qū)域為一個施工段,6區(qū)域為一個施工段,9區(qū)域為一個施工段。具體主要施工機械設(shè)備詳見附表。對勞動力資源提前配置、合理流動,對勞務(wù)人員作動態(tài)管理,確保勞動力組織滿足施工的技術(shù)、安全要求和進度要求。After the construction personnel entering the site, the project management department shall organize the engineering staff in all levels to hold the technical and safety explanation meeting on all site situation. Particular attention should be given for fire fighting education. The corresponding regulations should be worked out and urge the workers and relevant people to observe and implement it. Technical Preparations,以便各施工單位或設(shè)備供應(yīng)商可提前進行技術(shù)上的前期協(xié)調(diào)工作。Joint review on drawings. 綜合進度計劃的編制并提交予業(yè)主及分包施工單位和設(shè)備供應(yīng)商予以確認。After the contract is awarded to us, we shall immediately set about preparing the materials for the works. Make material request plan, conduct market investigation and confirmation on the material suppliers. Select the material supplier with sound reputation, high quality products and good service, then sign the procurement contract with the supplier, organize to deliver the materials to site according the demands of construction. ,將積極配合本項目的物資采購供應(yīng)共因工作,確保工程物資滿足施工的需要。根據(jù)業(yè)主關(guān)于現(xiàn)場不允許搭設(shè)宿舍區(qū)和廚房的要求,我方將在化工區(qū)外另外租借房屋作為管理人員和工人住宿和飲食之用。The general plan layout shall follow the principle of economic and reasonable structure, satisfying construction requirements, conforming to local, municipal and environmental requirements, to build a sound production and working environment. Meanwhile the plan layout should also consider the equipment installation and other specialty construction. Machinery and Equipment Arrangement其余鋼筋、木工、砼機械在建筑物西側(cè)面沿施工道路布置。The Owner provideΦ50 pipes for connecting the pipe net. WhileΦ25 galvanized pipes to be buried 500mm underground for the construction water supply pipe net. Its travel route should be planed along sides of road. Water taps will be erected for site curing spot, mortar mixing machine and administrative staff
點擊復(fù)制文檔內(nèi)容
環(huán)評公示相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號-1