【正文】
ditions and geological conditions on the line and station lines are related to the choice of the span, pillar layout and type selection and the anchor length of the division, Then in accordance with the relevant requirements of the design manual column in the table on the side of the gauge, pillar type, geology, such as installation of the corresponding figure number expressed. Highspeed catenary and the normalspeed catenary design or construction, have a lot of difference. Therefore, the technology which this design used does not make use of by the normalspeed catenary the same time, pay attention to all aspects of design considerations to enable the design of technical, economic, and aesthetic aspects of basic requirements to meet. In addition, late in the design, the paper touches the characteristics of catenary, discussed the mayor differences between the highspeed catenary and the normalspeed catenary, explained the key technology of the highspeed railway catenary construction to provide necessary reference and guidance. Key words Highspeed railway; Catenary; Plane design; CAD 西南交通大學(xué)本科畢業(yè)設(shè)計(論文) 第 VI 頁 目 錄 摘 要 .................................................................................................................................. IV 目 錄 .................................................................................................................... VI 第 1 章 緒 論 .......................................................................................................................... 1 高速接觸網(wǎng)的特點及要求 ...................................................................................... 1 高速接觸網(wǎng)的技術(shù)特征 .......................................................................................... 2 高速接觸網(wǎng)與普速接觸網(wǎng)的主要差異 .................................................................. 3 第 2 章 接觸網(wǎng)平面設(shè)計的相關(guān)計算 .................................................................................. 5 原始資料 .................................................................................................................. 5 接觸網(wǎng)負載計算 ...................................................................................................... 5 線索資料 ........................................................................................................ 5 其他相關(guān)資料 ................................................................................................ 6 負載計算 ........................................................................................................ 6 最大跨距計算 .......................................................................................................... 9 墜砣高度安裝曲線 ................................................................................................ 11 全補償鏈型懸掛錨段長度及張力增量曲線決定 ................................................. 14 正線全補償鏈形懸掛錨段長度及張力增量曲線 ....................................... 15 站線全補償鏈形懸掛錨段長度及張力增量曲線 ....................................... 20 吊弦長度計算 ........................................................................................................ 28 基本條件分析 .............................................................................................. 28 參數(shù)說明 ....................................................................................................... 28 支柱容量計算 ......................................................................................................... 30 中間柱容量計算及校驗 ............................................................................... 30 轉(zhuǎn)換柱容量計算 ........................................................................................... 32 下錨柱容量計算 ........................................................................................... 34 道岔柱容量計算 ........................................................................................... 35 風(fēng)偏值的校驗 ........................................................................................................ 37 曲線段風(fēng)偏值校驗 ....................................................................................... 37 直線區(qū)段風(fēng)偏值校驗 ................................................................................... 38 第 3 章 常州接觸網(wǎng)站場平面設(shè)計 .................................................................................... 39 站場接觸網(wǎng)平面設(shè)計程序 .................................................................................... 39 硬橫跨的選擇 ........................................................................................................ 40 硬橫跨結(jié)構(gòu)型式及組成 ........................................................................................ 40 線索選取 ................................................................................................................ 41 單線支柱選用 ........................................................................................................ 42 錨段的劃分 ............................................................................................................ 43 錨段關(guān)節(jié) ................................................................................................................ 44 五跨絕緣錨段關(guān)節(jié) ...................................................................................... 45 四跨非絕緣錨段關(guān)節(jié) .................................................................................. 45 咽喉區(qū)放大圖 ......................................................................................................... 46 線岔選用 ................................................................................................................ 47 側(cè)面限界的選用 .................................................................................................. 49 西南交通大學(xué)本科畢業(yè)設(shè)計(論文) 第 VII 頁 安裝圖號 ............................................................................................................... 49 下錨柱安裝參考圖號 ................................................................................ 50 道岔柱安裝參考圖號 ...................