freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

ppap-delphi-wenkub

2023-04-01 00:35:04 本頁(yè)面
 

【正文】 PPAP) ? Production parts are manufactured at the production site using production tooling, gaging, equipment, operators, etc ? Parts from production run are analyzed ? Test results and records from APQP are submitted with Part Submission Warrant 20Sep99 2 Task 15: PPAP Purpose For the supplier to demonstrate –all design records and specification requirements are properly understood –the process has the capability to produce product that meets requirements 20Sep99 3 Task 15: PPAP Something Changed Application AIAG PPAP manual defines when PPAP submission is required – New part – Correction to discrepancy in previous submission – Design or process change – Change in source of subcontracted materials or services – transfer or rearrangement of tooling equipment 20Sep99 4 Task 15: PPAPMethodology ? Buyer enters PPAP submission date on purchase order ? Approver determines submission level – default level 3 – default level 4 for raw material ? Supplier submits PPAP – electronic submission remended ? Approver evaluates PPAP package – Level 5 at supplier site ? Approver determine part submission status ? Notify supplier and manufacturing of status 20Sep99 5 Task 15: PPAP ? DFMEA ? Control Plan ? Early Production Containment Plan (PreLaunch Control Plan) ? Process capability studies ? Gage Measurement System Analysis ? Lab Accreditation scope ? Restricted Reportable Materials form ? Interim
點(diǎn)擊復(fù)制文檔內(nèi)容
教學(xué)課件相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖片鄂ICP備17016276號(hào)-1