【正文】
ation and dam stability against sliding surface meets the requirements of strength. The spillway dam mainly takes a main part in the process of identifying the top elevation weir, the size of the dam and the weir curve, reaffirming the leaking stream capability. It also makes a solution about how to get rid of the energy dissipation、。擋水建筑物最大壩高不超過50m,電站裝機容量不超過25MW。臨時性建筑物為5級。廠房校核洪水標(biāo)準(zhǔn):100年一遇洪水。該重力壩由10個壩段組成,每個壩段的長度大約為15m,從左岸到右岸依次是1~3號壩段為左擋水壩段,4號為電站壩段,5號為擋水壩段,6~7號為泄洪壩段,8~10號為右岸擋水壩段。溢流壩段:該壩段全長36m,分2個壩段,每段長約18m,共分5孔。下面將介紹各個部分的設(shè)計過程?!踩?。所以,壩高為:。經(jīng)計算,溢流孔凈寬為20m,共分5孔,每孔4m。堰頂上游面曲線采用的是三圓弧曲線,堰頂下游面曲線采用的是WES曲線。護坦上不設(shè)其他輔助消能工。具體步驟如下: 荷載計算。選用抗滑穩(wěn)定極限狀態(tài)法。結(jié)論:經(jīng)過計算,兩種工況下壩基面的穩(wěn)定均滿足要求。剪應(yīng)力τu=(pupuuσyu)n (6) d=(σyd + pudpd)m (7)水平正應(yīng)力σxu =( pupuu)τun (8) σxd =( pdpud)+τdm (9)主應(yīng)力σ1u =(1+ n2)σyu –n2(pupuu) (10) σ2u= pupuu (11) σ1d =(1+ m2)σyd m2(pdpud) (12)σ2d = pdpud (13) σmax=(σ1 、σ2 )=(σx+σy)/2177。 壩基排水 壩基的排水幕布置在防滲帷幕的下游,向下游傾斜,與灌漿帷幕的夾角為,孔距取為3,孔徑為140,孔深為1015,沿壩軸線的方向設(shè)置一排。㈢、牛腿的設(shè)計 ,牛腿與柱的寬同寬,高假定為h=,按下式進行驗算:≤ (19)——由荷載標(biāo)準(zhǔn)值按荷載效應(yīng)短期組合計算的作用于牛腿頂