oncrete requirement: 混凝土標(biāo)號(hào)為 C30。 2 cm; 含氣量在 177。 混凝土泵車(chē)的運(yùn)輸時(shí)間不應(yīng)超過(guò) 40 分鐘,攪拌車(chē)之間的時(shí)間間距不應(yīng)超過(guò) 10 分鐘; Transport time of concrete pumping truck should not exceed 40 minutes。 其他為注明事宜,根據(jù)乙方的配比; Others undertake according to party B’s concrete mix design. b. 鋪筑前擬定計(jì)劃,并審核; Make a scheme and certificate before concrete cast 混凝土鋪筑是影響混凝土品質(zhì)的主要環(huán)節(jié),因此必須事先擬定好計(jì)劃,并得到項(xiàng)目監(jiān)理的認(rèn)可; Concrete casting is the most important part through the entire construction process which can influence the quality of concrete directly, so a scheme must be wellprepared in advance and certificate by project monitor. 擬定混凝土鋪筑計(jì)劃時(shí)需考慮的事宜: Matters below must be taken into account when a concrete casting scheme is drafted: * 現(xiàn)場(chǎng)混凝土輸送通道及 設(shè)備進(jìn)出的通道。 Concrete casting direction should be one in principle (usually start from the left, and move to the right direction, and repeat it when one strip is finished). 夏天鋪筑時(shí)避免發(fā)生施工縫,為了防止發(fā)生冷縫,與商混公司協(xié)商,避免水泥泵車(chē)延遲的情況發(fā)生。在要求超平工業(yè)地坪的今天,激光整平機(jī)尤為 重要。進(jìn)行打磨時(shí),注意避免過(guò)度打磨,直到水滯不見(jiàn)為止。 It include two FNumbers: FF for flatness and FL for levelness. 平整度 FF:以 30cm 為間距,測(cè)出的地坪凹凸變化的合計(jì)。 In the project Macquarie Goodman (Shanghai) Warehousing Co., Ltd. Newlybuilt Plant Phase I and II (built area 58,000m2, contract price million, singlelevel steelwork) a flat steel fiber floor is required and acplished with laserguided screeding machine and doubledisc polisher. The finished floor is inspected and approved by a professional testing pany and is in line with the ER (. 3m and 3mm, FF50 and FL30 standards). 工程實(shí)例照片: Sample Pictures 激光整平機(jī)整平地坪砼 Laser Screeding Machine in Operation 地坪平整度檢測(cè) Floor Flatness Testing 鋼纖維地坪成品 Finished Steel Fiber Floor 。 Levelness FL: variations tested over t