【正文】
whole process of the technical, economic and organizational prehensive construction projects’ document. The design of construction projects subject to construction design B. The design is based on construction drawings to calculate the amount of engineering construction projects, and works according to the amount calculated to determine the labor required to plete the process and the number of working days, in turn, draw a bar chart of the general construction, work diagrams, and plane construction site general arrangement, but the design also includes the calculated amount of the project works to determine the amount of primary material plan, the main unit of the amount of machinery and equipment and labor required of the plan, part of the preparation of a major subproject of the construction methods and program. Finally, according to the above aspects of the preparation of the construction, then work out the design documents. With the graduation project, the University has reviewed and deepen the knowledge, and it is can help improve our professional knowledge. Key words: construction organization, construction plan, construction schedule control, project management 1 施工組織設(shè)計(jì) 編制依據(jù) 《 建設(shè)項(xiàng)目乙 施工組織設(shè)計(jì)》的 建筑、結(jié)構(gòu)等 施工圖紙 。 本設(shè)計(jì)課題為建設(shè)項(xiàng)目乙施工組織設(shè)計(jì)。 本 設(shè)計(jì) 是 根據(jù)施工圖紙 來 計(jì)算 施工項(xiàng)目 的 工程量 , 并且 根據(jù)所 計(jì)算出的 工程量來確定完成各工 序所需勞動(dòng)力和工作天數(shù), 進(jìn)而, 繪制 出施工 總 進(jìn)度 橫道 圖 、 網(wǎng)絡(luò)圖以及施工現(xiàn)場(chǎng)平面 總 布置圖, 而且,本設(shè)計(jì)還包括以所計(jì)算出的項(xiàng)目工程量來確定的主要材料用量計(jì)劃、主要機(jī)械設(shè)備用量機(jī)化和勞動(dòng)力需用了計(jì)劃,編寫了主要分部分項(xiàng)工程的施工方法和方案。 本 建筑 工程的施工 合同文件 及工程其他說明 。 2020 國(guó)家定額及《混凝土結(jié)構(gòu)施工圖平面整體表示法之徒規(guī)則和構(gòu)造圖集》等標(biāo)準(zhǔn)圖集 [1]。 室內(nèi)外裝修的構(gòu)造及做法:外 墻貼橙紅色面磚, 內(nèi)墻、地面、頂棚均只做抹灰處理,內(nèi)門只做水泥沙漿門套抹灰,樓梯做混凝土水磨石和防滑條踏步處理,其他臺(tái)階均為水磨石臺(tái)階,扶手黑色亞光漆護(hù)攔 ?;A(chǔ)承臺(tái)底標(biāo)高分別為 ,樁頂標(biāo)高為 。 板、梁、柱均為現(xiàn)澆鋼筋混凝土,其混凝土強(qiáng)度等級(jí)為 C20。 項(xiàng)目施工管理組織體系由兩部分組成:一部分是由項(xiàng)目經(jīng)理為領(lǐng)導(dǎo)核心的公司直屬項(xiàng)目經(jīng)理部,作為施工現(xiàn)場(chǎng)施工管理組織機(jī)構(gòu),負(fù)責(zé)項(xiàng)目現(xiàn)場(chǎng)施工管理。另外一部分是施工單位總部領(lǐng)導(dǎo)的各管理部門,負(fù)責(zé)協(xié)調(diào)各項(xiàng)施工 資源的配置,負(fù)責(zé)對(duì)項(xiàng)目管理機(jī)構(gòu)的質(zhì)量體系運(yùn)行進(jìn)行監(jiān)控和考核。組織項(xiàng)目部全體人員認(rèn)真落實(shí)質(zhì)量體系文件中的各項(xiàng)措施要求,組 織均衡生產(chǎn)、文明施工、安全管理等。 參與編制項(xiàng)目施工組織設(shè)計(jì),編制分部分項(xiàng)施工方案,進(jìn)行分部工程和新技術(shù)、新材料的技術(shù)交底。 對(duì)項(xiàng)目上出現(xiàn)的各種違章操作有權(quán)處置,對(duì)已造成問題的有權(quán)提出整改和返工指令。 對(duì)違反國(guó)家標(biāo)準(zhǔn)及施工規(guī)范要求的情況有權(quán)責(zé)令整修、返工乃至停工。 協(xié)助經(jīng)營(yíng)管理科對(duì)勞務(wù)、工程分承包方進(jìn)行考察、評(píng)價(jià)。 定期舉行安全生產(chǎn)教育,參與編制安全技術(shù)交底工作并督促實(shí)施,嚴(yán)格行使處罰權(quán)。 材料員 及時(shí)收集分供方的有關(guān)資料,并參加對(duì)分供方的考察、評(píng)價(jià)。 5 圖 21 項(xiàng)目部組織 結(jié) 構(gòu)圖 施工準(zhǔn)備 施工技術(shù)準(zhǔn)備 熟悉及會(huì)審圖紙 熟悉和審查施工圖紙,掌握擬建工程的建筑和結(jié)構(gòu)的形式和特點(diǎn),建筑設(shè)備及加工訂貨有何特殊要求等,以便及時(shí)會(huì)同業(yè)主及設(shè)計(jì)單位進(jìn)行圖紙交底、會(huì)審。 施工現(xiàn)場(chǎng)準(zhǔn)備 建造臨時(shí)設(shè)施,按照施工平面圖和臨時(shí)設(shè)施需要用量計(jì)劃,建造各項(xiàng)臨時(shí)設(shè)施,為正式開工準(zhǔn)備好用房。主體梁、柱等 混凝土 保養(yǎng)每層采用塑料水管接通水籠頭 ,及時(shí)保養(yǎng)現(xiàn)澆 混凝土 。 生產(chǎn)準(zhǔn)備 建筑材料及安全防護(hù)用品準(zhǔn)備:對(duì)水泥、鋼材、木材三大建筑材料,特殊材料等,均應(yīng)根據(jù)實(shí)際情況做好計(jì)劃,分批進(jìn)場(chǎng),編制各項(xiàng)材料計(jì)劃表,對(duì)各種 材料的入庫,保管和出庫制訂完善的管理辦法,同時(shí)加強(qiáng)防盜、防火的管理。 施工測(cè)量 制定測(cè)量方案的基本原則 以業(yè)主提交的測(cè)量控制點(diǎn)為依據(jù)建立適合本工程的測(cè)量體系,保證建筑物定位準(zhǔn)確,保證軸線、標(biāo)高正確。 177。儀器采用 DS2精密水準(zhǔn)儀,精度按二 等水準(zhǔn)技術(shù)指標(biāo)執(zhí)行。如果遇到異常情況或與地質(zhì)勘查報(bào)告不符時(shí),應(yīng)與建設(shè)單位、設(shè)計(jì)院商定處理方案?;A(chǔ)施工完畢應(yīng)及時(shí)清理基坑,并用素土分層回填夯實(shí)至室內(nèi)設(shè)計(jì)標(biāo)高,同時(shí)邀請(qǐng)有關(guān)部門進(jìn)行基礎(chǔ)工程的驗(yàn)收,合格后在施工上部結(jié)構(gòu)。 模板設(shè)計(jì)應(yīng)按構(gòu)件配模,選擇最經(jīng)濟(jì)、最可行的方案模板及支撐設(shè)計(jì)時(shí)應(yīng)計(jì)算以下荷載:模板與支撐自重;新澆砼重量;鋼筋重量;施工人員及施工設(shè)備重量;振搗混凝土對(duì)模板的荷載;新澆混凝土對(duì)模板的側(cè)壓力。 滿堂腳手架搭設(shè)牢靠,鋼管無彎曲變形,扣件擰緊。 模板安裝 基礎(chǔ)模板 施工工藝:安裝前檢查→安裝基礎(chǔ)兩側(cè)模板→側(cè)模支撐→搭設(shè)鋼管吊架→安裝上部基礎(chǔ)模板并固定→檢查糾正 [4]。兩塊內(nèi)拼板寬度與柱截面相同,兩塊外拼板寬 度應(yīng)比截面寬度大兩個(gè)拼板厚度。 獨(dú)立柱采用竹膠合模板,模板按柱截面尺寸和長(zhǎng)度進(jìn)行配模。屋頂 WKL WKL8C 長(zhǎng)度均為 ,模板要起 拱 %。然后安裝梁側(cè)模版。一般梁側(cè)模版的上邊用樓板底模板頂緊。 梁側(cè)模應(yīng)壓梁底模。按設(shè)計(jì)要求,梁跨度大于 6m、板跨度大于 4m 時(shí),按跨度的 1/400 起拱,懸挑梁跨度大于 2m 時(shí)梁端按懸挑長(zhǎng)度的 1/300起拱。支撐架的木枋 應(yīng)在木工房?jī)?nèi)用電刨把上下兩個(gè)接觸面刨平,同時(shí)兩面要求水平,不得出現(xiàn)大頭小尾現(xiàn)象。另外考慮竹膠合板容易變,木枋間距控制在 250mm300mm。模板的安裝順序是先安裝上下休息平臺(tái)及梯梁的模板,然后再在樓板梁模板之間裝設(shè)樓 梯模板。樓梯側(cè)模板靠斜撐等固定在樓梯底模上,并保持垂直。 預(yù)埋件安裝及孔洞預(yù)留 本工程預(yù)埋件 為 欄桿扶手等預(yù)埋件。 模板拆除 側(cè)模:在砼強(qiáng)度能保證其表面及棱角不因拆除而破損時(shí)方可拆除。 鋼筋切斷采用機(jī)械切斷 ,要求截面平整、加工彎曲要求型狀和尺寸準(zhǔn)確。如有錯(cuò)漏,及時(shí)糾正增補(bǔ)。 柱筋綁扎 柱豎向鋼筋接頭采用電渣壓力焊焊接。 框架梁、懸臂梁的鋼筋,應(yīng)放在柱的豎向鋼筋內(nèi)側(cè)。 樓梯鋼筋綁扎:按圖事先配料加工,先綁扎梁筋后綁扎板筋。在施焊前對(duì)所要焊接鋼筋進(jìn)行試焊,并對(duì)焊件做抗拉和冷彎試驗(yàn)。轉(zhuǎn)化為電渣過程,焊接電流通過渣池產(chǎn)生電阻熱,使鋼筋端部繼續(xù)熔化,待熔化流量達(dá)到規(guī)定 數(shù)值(約 3040mm)后,切斷電源,用適當(dāng)壓力迅速頂壓使之?dāng)D出,熔化金屬形成堅(jiān)實(shí)接頭,冷卻 60180s 后方可卸掉夾具并敲掉熔渣。擠壓接 頭的壓痕道數(shù)應(yīng)符合型式檢驗(yàn)確定的道數(shù)。 樓層混凝土澆筑時(shí),施工連續(xù)不斷 。 在混凝土澆筑及靜置過程中應(yīng)采取措施防止產(chǎn)生裂縫。振搗時(shí),棒宜垂直振搗,插入深度宜為棒長(zhǎng) 3/4,作用軸線應(yīng)相互平等避免漏振。 梁、板混凝土澆筑 本工程梁板混凝土澆搗將采用泵送的方法,將混凝土輸送至澆搗部位。 梁柱節(jié)點(diǎn)鋼筋較密時(shí),澆筑此處混凝土?xí)r宜用小粒徑石子同強(qiáng)度等級(jí)的混凝土澆筑,并用小直徑振搗棒振搗。 樓梯混凝土澆筑 樓梯混凝土自下而上澆筑,先振實(shí)底板混凝土,達(dá)到踏步位置時(shí)再與踏步混凝土一起澆搗,不斷連續(xù)向上推進(jìn),并隨時(shí)用木抹子(或塑料抹子)將踏步 14 上表面抹平。 砌體施工工藝流程 選定合格砌塊→運(yùn)輸和堆存→放線→灑水濕潤(rùn)→砌筑→基底處理→必要部位掛網(wǎng)→分層抹灰→成品保護(hù)。水平灰縫要求不大于 15mm,垂直灰縫要求不大于 20mm。砌筑高度約 時(shí),宜停歇 24h 后再繼續(xù)砌筑,使砌塊陰干成型,以防收縮裂縫。 砌塊與門口連結(jié),若采用后塞口作法,洞口高度 以內(nèi)時(shí),每邊砌 3塊預(yù)埋木磚或預(yù)埋鐵件的混凝土塊;洞口高于 時(shí)砌 4 塊。門窗過梁可采用粘土燒結(jié)紅磚拱過梁或用鋼筋混凝土梁帶。將掛網(wǎng)展平,用射釘與梁柱或墻體連接,或與預(yù)埋的鋼筋點(diǎn)焊固定?;鶎犹幚硗戤吜⒓茨ǖ谆?,待底灰七八成干后抹面層灰。 質(zhì)量及安全措施 樓面堆放砌塊時(shí)不準(zhǔn)超量,禁止拋擲和撞擊樓板,堆放高度不得超過五皮。 大面積抹灰前,修補(bǔ)找平用的砂漿應(yīng)與抹灰所用材料一致。內(nèi)墻抹灰之后涂一層乳膠漆。再用水泥聚合物砂漿,噴灑或用毛刷(橫掃)將砂漿甩到基面上。 抹底灰:在頂板混凝 土濕潤(rùn)的情況下,先刷素水泥漿一道,隨刷隨打底,打底采用 1:1:6 水泥混合砂漿。涂抹時(shí)先分兩遍抹平,壓實(shí),其厚度不應(yīng)大于 2mm,待面層經(jīng)過鐵抹子抹面,灰漿表面不會(huì)變?yōu)楹隣顣r(shí)要及時(shí)壓光,不得有抹痕、氣泡、接縫不平等現(xiàn)象。 彈水平線:先彈頂棚邊或龍骨下標(biāo)高線,按飾面磚上口鑲貼伸入吊頂線內(nèi)25㎜計(jì)算,標(biāo)高線,從上往下分劃,使最下層面磚高度大于半塊磚。嵌縫、檫洗。 灑水濕潤(rùn):在施工前一天灑水濕潤(rùn)基層。 刷素水泥漿結(jié)合層:宜刷 1: ,也可在墊層或樓板基層上均勻?yàn)⑺?,再灑水泥面,?jīng)掃涂形成均勻的水泥粘結(jié)層,隨刷隨鋪水泥砂漿。 壓第三遍:水泥砂漿終凝前第三遍壓光。從屋面結(jié)構(gòu)層向上主要包括:找坡找平層、隔氣層、保溫層、找平層、卷材防水層、保護(hù)層或使用層面。 鋪貼卷材:卷材的層數(shù)、厚度應(yīng)符合設(shè)計(jì)要求。卷材鋪貼時(shí),將防水卷材剪成相應(yīng)尺寸,用原卷心卷好備用;鋪貼時(shí)隨放卷隨將卷材向前滾鋪、粘貼,搭接部位應(yīng)滿粘牢固,搭接寬度滿粘法為 80mm。 注意事項(xiàng) 屋面工程施工中應(yīng)做分項(xiàng)工程的交接驗(yàn)收,未經(jīng)檢查驗(yàn)收,不得進(jìn)行后續(xù)施工。 不允許穿帶釘子的鞋在上面施工、檢查、觀摩,避免將防水層釘穿。采用可鍛鑄鐵制的扣件。用兩個(gè)扣件與連墻桿連接。 腳手架的拆除 拆除前準(zhǔn)備工作:全面檢查腳手架的扣件連接、連墻桿、支撐系統(tǒng)等是否符合規(guī)范和施工方案要求。 拆除腳手架,周圍應(yīng)設(shè)圍欄或警戒標(biāo)志,并由專人看管,禁止無關(guān)人員入內(nèi)。 當(dāng)腳手架采取分段,分立面拆除時(shí),對(duì)不拆除的腳手架兩端,應(yīng)設(shè)置連墻桿和斜撐加固 。 井架安裝 安裝井架前,必須先按型鋼井架規(guī)格相應(yīng)的地基圖紙打好基礎(chǔ)。 第一節(jié)裝好后,往上升的每一節(jié)架都按照此安裝程序安裝,并將導(dǎo)軌 `隨節(jié)裝上,導(dǎo)軌與導(dǎo)軌的間距約為 35mm。 安裝卷揚(yáng)機(jī),并固定好。 提升鋼絲繩的尾端不得纏繞在有棱角的型鋼上,防止受力時(shí)割斷鋼絲繩。 架體最后一道附墻的以上部分為自由端,其高度應(yīng)視具體情況而定,但最大不能超過 6m。 行空載和額定載荷試驗(yàn),檢查整機(jī)變形情況。 按照“先地下后地上,先主體后圍護(hù),先結(jié)構(gòu)后裝修,先土建后水電”的原則指導(dǎo)施工。主導(dǎo)工序?yàn)榻壴摻睢е?、梁、板模板→綁扎梁、板鋼筋→澆柱、梁、板? 21 樓梯混凝土。室內(nèi)裝飾完工后開始外墻涂料,其中平行搭接門窗安裝、門油漆。 圖 41 基礎(chǔ)和 主體工程施工段劃分示意圖 建設(shè)項(xiàng)目工程量計(jì)算 工程量計(jì)算書詳見附錄 二 [6]。 5. 資源需用量計(jì)劃 主要材料需用量計(jì)劃 主要材料需用量計(jì)劃 見表 51。 主要機(jī)械計(jì)劃 表 表 52 序號(hào) 機(jī)具名稱 規(guī)格型號(hào) 單位 數(shù)量 1 井架 * 臺(tái) 1 2 自卸汽車 QD351 輛 1 3 砂漿攪拌機(jī) BJ200 臺(tái) 1 23 4 插入式振搗機(jī) HZ6X50 臺(tái) 2 5 平板式振動(dòng)機(jī) PZ24 臺(tái) 1 6 鋼筋切斷機(jī) G