freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

jgj94-94建筑樁基技術規(guī)范英文版(已修改)

2024-12-03 16:14 本頁面
 

【正文】 Industrial Standard of the People’s Republic of China 建筑樁基技術規(guī)范 Technical Code for Building Pile Foundations JGJ 94 94 1994 Beijing I Industrial Standard of the People’s Republic of China 建筑樁基技術規(guī)范 Technical Code for Building Pile Foundations JGJ 94 94 Prepared by: China Academy of Construction Science Approved by: Ministry of Construction of the People’s Republic of China Implemented as of: July 1, 1995 II Notice on Issuance of Industrial Standard “Technical Code for Building Pile Foundations” Jianbiao No. [1994] 802 As required by the document from the former State Planning Commission Ji Biao Hang No. [1987] 78, the “Technical Code for Building Pile Foundations” piled by China Academy of Construction Science has been reviewed and is hereby approved to be a pulsory industrial standard with the number JGJ 94 – 94, for Horizontal force (F) as of July 1, 1995. This standard shall be managed by the China Academy of Construction Science, which exercises the centralized technical management of the construction engineering standards in the Ministry of Construction, and be interpreted by the Foundation Research Institute of China Academy of Construction Science. Any question or ments arising during its Horizontal force (F) can be informed to China Academy of Construction Science. This standard is published by the Standard Quota Research Institute of the Ministry of Construction. Ministry of Construction of the People’s Republic of China December 31, 1994 III Table of Contents 1. GENERAL PROVISIONS 1 2. TERMINOLOGIES AND SIGNS 2 Terminologies .................................................................................................................... 2 Signs ................................................................................................................................. 3 3. BASIC PROVISIONS FOR DESIGN 5 Basic information ............................................................................................................... 5 Type selection and arrangement of piles ................................................................................. 6 Design principles ................................................................................................................ 8 Pile foundation under special conditions ................................................................................ 9 4. STRUCTURE OF PILE FOUNDATION 12 Structure of piles ...............................................................................................................12 Construction of cap ............................................................................................................17 5. Calculation for Pile Foundation .............................................................................................21 Calculation of pile top action effect ......................................................................................21 Calculation of pile foundation vertical bearing capacity ..........................................................22 Calculation of pile foundation settlement ..............................................................................38 Calculation of pile foundation horizontal bearing capacity and displacement .............................42 Pile body bearing capacity and anticracking calculation .........................................................46 Cap calculation..................................................................................................................50 6. CONSTRUCTION OF CASTINSITU PILES 58 Preparation before construction ...........................................................................................58 General provisions .............................................................................................................59 Bored castinsitu pile with slurry protection wall ..................................................................62 Pipe sinking castinsitu pile and internal tamping castinsitu pile ...........................................66 Dry bored castinsitu pile ...................................................................................................69 7. CONSTRUCTION OF CONCRETE FABRICATED PILE AND STEEL PILE 71 Fabrication of concrete fabricated pile ..................................................................................71 Lifting, transport and stacking and storage of concrete fabricated pile .......................................72 Connection of concrete fabricated pile ..................................................................................73 Sinking of concrete fabricated pile .......................................................................................74 Fabrication of steel pile (steel pipe pile, H pile and other profiled piles) ....................................76 Welding of steel piles .........................................................................................................77 Transport, stacking and storage of steel piles .........................................................................78 Sinking of steel piles ..........................................................................................................78 8. CONSTRUCTION OF CAPS 79 General provisions .............................................................................................................79 Excavation and backfilling for foundation pits .......................................................................79 IV Construction of reinforcement and concrete......................................
點擊復制文檔內(nèi)容
法律信息相關推薦
文庫吧 www.dybbs8.com
公安備案圖鄂ICP備17016276號-1