freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

美國鋼鐵工業(yè)大氣污染物排放標(biāo)準(zhǔn)subpartzzzzz—nationalemissionstandardsforhazardousairpollutantsforironandsteel(已修改)

2025-09-04 13:44 本頁面
 

【正文】 Subpart ZZZZZ—National Emission Standards for Hazardous Air Pollutants for Iron and Steel Foundries Area SourcesSource: 73 FR 252, Jan. 2, 2008, unless otherwise noted. Applicability and Compliance Dates167。Am I subject to this subpart?(a) You are subject to this subpart if you own or operate an iron and steel foundry that is an area source of hazardous air pollutant (HAP) emissions.(b) This subpart applies to each new or existing affected source. The affected source is each iron and steel foundry.(1) An affected source is existing if you menced construction or reconstruction of the affected source before September 17, 2007.(2) An affected source is new if you menced construction or reconstruction of the affected source on or after September 17, 2007. If an affected source is not new pursuant to the preceding sentence, it is not new as a result of a change in its pliance obligations pursuant to 167。(d).(c) On and after January 2, 2008, if your iron and steel foundry bees a major source as defined in 167。, you must meet the requirements of 40 CFR part 63, subpart EEEEE.(d) This subpart does not apply to research and development facilities, as defined in section 112(c)(7) of the Clean Air Act.(e) You are exempt from the obligation to obtain a permit under 40 CFR part 70 or 40 CFR part 71, provided you are not otherwise required by law to obtain a permit under 40 CFR (a) or 40 CFR (a). Notwithstanding the previous sentence, you must continue to ply with the provisions of this subpart.(f) If you own or operate an existing affected source, you must determine the initial applicability of the requirements of this subpart to a small foundry or a large foundry based on your facility39。s metal melt production for calendar year 2008. If the metal melt production for calendar year 2008 is 20,000 tons or less, your area source is a small foundry. If your metal melt production for calendar year 2008 is greater than 20,000 tons, your area source is a large foundry. You must submit a written notification to the Administrator that identifies your area source as a small foundry or a large foundry no later than January 2, 2009.(g) If you own or operate a new affected source, you must determine the initial applicability of the requirements of this subpart to a small foundry or a large foundry based on your facility39。s annual metal melting capacity at startup. If the annual metal melting capacity is 10,000 tons or less, your area source is a small foundry. If the annual metal melting capacity is greater than 10,000 tons, your area source is a large foundry. You must submit a written notification to the Administrator that identifies your area source as a small foundry or a large foundry no later than 120 days after startup.167。What are my pliance dates?(a) If you own or operate an existing affected source, you must achieve pliance with the applicable provisions of this subpart by the dates in paragraphs (a)(1) through (3) of this section.(1) Not later than January 2, 2009 for the pollution prevention management practices for metallic scrap in 167。(a) and binder formulations in 167。.(2) Not later than January 4, 2010 for the pollution prevention management practices for mercury in 167。(b).(3) Except as provided in paragraph (d) of this section, not later than 2 years after the date of your large foundry39。s notification of the initial determination required in 167。(f) for the standards and management practices in 167。.(b) If you have a new affected source for which the initial startup date is on or before January 2, 2008, you must achieve pliance with the provisions of this subpart not later than January 2, 2008.(c) If you own or operate a new affected source for which the initial startup date is after January 2, 2008, you must achieve pliance with the provisions of this subpart upon startup of your affected source.(d) Following the initial determination for an existing affected source required in 167。(f),(1) Beginning January 1, 2010, if the annual metal melt production of your small foundry exceeds 20,000 tons during the preceding calendar year, you must submit a notification of foundry reclassification to the Administrator within 30 days and ply with the requirements in paragraphs (d)(1)(i) or (ii) of this section, as applicable.(i) If your small foundry has never been classified as a large foundry, you must ply with the requirements for a large foundry no later than 2 years after the date of your foundry39。s notification that the annual metal melt production exceeded 20,000 tons.(ii) If your small foundry had previously been classified as a large foundry, you must ply with the requirements for a large foundry no later than the date of your foundry39。s most recent notification that the annual metal melt production exceeded 20,000 tons.(2) If your facility is initially classified as a large foundry (or your small foundry subsequently bees a large foundry), you must ply with the requirements for a large foundry for at least 3 years before reclassifying your facility as a small foundry, even if your annual metal melt production falls below 20,000 tons. After 3 years, you may reclassify your facility as a small foundry provided your annual metal melt production for the preceding calendar year was 20,000 tons or less. If you reclassify your large foundry as a small foundry, you must submit a notification of reclassification to the Administrator within 30 days and ply with the requirements for a small foundry no later than the date you notify the Administrator of the reclassification. If the annual metal melt production exceeds 20,000 tons during a subsequent year, you must submit a notification of reclassification to the Administrator within 30 days and ply with the requirements for a large foundry no later than the date you notify the Administrator of the reclassification.(e) Following the initial determination for a new affected source required in 167。(g),(1) If you increase t
點(diǎn)擊復(fù)制文檔內(nèi)容
環(huán)評(píng)公示相關(guān)推薦
文庫吧 www.dybbs8.com
公安備案圖鄂ICP備17016276號(hào)-1