freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

通風(fēng)與空調(diào)工程施工記錄模板完整版(已修改)

2025-08-23 10:38 本頁面
 

【正文】 交 工 文 件 目 錄Contents of Documents for Project Hand Over 施02 編號No: 單位(子單位)工程名稱Name of unit project文件內(nèi)容Contents of documents通風(fēng)與空調(diào)工程施工記錄Record of ventilation and air conditioning works序號No.交工文件名稱Name of documents of project hand over頁數(shù)Page備注Remarks1設(shè)備開箱檢查記錄Record of equipment boxopen inspection通012基礎(chǔ)驗(yàn)收記錄Record of foundation acceptance通023墊鐵隱蔽記錄Inspection record of sizing blocks concealment通044隱蔽工程(系統(tǒng)封閉)檢查記錄Record of concealed works (system enclose) inspection通035設(shè)備安裝檢查記錄Re cord of equipment installation inspection通076靜置設(shè)備安裝檢查記錄Record of stationary equipment installation inspection通087閥門試驗(yàn)(清洗)記錄Record of valves test (cleaning) 通058風(fēng)管漏光檢測記錄Air duct check and measuring for light leakage風(fēng)019風(fēng)管漏風(fēng)檢測記錄Record of check and measuring for air duct leakage風(fēng)0210管道(設(shè)備)強(qiáng)度試驗(yàn)記錄Record of pipeline (equipment) hydraulic pressure test水0111輔助設(shè)備水(氣)壓試驗(yàn)記錄Record of water(air)pressure test of auxiliary equipment水0312消聲器安裝記錄 Record of silencer installation 風(fēng)0313風(fēng)機(jī)盤管試驗(yàn)記錄Record of fancoil test風(fēng)0414變風(fēng)量末端裝置試驗(yàn)記錄Test record of air varying terminal device風(fēng)0515凈化系統(tǒng)風(fēng)管清洗記錄Record of air ducts of purifying system washing風(fēng)0616層流罩(風(fēng)機(jī)過濾單元)安裝記錄Record of laminar flow cover (fan filtering unit) installation 風(fēng)0717空氣凈化系統(tǒng)檢測記錄Record of air purifying system check and measuring風(fēng)0818單機(jī)試運(yùn)轉(zhuǎn)記錄Record of single machine test run通0919風(fēng)系統(tǒng)調(diào)試記錄 Record of ventilation system missioning風(fēng)0920通風(fēng)空調(diào)系統(tǒng)無生產(chǎn)負(fù)荷聯(lián)合試運(yùn)轉(zhuǎn)記錄Record of ventilation amp。 airconditioning system nonload bined test running 風(fēng)1021設(shè)備/管道防腐、保溫或保冷、涂漆施工記錄Record of anticorrosion、insulation、painting of equipment /pipeline通06 質(zhì)量部門負(fù)責(zé)人: 制表人: 年 月 日Quality Dept. in Charge: Sheet Maker Year/Month/Day風(fēng)管漏光檢測記錄Air Duct Check and Measuring for Light Leakage 風(fēng)01 編號No:_____單位工程名稱Name of unit project子分部工程名稱Name of divisional project 分項(xiàng)工程名稱Name of subdivisional project光源功率Power of light source設(shè)計(jì)風(fēng)壓(Mpa)Design air pressure檢測日期Inspection date施工圖號(系統(tǒng)名稱)Construction drawing No. (System name)實(shí)測記錄Measured record部位Position風(fēng)管縫長 (m)Air duct seam length檢測結(jié)果Check result部位Position風(fēng)管縫長 (m)Air duct seam length檢測結(jié)果Check result檢測結(jié)果:Check result:監(jiān)理(建設(shè))單位:Supervision Company (The Owner): (公章)監(jiān)理工程師: ( Seal )Supervising Engineer:(建設(shè)單位代表):(Representative of The Owner): 年 月 日Year/Month/Day施工單位:Construction Company:班組長:Monitor of Work Team: (公章)施工員: ( Seal )Technician: 質(zhì)檢員: Quality Inspector: 年 月 日Year/Month/Day風(fēng)管漏風(fēng)檢測記錄Record of Ch
點(diǎn)擊復(fù)制文檔內(nèi)容
黨政相關(guān)相關(guān)推薦
文庫吧 www.dybbs8.com
公安備案圖鄂ICP備17016276號-1