【正文】
沈陽(yáng)建筑大學(xué)畢業(yè)設(shè)計(jì)論文(CAD截圖在最后一頁(yè))沈陽(yáng)建筑大學(xué)畢業(yè)設(shè)計(jì)說(shuō)明書 畢 業(yè) 論 文 題 目 院(系)專業(yè)班級(jí)學(xué) 生 姓 名 性別 指 導(dǎo) 教 師 職稱 年月日 1沈陽(yáng)建筑大學(xué)畢業(yè)設(shè)計(jì)論文目 錄 序???????????????????????摘要???????“?????????????? 英文摘要????????????????????關(guān)鍵詞????????????????????? 正文 設(shè)計(jì)說(shuō)明書第一章 結(jié)構(gòu)方案設(shè)計(jì)?????????????????23第二章 荷載匯集???????????????????27第三章 風(fēng)荷載????????????????????46第五章 豎向荷載梁柱截面驗(yàn)算?????????????????50第七章 柱腳設(shè)計(jì)????????????????“??53第八章 基礎(chǔ)設(shè)計(jì)計(jì)算?????????????????55第九章 樓板計(jì)算???????????????????59第十章 節(jié)點(diǎn)設(shè)計(jì)???????????????????60 第十一章 樓梯計(jì)算???????????????????63 附:一 參考資料2沈陽(yáng)建筑大學(xué)畢業(yè)設(shè)計(jì)論文二 致謝三 外文翻譯 序言似水流年,時(shí)光流轉(zhuǎn),一切揮手瞬間。終于到了畢業(yè)的日子。四個(gè)月緊張忙碌而又充實(shí)的畢業(yè)設(shè)計(jì)伴隨著幾多的秉燭夜戰(zhàn)與幾多的徹夜難免轉(zhuǎn)眼間即將過去了。梅花香自苦寒來(lái),經(jīng)過四年大學(xué)生活的洗禮與造就,面臨畢業(yè)設(shè)計(jì)的嚴(yán)峻考驗(yàn),猛然間發(fā)現(xiàn)自己已有了沉甸甸的收獲,但也有書到用時(shí)方恨少的感慨。畢業(yè)設(shè)計(jì)是對(duì)大學(xué)學(xué)習(xí)生活的一次檢測(cè),其目的就是為了融會(huì)貫通我們?cè)诟鱾€(gè)階段的學(xué)習(xí)成果。通過畢業(yè)設(shè)計(jì),可以培養(yǎng)我們綜合運(yùn)用基礎(chǔ)理論、基本知識(shí)和基本技能,分析和解決實(shí)際問題的能力。通過對(duì)這個(gè)題目的深入理解,我逐漸加深了對(duì)實(shí)際工程的了解,這對(duì)以后的學(xué)習(xí)和工作的幫助是極大的。在這四個(gè)月中有老師殷勤的指導(dǎo)與關(guān)懷,有同學(xué)的幫助與關(guān)心,,譜寫著自己的篇章。誠(chéng)然設(shè)計(jì)的過程是艱苦的,但隨著一道道難關(guān)被攻克,一個(gè)盲點(diǎn)被掃。一種成就感和自豪感油然而生。若說(shuō)四年的學(xué)習(xí)是一種量的積累,那么這四個(gè)月便是完成了質(zhì)的飛躍。設(shè)計(jì)已臨近尾聲,畢業(yè)的鐘聲即將敲響,此時(shí)此刻信中可謂是百感交集。沒唱完的歌就留在這吧,沒實(shí)現(xiàn)的夢(mèng)還要去追啊。我們近乎勇敢的奔向前程,是我們對(duì)這段青春最好的紀(jì)念。有一種韶光純真如水,有一種選擇無(wú)怨無(wú)悔,有一種日子美如傳奇,有一種故事沒有結(jié)尾??在此設(shè)計(jì)期間,指導(dǎo)教師和其他專業(yè)老師給了我很大的幫助,我十分感動(dòng),在此我深深的表示感謝!本設(shè)計(jì)由于我學(xué)識(shí)有限,時(shí)間有限,難免有所疏漏和錯(cuò)誤,懇請(qǐng)各位老師批評(píng)指正?。?3沈陽(yáng)建筑大學(xué)畢業(yè)設(shè)計(jì)論文摘要本工程位于沈陽(yáng)市東陵區(qū)。本工程占地面積約1200平方米左右。本建筑主體六層,設(shè)計(jì)本著簡(jiǎn)潔,美觀,大方,經(jīng)濟(jì),適用的原則。建筑立面規(guī)整,采用白色瓷磚裝飾外墻,女兒墻實(shí)心磚砌筑,除正門為玻璃門外,其余均采用實(shí)木門,窗為塑鋼窗。本設(shè)計(jì)包括四部分:一,建筑設(shè)計(jì)部分;二,結(jié)構(gòu)設(shè)計(jì)部分;三,結(jié)構(gòu)計(jì)算部分;四,建筑圖和結(jié)構(gòu)圖及施工部分。設(shè)計(jì)中,我遵照國(guó)家現(xiàn)行的建筑類設(shè)計(jì)規(guī)范以及制圖標(biāo)準(zhǔn),參照教科書中的設(shè)計(jì)實(shí)例,查閱各種建筑和結(jié)構(gòu)設(shè)計(jì)圖集,所以該設(shè)計(jì)符合建筑設(shè)計(jì)的程序要求。本設(shè)計(jì)地震設(shè)防烈度為7度,結(jié)構(gòu)設(shè)計(jì)中考慮了水平地震作用。工程地質(zhì)條件良好,Ⅱ類場(chǎng)地?;A(chǔ)采用獨(dú)立基礎(chǔ),混凝土強(qiáng)度C20。設(shè)計(jì)中地震力采用D值法計(jì)算,豎向荷載采用彎矩二次分配法計(jì)算。本工程結(jié)構(gòu)形式為鋼結(jié)構(gòu)框支結(jié)構(gòu),柱子為H型鋼Q235B,首層截面400180。400,其余各層為350180。350,框架梁為H型鋼,截面為500180。300和300180。200,結(jié)構(gòu)符合抗震要求。計(jì)算中包括荷載計(jì)算,基本風(fēng)壓 反彎點(diǎn) 調(diào)幅系數(shù) 4沈陽(yáng)建筑大學(xué)畢業(yè)設(shè)計(jì)論文AbstractThis project locates in Shenyang city in Dongling district for the Shenyang city Jiahe Hotel .This project cover an area of area control the, square metre of floor area about 1200 square metres.Construct main six floors , construct with rectangle, this kind of design make the building of official business succinct, beautiful, grace, economy, suitable. construct upright surface rule decorate outside wall with white ceramic tile, daughter wall solid brick build, is glass except front door besides, others adopt really wooden door, window is mould steel window.Design include 4 minutes: 1, building design part。 2, structural design part。 3, structural calculation part。 4, building picture and structural picture and construction part.Design , I conform to national current building kind of design standard as well as drawing standard, reference textbook in design example, look up various buildings and the structural fair of design drawing, should so design accord with the program requirement of building design.Design earthquake set up defences intensity is 7 degrees have considered horizontal seismic role in, structural design, basic wind pressure is KN/M2, basic snow press for the KN/M2. Project geological conditions of good, Ⅱ kind of place. Foundation lonely and the C 20 of concrete strength. Design in seismic force, calculate with D value law, erect to load distribute law calculation twice with curved rules.This project configuration is the castinplace frame structure of steel, the pillar grade of concrete strength is 350180。350 for Q235B, first and second layer section 400180。400 and other each layer, frame beam , section is 500180。300 and 300180。200, structure accords with antiseismic requirement . including load calculation , force bination, basic design and stairs design etc.. during design process , make me deepen understanding the knowledge of university studying , melt merely can link up5沈陽(yáng)建筑大學(xué)畢業(yè)設(shè)計(jì)論文have reached the best use, raise own ability. blueprint part acplish standard as far as possible, make clear , detailed, read and is under construction easily.Do not let matter, ask detail to see building, structural design manual. Keyword:Force bination Basic wind pressureOn the contrary curved point The coefficient of amplitude modulation 6沈陽(yáng)建筑大學(xué)畢業(yè)設(shè)計(jì)論文 沈 陽(yáng) 建 筑 大 學(xué)畢業(yè)設(shè)計(jì)(論文)任務(wù)書題目 : 沈陽(yáng)市嘉禾賓館土木工程 院(系) 土木工程 專業(yè)指 導(dǎo) 教 師: 許峰 職 稱: 講師學(xué) 生 人 數(shù): 3 設(shè) 計(jì) 地 點(diǎn):制 定 日 期: 2004年08月7沈陽(yáng)建筑大學(xué)畢業(yè)設(shè)計(jì)論文設(shè)計(jì)(論文)的原始資料及依據(jù):1)、建筑地點(diǎn)及擬建基地平面圖本建筑位于沈陽(yáng)市東陵