【正文】
目 錄1 緒論 .......................................................1 **基本情況簡介 .........................................1 **煤礦原始情況 .........................................1 地面用電負(fù)荷統(tǒng)計 ...................................1 井下采區(qū)設(shè)計原始資料 ...............................22 **35KV 煤礦供電設(shè)計方案及論證 ..............................5 **煤礦總體設(shè)計方案 ......................................5 方案的可行性論證 .......................................5 技術(shù)方面論證 .......................................5 經(jīng)濟(jì)方面論證 .......................................63 礦井地面變電所設(shè)計 .........................................7 地面用電負(fù)荷計算 .......................................7 地面變電所位置選擇 ....................................10 地面變電所的主接線 ....................................11 35kV 側(cè)主接線 .....................................11 10kV 側(cè)主接線 .....................................124 井下中央變電所及供電設(shè)計 ..................................15 井下電力負(fù)荷計算 ......................................15 井下負(fù)荷的計算方法 ................................15 井下負(fù)荷的計算 ....................................16 井下中央變電所位置選擇原則 ............................17 井下中央變電所主接線 ..................................185 短路電流計算 ..............................................20 短路電流計算選擇 ......................................20 計算短路電流的目的 ....................................20 三相短路電流的計算方法 ................................21 電源為無限容量時的短路電流計算 ....................21 電源為有限容量時的短路電流計算 ....................22 短路電流計算 ..........................................236 設(shè)備選擇 ..................................................30 一般的選擇方法 ........................................30 短路動、熱穩(wěn)定性校驗原則 ..............................31 變壓器選擇 ............................................31 地面設(shè)備選擇舉例 ......................................31 35kV 設(shè)備的選擇 ...................................32 10kV 設(shè)備的選擇 ...................................34 井下設(shè)備選擇 ..........................................35 電纜選擇計算 ......................................35 井下開關(guān)選擇 ......................................377 保護(hù)裝置 ..................................................38 繼電保護(hù)裝置 ..........................................38 防雷保護(hù)及接地 ........................................39 變電所防雷裝置 ....................................39 地面變電所保護(hù)接地網(wǎng) ..............................40 井下保護(hù)接地網(wǎng) ....................................408 結(jié) 論 .....................................................43致 謝 ........................................................44參考文獻(xiàn) .....................................................45摘 要本設(shè)計是在煤礦實(shí)習(xí)的基礎(chǔ)上完成的。通過對**煤礦的實(shí)地考察,結(jié)合該礦現(xiàn)有生產(chǎn)水平和未來發(fā)展前景,在原有供電系統(tǒng)的基礎(chǔ)上根據(jù)煤炭生產(chǎn)行業(yè)的有關(guān)規(guī)定進(jìn)一步規(guī)范和完善。**煤礦系 240 萬噸大煤礦,供電系統(tǒng)設(shè)計內(nèi)容包括:地面變電所設(shè)計、井下供電設(shè)計、短路電流計算、地面及井下高低壓設(shè)備選擇、保護(hù)裝置、地面及井下接地等。本設(shè)計主供電系統(tǒng)由來自不同地方的兩路 35kV 線路供電,經(jīng)主變壓器變?yōu)?10kV,由單母分段的接線方式分別向地面和井下供電。根據(jù)煤礦供電系統(tǒng)特點(diǎn),本設(shè)計系統(tǒng)主線路均以最大運(yùn)行方式進(jìn)行整定,并以此對線路及其設(shè)備進(jìn)行選擇。**煤礦 35kV 供電系統(tǒng)包括井上供電系統(tǒng)和井下供電系統(tǒng)兩個部分。為保證供電的安全、可靠,又考慮**煤礦 50 年的服務(wù)期限,從經(jīng)濟(jì)和技術(shù)兩個方面對本礦進(jìn)行整體設(shè)計,以達(dá)到滿足對**煤礦設(shè)計的合理性。關(guān)鍵詞:**煤礦 35KV 供電 設(shè)備選擇AbstractThe design is based on the pletion of the internship in the coal mine. Da Liao Gap of Ningwu Coal Mine through field visits, in conjunction with the existing level of production plant and the prospects for future development in the power supply system on the basis of the relevant provisions of the coal production industry further standardize and improve.Da Liao Gap of Ningwu Coal Mine is 30 million tons and coal mines, power system design include : ground substations design, mine supply design, short circuit current calculations, ground and underground highlow voltage equipment selection, protection devices, ground and underground grounded. From the design of the power supply system in different parts of the two roads 35kV power line, the main 10kV transformers into the singleparent separately to the above ground and underground wiring electricity. According to the characteristics of coal supply system, the design of the main lines are the largest operation of the system means the set of lines and equipment and to choose. Ningwu coal 35kV electricity supply system includes two parts of the Underground power supply system and above ground power supply system. Considering the three years’ service of Ningwu mine, in order to ensure the security of electricity supply, reliable, the paper designs the engineering system which is reasonable for Lingbei mine from the economic and technical aspects.Key words: Lingbei Coal Mine。 35kV。 Power Supply。 electrical equipment selection1 緒論本設(shè)計 為了保證 **煤礦 供電質(zhì)量,保證供電系統(tǒng)運(yùn)行的安全性、可靠性和經(jīng)濟(jì)性, 不但要求監(jiān)測監(jiān)控和保護(hù)效果要好,而且重要的一點(diǎn)要求在**煤礦的供電設(shè)計中嚴(yán)格遵守國家煤礦設(shè)計的有關(guān)規(guī)定,保證其供電的可靠性和安全性,盡量避免和減少因系統(tǒng)供電和設(shè)備保護(hù)問題給煤礦帶來的不安全因素。 **基本情況簡介**位于山西省境內(nèi)中部,南同蒲鐵路、大運(yùn)高速和大運(yùn)二級公路由本區(qū)東南部經(jīng)過,介休至陽泉曲和介休至柳林鐵路支線由擴(kuò)區(qū)北部通過,其中大運(yùn)二級公路距擬建的礦井工業(yè)場地僅 4km,距南同蒲鐵路僅 ,向井田東北方向經(jīng)介休抵達(dá)太原,向井田東南方向經(jīng)靈石縣抵達(dá)臨汾和運(yùn)城,區(qū)內(nèi)均有簡易公路與干線公路相通,采用汽車外運(yùn)煤炭可通過大運(yùn)高速和大運(yùn)二級公路直接運(yùn)往全國各地。在南同蒲鐵路的一側(cè)建有河溪溝礦井鐵路裝車站,本礦井煤炭可通過汽車運(yùn)往該裝車站裝火車運(yùn)往全國各地。礦區(qū)交通十分便利。 **煤礦原始情況本次設(shè)計主要針對**煤礦進(jìn)行設(shè)計,位于礦井工業(yè)場地東南面15km處,有靈石110kV變電站一座,內(nèi)設(shè)兩臺31500kVA 110/35/10kV變壓器,高峰負(fù)荷20220kW,其110kV電源兩回;有35kV及10kV出線間隔。位于礦井工業(yè)場地東北面20km處,有北村110kV變電站一座,內(nèi)設(shè)兩臺20220kVA 110/35/10kV變壓器,高峰負(fù)荷15000kW,其110kV電源兩回;無35kV及10kV出線間隔。位于礦井工業(yè)場地西南面8km處,有礦區(qū)發(fā)展規(guī)劃擬建的北王中110kV變電站一座,內(nèi)設(shè)兩臺20220kVA 110/35/10kV變壓器,其110kV電源兩回;有35kV及10kV出線間隔。礦井地面工業(yè)場地設(shè)一座 35kV 變電站,其兩回 35kV 電源均引自擬建的北王中 110kV 變電站的 35kV 母線,供電電源十分可靠。 地面用電負(fù)荷統(tǒng)計地面用電負(fù)荷主要包括主副井提升機(jī)、扇風(fēng)機(jī)等一級地面用電負(fù)荷,此外還包括機(jī)修車間、室內(nèi)照明、工業(yè)場地照明和其它的一些常規(guī)負(fù)荷,這些負(fù)荷構(gòu)成了**煤礦的地面用電系統(tǒng)。**煤礦設(shè)計地面用電負(fù)荷統(tǒng)計如表 11 所示。表 11 地面用電負(fù)荷統(tǒng)計表序號 設(shè)備名稱 型號規(guī)格 數(shù)量容量(單臺)(kW)電壓(V)1 提升機(jī) 2 扇風(fēng)機(jī) BDK61882(1 臺備用)160 3803 機(jī)修車間 20 3804 室內(nèi)照明 10 2205工業(yè)場地照明10 2206 其它 50 井下采區(qū)設(shè)計原始資料井下采區(qū)巷道及設(shè)備布置如圖 11 所示。圖 11 1411 采區(qū)巷道及設(shè)備布置圖說明:①②……為用電設(shè)備負(fù)荷,其具體設(shè)備如 1411 采區(qū)用電設(shè)備負(fù)荷統(tǒng)計表 12 中2……所示**煤礦采區(qū)具體情況如下:該礦為低瓦斯較高涌水量礦井,年產(chǎn)量設(shè)計為 240 萬噸,煤層南北走向,傾角 11 度(北高南低) ,斜井開拓,井深 120 米;煤質(zhì)中硬、厚度為 米,頂,底板中等穩(wěn)定。1411 采區(qū)為中間上山開采,采區(qū)分三個區(qū)段,區(qū)段總長度 345 米,工作面長 100 米;東翼走向長度 400 米,采用國產(chǎn) 80 機(jī)組采煤,煤巷掘進(jìn)用放炮落煤、皮帶機(jī)運(yùn)輸;西翼最大長度走向 280 米,為炮采工作面。井下中央變電