freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

太倉市科技信息產(chǎn)業(yè)園二期工程土建及安裝工程招標文件正文(已修改)

2025-06-18 22:21 本頁面
 

【正文】 Gay is now a provincial key construction project of aluminum Ltdprovince with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall responsibility for the daytoday affairs of the project. In order to ensure that southern pany39。s control the scale of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation, the overall goal. He and Engineering Department under the leadership of all the staff in the pany39。s technical mand, on the difficulties and to overe technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. Technical innovation project of the year, started and pleted a series of bids and pleted to date, from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, installation, missioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industry39。s fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity of 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other building materials, the old buildings on the base encountered great difficulties in dealing with significant increase in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energysaving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide dense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumption can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, current efficiency in October had reached 93%, is close to and reach the domestic advanced level. In the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost control, project progress, quality control and coordination among the various subprojects and various professional, technical mand under the correct leadership, both from an overall perspective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according to the contract. He tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good ... 太倉市建設(shè)工程示范施工招標文件(適用于資格后審網(wǎng)上招標項目)工程名稱:太倉市科技信息產(chǎn)業(yè)園二期工程土建及安裝工程 工程地點:太倉市科教新城 招標人:太倉市科教文化發(fā)展有限公司法定代表人或其委托代理人: 王哲招標代理機構(gòu): 蘇州正信工程造價咨詢事務(wù)所有限責(zé)任公司法定代表人或其委托代理人:高偉強編制日期:2014年01月05日 使 用 說 明一、本施工招標文件示范文本適用于采用資格后審、實行《建設(shè)工程工程量清單計價規(guī)范》(GB505002008)并采用網(wǎng)上招投標系統(tǒng)評標的施工招標工程。采用總價包干、設(shè)計施工總承包招標或因特殊原因不采用網(wǎng)上招投標系統(tǒng)評標的工程,招標人需對本招標文件進行修改后方可使用,但仍應(yīng)使用電子標書編制系統(tǒng)進行招標文件的編制。二、本施工招標文件示范文本的主要編寫依據(jù):1.《中華人民共和國建筑法》;2.《中華人民共和國招標投標法》;3.《中華人民共和國合同法》;4.《江蘇省招標投標條例》;《工程建設(shè)項目施工招標投標辦法》(國家七部委30號令)6.《建設(shè)工程工程量清單計價規(guī)范》(GB505002008);7.《中華人民共和國標準施工招標文件》(2007年版);8.《房屋建筑和市政工程標準施工招標文件》(2010年版);9.其他有關(guān)工程建設(shè)的法律、法規(guī)、規(guī)章和規(guī)范性文件。三、本施工招標文件示范文本用相同序號標示的章、節(jié)、條、款、項、招標人應(yīng)根據(jù)招標項目具體特點和實際需要具體化,確實沒有需要填寫的,在空格中用“/”標示。四、第三章“評標辦法”分別規(guī)定經(jīng)評審的最低投標價法、綜合評估法和合理定價抽簽法三種評標方法,供招標人根據(jù)招標項目具體特點和實際需要選擇適用。招標人選擇適用綜合評估法的,各評審因素的評審標準、分值和權(quán)重等由招標人自主確定。五、本施工招標文件示范文本第五章“工程量清單”由招標人根據(jù)《計價規(guī)程》、《08清單計價規(guī)范》、《08清單計價規(guī)范》補充規(guī)范、招標項目具體特點和實際需要編制,并與“投標人須知”、“通用合同條款”、“專用合同條款”、“技術(shù)標準和要求”、“圖紙”等文件結(jié)合起來理解或解釋。六、本施工招標文件示范文本第七章“技術(shù)標準和要求”參照《房屋建筑和市政工程標準施工招標文件》(2010年版)編制。其中以空格標示的以及第二節(jié)和第三節(jié)由招標人根據(jù)招標項目具體特點和實際需要編制?!凹夹g(shù)標準和要求”中的各項技術(shù)標準應(yīng)符合國家強制性標準,不得要求或標明某一特定的專利、商標、名稱、設(shè)計、原產(chǎn)地或生產(chǎn)供應(yīng)者,不得含有傾向或者排斥潛在投標人的其他內(nèi)容。如果必須引用某一生產(chǎn)供應(yīng)者的技術(shù)標準才能準確或清楚地說明擬招標項目的技術(shù)標準時,則應(yīng)當在參照后面加上“或相當于”字樣。七、本施工招標文件的解釋權(quán)屬于招標人,招標人對招標文件示范文本的內(nèi)容存在異議時,可向建設(shè)行政主管部門申請解釋。八、本招標文件示范文本由于水平和時間有限,難免存在不妥之處,請各編制單位和使用單位在試行過程中,將意見、建議、以及遇到的問題,及時向太倉市住房和城鄉(xiāng)建設(shè)局建設(shè)工程招標投標辦公室書面反映,以便根據(jù)實際執(zhí)行過程中出現(xiàn)的問題及時進行修改。Four outstanding works. They are derived from their own inner feelings. I also sent a student to attend the class Department speech contest, failed to get a good result, but also actively cooperate with the Department and class activities! in order to create a demonstration dorm room, our weekly class to every bedroom check, where proposed is insufficient. In order to clean up the bedroom, we use the brush brushes a bedroom again. For the class out of a force. In the event we, many projects did not get the desired results. But we understand that we tried, and in the struggle. Also has made good progress in many of the! in my class the work carried out and the results achieved, thanks to the concern and support of the Department, thanks to instructor te
點擊復(fù)制文檔內(nèi)容
公司管理相關(guān)推薦
文庫吧 www.dybbs8.com
公安備案圖鄂ICP備17016276號-1