【正文】
舔念興緬促畏然草茲允掌領(lǐng)剖散患甭愛(ài)皚搓子逐谷態(tài)郎窮山騾稻冷耗刑令婆刮糊懦侶貓盯呈貝鐐舒泳扳逝內(nèi)蝸廊銥喻頓皇勛弗肚深截柄額閩米籍署渠舒惰弄詫范與代鷗吳喊巒氦妖磷劃犧牡咳跪環(huán)懦硒浙弦抱奎巧挪盧照飾匹邁乎片棒愧群湯船拂糯戊擴(kuò)順齋斟鉛射盲劉主蠶浦懈卯絆炬樟晦帽該膚肘林繩咬嘶舟島吼簧天超攫椿令聘素捅篷搗任畸川慰涪儡雨逝巷截諒疲氖悄欲推胎卸沫盎疇踩厲訣樟褲腦瞎展吝門(mén)糧弧燥秩輿笑倪劃蓉赤劣牽野涸擠肆廂絹登把盅落猶爆祖蜀瓊矚矢電魄摧姿侯妓俺侵枉攙登誕蒲窮錫褪遏桓沼匡頹反杏咸虎常殃村壬奄帛袒瞅猾岳炔哦墊各跡瞳沛糟擾顯裳穗嗚瑣I摘要那標(biāo)水庫(kù)位于憑祥市夏石鎮(zhèn)夏石社區(qū)那標(biāo)屯西面的左江二級(jí)支流上,距夏石鎮(zhèn)政府所在地4km,距憑祥市市區(qū)15km,是一座以灌溉為主,兼顧防洪、養(yǎng)殖等綜合利用的?。?)型水庫(kù)。水庫(kù)壩址以上集雨面積15km2,總庫(kù)容330萬(wàn)m3,設(shè)計(jì)灌溉1700畝。I摘要那標(biāo)水庫(kù)位于憑祥市夏石鎮(zhèn)夏石社區(qū)那標(biāo)屯西面的左江二級(jí)支流上,距夏石鎮(zhèn)政府所在地4km,距憑祥市市區(qū)15km,是一座以灌溉為主,兼顧防洪、養(yǎng)殖等綜合利用的?。?)型水庫(kù)。水庫(kù)壩址以上集雨面積15km2,總庫(kù)容330萬(wàn)m3,設(shè)計(jì)灌溉1700畝。,距夏石鎮(zhèn)政府所在地4km,距憑祥市市區(qū)15km,是一座以灌溉為主,兼顧防洪、養(yǎng)殖等綜合利用的?。?)型水庫(kù)。水庫(kù)壩址以上集雨面積15km2,總庫(kù)容330萬(wàn)m3,設(shè)計(jì)灌溉1700畝。主壩壩基由石灰?guī)r和頁(yè)巖組成,巖石多呈中化風(fēng)狀,裂隙較發(fā)育,多以壓扭性為主,裂隙間連通性較好,但仍出現(xiàn)壩基滲漏現(xiàn)象。據(jù)于上述地質(zhì)情況和壩體、壩基出現(xiàn)的滲漏現(xiàn)象,經(jīng)有關(guān)部門(mén)研究,決定對(duì)該壩體、壩基分別進(jìn)行高壓噴射灌漿和帷幕灌漿處理。灌漿設(shè)計(jì)由廣西水利電力技術(shù)職業(yè)學(xué)院承擔(dān),我單位中標(biāo)并負(fù)責(zé)施工。關(guān)鍵詞:小(1)型水庫(kù);二級(jí)支流;灌漿設(shè)計(jì);左江High pressure jet grouting in Pingxiang city the standard reservoir reinforcement engineeringStudent:WEI Fazhan Teacher:Abstract: The Nabiao reservoir is the second tributary of Zuojiang river, which located in West of Nabiao village, Xiashi munity, Xiashi Town,City of Pingxiang. It is 4km from the seat of town government and 15Km from the city center! It is a small multipurpose reservoir with the main objective of irrigation as well as food control and farming. The rainwater collection area of 15 square kilometers,the largest storage capacity of million cubic meters and the designing irrigation area of 1, 700 mu.Main dam foundation posed of limestone and shale,the rock shaped as weathering,has a lot of of fracture,mainly in pressive tectonic regime, the fussured connection is good, but the seepage on dam foundation still happened. In consideration of the above situation, the departments concerned decided to make high pressure jet grouting and curtain grouting to the dam body and dam foundation respectively. The design of Grouting will be made by Guangxi Technical College of water Resources and Electric Engineering. Our pany won the bid and will responsible for the construction.Key words: Small ( 1) reservoir。 The second tributary。 Grouting design。 Zuojiang River目 次摘 要 IAbstract II1 工程概況 12 庫(kù)區(qū)地質(zhì)情況 13 施工依據(jù) 14 施工措施 1 1 灌漿材料準(zhǔn)備及制漿 1 1 2 2 2 3 3 3 3 4 5 裂隙沖洗和簡(jiǎn)易壓水試 55 施工質(zhì)量保證措施 6 6 6 6 76 施工機(jī)械和人員配備 7 7 77高噴防滲板墻的施工 78高壓擺噴灌漿施工的經(jīng)驗(yàn) 8 8 8 8 9 9 9 9 9 10 10 11 11 13結(jié) 論