【正文】
Magna Steyr N85 105 Supplier specifications for delivery of prototype parts 供應(yīng)商樣件發(fā)運(yùn)規(guī)范 Supplier Training Package 供應(yīng)商培訓(xùn)包 September 2021 Author: W. Wiesenhofer 1 Author: W. Wiesenhofer 2 ? This training is explains the documentation for part shipment only. 這個培訓(xùn)解釋了零件發(fā)運(yùn)所需文件材料 ? The expectation is that PT parts meet all specifications and the documentation supplied will support that ,使動力總成零部件滿足所有的規(guī)范和提交的文件 ? If parts don’t meet all specifications 如果零件沒有滿足所有規(guī)范 or 或 timing issues do not allow the proper measurement documentation 進(jìn)度問題不允許適當(dāng)?shù)臏y量文件材料 then 那么 a deviation is needed by the supplier. 需要由供應(yīng)商偏差認(rèn)可 ?The expectation is 30% or not less than 3 parts will be measured for each shipment. 每批要求測量 30%或不少于3件。 Any deviations to the quantity or items to be measured must also be 經(jīng)過批準(zhǔn)。 ? Approval must occur prior to ? The Supplier should work with the SE team and the MGL to get approval. 供應(yīng)商應(yīng)與 SE團(tuán)隊(duì)和 MGL合作來獲得批準(zhǔn) ?The document for approval is “Request for Approval G1/G2”批準(zhǔn)文件資料是“ G1/G2批準(zhǔn)申請” (see example) Approvals Required Prior to Part Shipment:必須在零件發(fā)運(yùn)前批準(zhǔn) Author: W. Wiesenhofer 3 Listing of Magna Steyr Module Engineers Magna Steyr 模塊工程師清單 Development Sample Report樣件開發(fā)報(bào)告 Explanation of the delivered documents acc. MSF N85 105依據(jù) MSF N85的發(fā)運(yùn)文件資料的解釋 Author: W. Wiesenho