【正文】
摘 要 變電站是電力系統(tǒng)的重要組成部分,它直接影響整個電力系統(tǒng)的安全與經(jīng)濟(jì)運(yùn)行,是聯(lián)系發(fā)電廠和用戶的中間環(huán)節(jié),起著變換和分配電能的作用。 這次設(shè)計(jì)以 10kv 降壓變電站位置要設(shè)計(jì)對象,分析變電站的原始資料確定變電站的主接線;通過負(fù)荷計(jì)算確定變壓器臺數(shù)、容量及型號。根據(jù)短路電流的計(jì)算結(jié)果,對變電站的一次設(shè)備進(jìn)行了選擇和校驗(yàn)。同時完成配電裝置的布局、防雷保護(hù)及接地裝置方案的設(shè)計(jì)。 關(guān)鍵詞 :變電站電器主接線;短路電流計(jì)算;一次設(shè)備;防雷保護(hù) Abstract Substation is an important part of power system, which directly affects the safety and economic operation of the whole power system, is the intermediate link between power plants and users, plays a role in transformation and distribution of electricity. This is designed to 10kV stepdown substation location to determine the main substation design object, the original data analysis substation。 load calculated by number, transformer capacity and models. According to shortcircuit current calculation results, a device for substation were selected and verified. Design and plete electric equipment layout, lightning protection and grounding device of the scheme. Keywords: substation main electrical wiring。 shortcircuit current calculation。 a lightning protection equipment。 目 錄 Abstract 2 目 錄 3 5 設(shè)計(jì)的背景 5 國內(nèi)外研究綜述 5 2 電氣主接線設(shè)計(jì) 7 電氣主接線的基本形式 7 單母線接線 7 單母線分段接線 8 單母線分段帶旁路母線 8 雙母線接線 9 雙母線分段接線 10 橋型接線 10 電氣主接線的選擇 11 10kv 電氣主接線 11 110kv 電氣主接線 12 3 主變壓器的選擇 14 負(fù)荷計(jì)算 14 主變壓器型式的選擇 14 主變壓器臺數(shù)的選擇 14 主變壓器容量的選擇 15 4 短路電流計(jì)算 16 短路計(jì)算的目的 16 短路計(jì)算過程 16 5 備用電源自動投入裝置 18 備用電源自動投入裝置作用 18 適用情況以及優(yōu)點(diǎn) 18 BZT 的工作過程及要求 19 6 電氣設(shè)備的選擇 21 選擇設(shè)備的一般原則和基本要求 21 假想時間 imat 的確定 22 高壓斷路器的選擇 23 斷路器選擇的具體技術(shù)條件 23 斷路器選擇及校驗(yàn) 24 隔離開關(guān)選擇的具體技術(shù)條件 27 隔離開關(guān)選擇計(jì)算 27 電流互感器選擇 30 電流互感器的選擇技術(shù)條件 30 電流互感器選擇及校驗(yàn) 32 電壓互感器選擇計(jì)算 33 電壓互感器選擇技術(shù)條件 33 電壓互感器選擇 34 10kV 母線的選擇 35 7 主變壓器繼電保護(hù)的整定計(jì)算及配置 37 主變壓器保護(hù)配置 37 主變壓器繼電保護(hù)整定 37 8 防雷接地 41 避雷器的選擇 41 避雷器的配置原則 41 避雷器選擇技術(shù)條件 41 避雷器的選擇和校驗(yàn) 43 防雷和接地設(shè)計(jì)計(jì)算 44 致 謝 48 附 錄 18