【正文】
重慶大學(xué)本科學(xué)生畢業(yè)設(shè)計(論文) 洪林賓館建筑給水排水工程(任務(wù)一) 學(xué) 生:楊勇 學(xué) 號: 20206533 指導(dǎo)教師:劉智萍 專 業(yè):給排水科學(xué)與工程 重慶大學(xué)城市建設(shè)與環(huán)境工程學(xué)院 二 O 一五年六月 Graduation Design (Thesis) of Chongqing University Design of water supply and drainage Engineering of HONG LIN guestjouse ( precondition ) Undergraduate: Yang Yong Supervisor: Prof. Liu Zhi ping Major: Science and Engineering of Water amp。 Wasterwater Faculty of Urban Construction and Environmental Engineering Chongqing University June 2020摘要 I 摘 要 根據(jù)上級有關(guān)部門批準(zhǔn)的設(shè)計任務(wù)書,在重慶市擬建一幢 16 層的 洪林賓館 ,總占地面積 4300m 2 ,建筑面積為 25118m 2 ,建筑高度 。地下 1層,地上16 層。要求完成該建筑的給水排水工程設(shè)計。即室內(nèi)外給水及消防給水工程設(shè)計,室內(nèi)外排水工程,室內(nèi)熱水及開水供應(yīng)。 設(shè)計應(yīng)符合國家現(xiàn)行規(guī)范的規(guī)定 ,主要完成了以下設(shè)計內(nèi)容: ( 1) 冷水系統(tǒng):主要為室內(nèi)、外冷水系統(tǒng)。本建筑給水分區(qū)情況如下:- 1F~3F 為低區(qū),由市政管網(wǎng)直接供水; 4F~ 12F 為 中 區(qū), 13~16F 為高區(qū) , 由 水池、水泵 和高位水箱采用上行下給式直接供水。整個系統(tǒng)的組成包括:引入管、水 表 節(jié)點、給水管網(wǎng),地下生活貯水池、生活水泵、屋頂高位生活水箱等。 ( 2)熱水系統(tǒng) :在 客房區(qū) 區(qū) 4~16F 供給熱水 。 包括配水系統(tǒng)和回水系統(tǒng), ( 3) 消防給水系統(tǒng):包括室內(nèi)外消火栓給水系統(tǒng)和自動噴水滅火系統(tǒng)。室內(nèi)消火栓給水系統(tǒng)的組成包括:水槍、水帶、消火栓、消防卷盤、消防管道、消防貯水池、消防水泵和高位消防水箱。本建筑采用普通濕式自動噴水滅火系統(tǒng),該系統(tǒng)的組成包括:噴頭、濕式報警閥、信號閥、管道系統(tǒng)和供水設(shè)備等。 ( 4) 氣體滅火 系統(tǒng):在配電 間 設(shè)置。 ( 5) 排水系統(tǒng):包括室內(nèi)外生活污、廢水排水系統(tǒng)及雨水排水系統(tǒng)。 因為醫(yī)院排放的污廢水中含有病菌要經(jīng)過集中處理后才能排放到市政排水管網(wǎng),所以采用污廢水合流的排水體制 。該系統(tǒng)由衛(wèi)生器具、檢查口、清掃口、室內(nèi)外排水管道、集水坑、排水泵、檢查井、 污水處理 池等組成。雨水排水系統(tǒng)采用 外 排 水 系統(tǒng)。 關(guān)鍵詞: 門診綜合樓, 給水系統(tǒng),熱水系統(tǒng),消防給水系統(tǒng),排水系統(tǒng) ABSTRACT Ⅱ III ABSTRACT The Ankang City Hospital l which is to be built in Ankang is a Thirteenfloor allround service building. The total land area is 3000 m2 and building area is 23300 m2. The total altitude of the building is building, Thirteenfloor of which is above the ground and one floor under the ground. The Chinese Medicine Hospital Outpatient Building, is outpatient, inpatient, garage and other integrated building.. The water supply and drainage engineering of the building is the subject of our graduation design. And the detailed design are about both the sump and the drainage pump. The survey of the project are as follows: ( 1) Cold water system, mostly including the interior and exterior supply of cool water. The vertical subarea is as follows : the demarcator is the pipeline transfer floor, and 1 to 3 floor are low zones, supplied directly by municipal pipes。 4to 16 floor are high zones, supplied by pond , pumps and perch water tank as a downfeed system. The consist of the total system are: inlet pipe, water meter node, water supply work, underground water reservoir, domestic feed water pump and perch water tank, etc. 1. Cold water system, mostly including the interior and exterior supply of cool ( 2) Hot water system: including water distribution system and the return water system, due to the low of the hot water demand is not large, so only in high area 4 ~ 16F, supply hot water. ( 3) Fire water supply system: including the interior and exterior fire hydrant system and automatic sprinkler system. The interior fire hydrant system is consist of hydraulic giant, water hose, fire plug, fire hose reel, firefighting pipe, fire reservior, fire pump and fire water tank, etc. The design adopts wet automatic sprinkler systems which includes sprinkler head, wet alarm valve, signal valve, pipe system and other water supply facility. ( 4) Gas extinguishing system: fixed in switch board room and diesel generator shelter. ( 5) Drainge system: including interior and exterior drainge system of sewage, waste water and storm water. Inorder to lighten the processing quantity of local sewage treatment structure, the project adopts bined system, After treatment, discharged to municipal sewage pipe. The system contains sanitary ware, drainage pipe, inspection 重慶大學(xué)本科學(xué)生畢業(yè)設(shè)計(論文) IV port, cleanout, interior and exterior sewage pipe sump, drainage pump, inspection, septic tank, etc. Besides, the engineering uses both indoor and outdoor rainwater system. Keywords: Tall Building with Multifunction, Water supply system, Hot water supply system, Water supply system of fire fighting, Drainge system 設(shè)計 資料 V 目 錄 摘 要 ............................................................................................................................ I ABSTRACT ........................................................................................................................ III 引 言 ............................................................................................................................. 11 第一篇 設(shè)計任務(wù)及設(shè)計資料 ................................................................................ 12 ..................................................................................................................... 12 ..................................................................................................................... 12 ..................................................................................................................... 12 設(shè)計資料 ............................................................................................................... 12 建筑設(shè)計資料 ................................................................................................ 12 城市給水排水設(shè)計資料 ................................................................................ 13 主要 設(shè)計 文獻(xiàn) ....................................................................................................... 13 第二篇 設(shè)計說明書 ...................................................................................................... 15 1 . 給水系統(tǒng)設(shè)計 ........................................................................................................... 15 室內(nèi)給水系統(tǒng)的選擇 ........................................................................................... 15 室內(nèi)給水系統(tǒng)供水方式技術(shù)比較 .............................................................. 16 方案比