【正文】
instruction ………………………………………………………………………… 7 Calculation of the getting rid of rate……………… …………………………………… 7 Getting rid of rate of dissolving BOD5………………………………………………… 7 Getting rid of rate of CODcr ………………………………………………………… 7 Getting rid of rate of SS ………………………………………………………………… 8 Getting rid of rate of Total nitroge …………………………………… ………………… 8 Getting rid of rate of Phosphate…………………………………………………… 8 Sewage disposal craft choice in the city………………………………………………… 9 Arrangement of water works39。 general layout…………………………………………… 10 the flow of structures (Second ) ………………………………………… ………… 10 design of disposal structures ………………………………………………………… 11 Grid and pump house …………………………………………………………… 11 sand Sink pool…………………………………………………………………… 12 Sink the pool for the first time……………………………………………………… 13 Detest oxygen pool ……………………………………………………………… 13 Pool with meagre oxygen………………………………………………………… 13 aerobic pond ……………………………………………………………………… 14 Second sedimentation pond……………………………………………………… 14 The designs of the structures ………………………………………………………… 14 Mud pump house………………………………………………………………… 14 The mud concentrates the pool…………………………………………………… 15 The level of sewage factory, high Cheng assigns……………………………………… 15 4 The collocation of the plan……………………………………………………………… 15 The collocation of the pipelines…………………………………………………… 16 The collocation of the altitude ……………………………………………………… 16 3 the book of Design and calculate …………………………………………………………… 17 calculation of the build………………………………………………………………… 17 MidGrid…………………………………………………………………………… 17 sand sedimentation pondv…………………………………………………………… 18 the first clarfying pond……………………………………………………………… 21 anaerobic pond……………………………………………………………………… 22 anoxic pond………………………………………………………………………… 24 the design and calculation of the oxygenate pond ………………………………… 25 the design of clarifying pond………………………………………………………… 25 the measuring weir………………………………………………………… 33 the design of the sludge treatment building……………………………………………… 35 design of the sludge concentrated building……………………………………… 36 the design of the sludge saving tank and the dehydration…………………………… 39 altitude collocation……………………………………………………………………… 40 List of references …………………………………………………………………………… 41 Thanks………………………………………………………………………………………… 42 Appendix……………………………………………………………………………………… 43 5 某市污水處理廠 A/A/O工藝設(shè)計 作者:蔣麗麗,指導(dǎo)教師:孫豐霞 (山東農(nóng)業(yè)大學(xué)資源與環(huán)境學(xué)院) 【 摘要 】 隨著社會進步,人們對于城市污水的處理的要求愈加嚴格。除了基本的去除污水中 BOD和 SS 的要求外,通常還要求脫氮除磷,以保護水體環(huán)境。本設(shè)計即采用了眾多脫氮除磷工藝中較為經(jīng)濟合理的AAO 工藝對進入污水廠的污水進行處理。設(shè)計污水處理廠處理所在城市生活污水,日處理能力 10 萬方,有效去除水中 BOD、 SS 以及氮、磷元素,出水質(zhì)量將達到國家污水綜合排放標準二級標準。本設(shè)計對污水處理廠處理流程、處理構(gòu)筑物、以及高程進行 了初步設(shè)計。 【 關(guān)鍵詞 】 : A2/O ,生物脫氮除磷 ,水污染治理,城市污水 The design of biologicalphosphorus and nitrogen removal with the A2/O process. Author: JiangLili Supervisor: SunFengxia (ShanDong Agriculture University)1 Abstract: With social progress, the demand for people39。s treatment of the municipal sewage is stricter..Except the demands of BOD and SS in the sewage, demand denitrification get rid of the phosphorus yet usually to go besides a basic one, in order to protect the water body environment .W have adopted A2/ O craft to deal with the sewage which enters the sewage factory in this design. This paper Introduces the principles of biological phosphorus and nitrogen removal with the A2/ O process and describes the flow chart of this process which Is then analyzed In detail. Keyword A2/O , biological phosphorus and nitrogen removal, wastewater treatment municipal wastewater 引言 長期以來,城市污水處理均以去除有機物和懸浮物為目的,其工藝為普通活性污泥法.該法對氮、磷等無機營養(yǎng)物去除效果很差.一般來說 *1,氮的去除率只有 20%~ 30%,磷的去除率只有 10%~ 20%.隨著大量的化肥、農(nóng)藥、洗滌劑等高濃度氮、磷工業(yè)廢水的排出,導(dǎo)致城市污水中 N、 P濃度急劇增加,從而引起水體中溶解氧降低及水體 富營養(yǎng)化,同時影響了處理后污水的復(fù)用.所以,要求在城市污水處理過程中不僅要有效地去除 BOD 6 和 SS,而且要有效地脫氮除磷.八十年代以來,生物脫氮除磷工藝已成為現(xiàn)代污水處理的重大課題,特別是以厭氧-缺氧-好氧 *2*3( Anaerobic- Anoxic- aerobic,簡稱 A2/ O工藝)系統(tǒng)的生物脫氮除磷工藝,因其特有的技術(shù)經(jīng)濟優(yōu)勢和環(huán)境效益,越來越受到人們的高度重視。 本設(shè)計中即采用厭氧-缺氧-好氧( Anaerobic- Anoxic- aerobic,即 A2/ O 工藝)對某城市生活污水進行處理,日處理能力 100000方。出水達到 1996年頒布的國家綜合污水排放標準 *4水質(zhì)要求。 1 設(shè)計任務(wù)及設(shè)計資料 設(shè)計任務(wù)與內(nèi)容 該城市污水處理廠的 AAO 工藝流程設(shè)計,對流程進行詳細的工藝計算,水力計算,對工程進行概算,繪制總平面圖、流程高程圖,單體構(gòu)筑物工藝圖。工藝要求對污水進行生物脫氮除磷。 設(shè)計原始資料 城市氣象資料 經(jīng)調(diào)查和咨詢,該城市的氣象資料見表 1: 表 1 污水處理廠所處城市氣象資料 年平均氣溫 12℃ 月平均最高氣溫 25℃ 月平均最低氣溫 4℃ 最高氣溫 36℃ 最低氣溫 45℃ 年平均 降雨量 1000 ㎜ 冰凍線深 300 ㎜ 主風(fēng)向 西南風(fēng) 溫度在 10℃度以下 0 天 相對濕度 70% 7 地質(zhì)資料 污水處理廠處的地下土壤為:亞黏土,平均地下水位在地表以下: 20m 設(shè)計規(guī)模 污水廠的處理水量按最高日最高時流量,污水廠的日處理量為 10 萬方。主要處理城市生活污水以及部分工業(yè)廢水,按生活污水量來取其時變化系數(shù)為 。 進出水水質(zhì) 該水經(jīng)處理以后,水質(zhì)應(yīng)符合國家《污水綜合排放標準》( GB8978- 1996)中的二級標準,由于進水不但含有 BOD5,還含有大量的 N, P 所以不僅要求去 BOD5除還應(yīng)去除不中的 N, P達到排放標準。 進水 PH為 67,總氮為 4445mg/L。其他見表 2: 表 2 污水廠設(shè)計進出水水質(zhì)對照表 單位: mg/L CODcr BOD5 SS NH3- N TP 進水 230370 150250 200350 3545 10 以下 出水 120 30 30 25 城市污水總干管進入污水廠入口處的管徑為 1米,水量 2021毫米,管底埋深 。 該城市地勢為東南方向較高,西北方向較低,城市的排水出路在西北方向,在城市北側(cè)有一條河流為污水的 最終收納水體,污水廠址位于城市西北,河流的南岸,污水廠廠區(qū)地勢平坦,地面標高(黃海高程)為 18米,受納水體洪水位為 17米。 8 設(shè)計說明書 去除率的計算 溶解性 BOD5的去除率 活泩污泥處理系統(tǒng)處理水中的 BOD5值是由殘存的溶解性 BOD5 和非溶解性 BOD5二者組成,而后者主要是以生物污泥的殘屑為主體。活性污泥的凈化功能,是去除溶解性 BOD5。因此從活性污泥的凈化功能來考慮,應(yīng)將非溶解性的 BOD5從處理水的總 BOD5值中減去。 取原污水 BOD5值( S0)為 250mg/L,經(jīng)初次沉淀池及缺氧池 、厭氧段處理,按降低 25%考慮,則進入曝氣池的污水,其 BOD5值( S)為: S? = 250( 125%)= 計算去除率,對此,首先按式 BOD5= 5?( ? Ce ) =? Ce 計算處理水 中的非 溶解性 BOD5值 ,上式中 Ce —— 處理水中懸浮固體濃度,取用綜合排放一級標準 20mg/L。 b微生物自身氧化率,一般介于 ,取 ; X? 活性微生物在處理水中所占比例,取值 得 BOD5= ?? ? 20= 處理水中溶解性 BOD5值為: = 去除率 ? = ?? CODr的去除率: 取入水 CODc為 300mg/L; %60%100003 012021 ????? 9 的去除率: 取入水 SS為 300mg/L %09%100300 30300 ????? : 出水標準中的總氮為 25mg/L,處理水中的總氮設(shè)計值取 25mg/L,入水總氮取 40mg/L,總氮的去除率為: %%10004 2504 ????? 進水中磷酸鹽的濃度為 5mg/L 計。如磷酸鹽以最大可能成 Na3PO4計 *5,則磷的含量為5 =: Na3PO4中 P的含量在可能存在的磷酸鹽(溶解性)中是含量最大的,這樣計算出來的進水水質(zhì)中的磷含量偏大,對整個設(shè)計來說是偏安全的。 磷的去除率為 %% ????? 城市污水處理工藝選擇 處理廠的工藝流程是指在達到所要求處理程度的前提下,污水處理各單元的有機組合;構(gòu)筑物的選型是指處理構(gòu)筑物形式的選擇。兩者是相 互聯(lián)系,互為影響的。 城市生活污水一般