freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

b貧砼結(jié)構(gòu)層施工方案-文庫吧

2025-04-20 23:03 本頁面


【正文】 ulation waterproof measures fail to install protective panels in part with three tarpaulin cover, to prevent insulation from moisture. Insulation seam Michael Jackson 5mm, joints, joints 100mm, insulation thickness tolerance (+10MM~ – 5mm), appropriate material elastic banding, spacing according to the design requirements, rigid insulation soft materials for construction joints tight。 And largediameter vertical pipe for high temperature pipeline in strict accordance with design drawings called for the establishment of expansion joints and holding bracket。 Design requirements into a removable type of insulation, in strict accordance with specifications disconnect from the other insulation。 Surface insulation boards in the technology of plastering construction of woven cloth to prevent pollution and protective panels flush with the surface interface, tight and clean. Site measurement of insulation boards for elbow shape cutting, ensure that each piece of lapped traffic, arc transition of natural, beautiful, screws up. Stampede outside construction personnel is strictly prohibited and shelve objects directly on the outer shield. In order to prevent the pollutionprone heater, channel area of secondary pollution of largediameter pipes and other equipment, weaving cloth, and erection of the separation platform for preservation. Thermal insulation construction, onhook tack welded to the consolidated line, to ensure evenly spaced, and the hook nailed down ... See next page flow chart management process. General requirements for protective product protection一、編制依據(jù)省道205線北川桂溪至江油(北川段)提升改造工程設(shè)計(jì)圖《公路路面基層施工技術(shù)規(guī)范》JTJ 0342000《公路工程技術(shù)標(biāo)準(zhǔn)》JTG B012003《公路水泥砼路面施工技術(shù)規(guī)范》JTG F302003《公路工程質(zhì)量檢驗(yàn)評(píng)定標(biāo)準(zhǔn)》JTJ F80/12004《公路水泥混凝土路面設(shè)計(jì)規(guī)范》JTG D402011二、工程概況 省道205線北川桂溪至江油(北川段)提升改造工程1標(biāo)段起于北川平武交界處檢測(cè)站(K251+458),止于K227+690。K215+458K219+,,限速40km/h。K219++690段維持三級(jí)公路標(biāo)準(zhǔn),,限速30km/h。三、施工組織機(jī)構(gòu)抽調(diào)理論和實(shí)踐經(jīng)驗(yàn)豐富、業(yè)務(wù)能力強(qiáng)、綜合素質(zhì)高的技術(shù)、管理、行政人員及具有豐富施工經(jīng)驗(yàn)的施工隊(duì)伍完成本合同段的施工任務(wù)。按項(xiàng)目法組建本合同段工程管理機(jī)構(gòu),全面負(fù)責(zé)本合同段工程的施工組織管理工作。項(xiàng)目部組織機(jī)構(gòu)圖如下:項(xiàng) 目 經(jīng) 理技 術(shù) 負(fù) 責(zé) 人質(zhì)量負(fù)責(zé) 人安全負(fù)責(zé)人安全員施工員施 工 工 長(zhǎng)施 工 班 組省道205線北川桂溪至江油
點(diǎn)擊復(fù)制文檔內(nèi)容
公司管理相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1