【正文】
Quality management of materials一 質(zhì)量管理 quality management 提供項(xiàng)目施工組織方案,每項(xiàng)分部工程提供專項(xiàng)施工方案。 Provide project construction schedule and branch project construction schedule. 實(shí)行樣板制,分部工程必須先做樣板,施工單位自檢合格后,經(jīng)監(jiān)理、業(yè)主檢查合格方可大面積施工。The contractor should provide sample before construction. The contractor can start construction of large area after the check by contractor, supervisor and client is qualified.施工過程的質(zhì)量施工過程的質(zhì)量控制控制Quality control of construction procedure 隱蔽工程必須進(jìn)行檢測,涉及到要求閉水試驗(yàn)及水壓試驗(yàn)的,要求進(jìn)行完試驗(yàn)后方可隱蔽。The concealed work must be tested. It is necessary to do water test and water pressure test. The work can be concealed after the test is qualified.分部分項(xiàng)工程的驗(yàn)收Acceptance of branch project一 質(zhì)量管理 quality management? 材料樣品展臺(tái)platform for material sample網(wǎng)架球節(jié)點(diǎn)樣品(氣體保護(hù)焊)Framework ball joint sample (gas protection welding )現(xiàn)場手工焊 (經(jīng)探傷檢測)Manual welding on site (pass detection test)一 質(zhì)量管理 quality management 地坪樣板concrete