【正文】
on Handbook for Building Waterproofing (5)《建筑機械適用安全技術規(guī)程》 JGJ3386 Technical Specification for Safe Operation of Construction Machinery, JGJ3386 (6)大連市建委關于建筑施工現(xiàn)場安全管理的文件及規(guī)定 Files and regulations regarding onsite safety management issued by Dalian Municipal Commission of Construction 工程概況 及材料 特色 Project Overview 工程概況 ( 1) 工程名稱:大連 某某 廣場 Project name: Galleria Dalian ( 2) 工程地點: Project site: ( 3) 建設單位: The Employer: GTC (Dalian) Real Estate Development Co., Ltd ( 4) 建筑面積: 320,000 ㎡ Floorage: 320,000 ㎡ 概況說明 ( 1)本項目防水要求: 4 地下室防水等級一級,且需有防海水腐蝕功能,我們采用 3mm 厚 SAR 耐鹽堿型高聚物改性瀝青防水卷材 +4mm 厚 SBS 改性瀝青防水卷材; 隧道防水等級一級,且需有防海水腐蝕功能,我們采用 3mm 厚 SAR 耐鹽堿型高聚物改性瀝青防水卷材 +4mm 厚 SBS 改性瀝青防水卷材; 屋頂花園部分防水要求有耐根穿刺:我們采用 3mm 厚 SBS 改性瀝青 +4mm 厚 SBS改性瀝青聚酯胎化學阻根耐根穿刺防水卷材,達到防水一級; 其它屋面采用防水等級二級,我們采用 3mm 厚 SBS 改性瀝青 +3mm 厚 SBS 改性瀝青防水卷材。 施工準備 Preparations for Commencement 現(xiàn)場準備 Site Preparation ,做好施工用水電的布置,現(xiàn)場安全防護設施的搭建等工作。 Set up the temporary facilities for site production and life as per the site layout. Prepare the water and power, the safety protection facilities for the mencement. ,并做好各項教 育工作, Organize the work force, move into the site and do well educational work and others. 技術準備 Preparations for execution techniques 及時組織技術人員,預算員認真熟悉施工圖紙,參與圖紙會審和技術交底。 Timely anize the technicians and quantity surveyors to get familiar with the drawings. They shall participate in the drawings studying and examining, and explain all the technical details. 編制施工圖預算和月旬作業(yè)計劃,提供材料的需求量計劃。 Work out the project budget and the schedules for monthly ,and also the materials supply plan. 根據(jù)施工圖紙,配備與本工程相關的規(guī)程,規(guī)范及有關圖集, 并分發(fā)給項目經(jīng)理部相關人員,相關人員根據(jù)規(guī)范,圖集和企業(yè)標準,做好各相應的技術交底記錄。 The drawing,regulations,code will be delivered to key personnel for keeping a record of technical clarification. 做好各種進場材料的質(zhì)量檢驗,合格證等準備工作。 Do a good job in checking all those materials to be brought into the site, certificate and 5 other preparatory work 主要施工機具及勞動力資源配置 Preparations for Major Construction equipment and work forces 根據(jù)本工程的施工規(guī)模及結(jié)構形式,為了順利快速地完成本工程,擬投入的施工機具及勞動力 計劃表 詳見 附 表。 As per the project scale and structural formation, in order to smoothly plete the execution, it is proposed to allocate of the following equipments and labor forces as the form listed below. 勞動力資源配備 Labor Forces ( 1)集結(jié)精干的施工隊伍,組織好勞動力進場,根據(jù)機構特點,建設單位工期要求及我公司項目部承諾條件,結(jié)合本工程的施工情況,合理組織一支強有力的施工隊伍進場。 The most capable construction units shall be selected for selection shall consider the local condition,the construction program and the promises we have made. ( 2)落實各級人員的崗位責任制 Hold alllevel personnel responsible to their own jobs. ( 3)做好勞動力的入場教育培訓,搞好全員的各項交底工作。 Make sure the site workers shall receive appropriate trainings and various clarifications be made in due time. 項目組織管理機構 The Project Administration Organization 項目管理組織機構的組建 The setup of the Project AdministrationOrganization 為了提高工程質(zhì)量,加速施工進度及加強施工現(xiàn)場的管理,并能科學地安排施工進度,組織和保證各類物資及時供 應,做好各種協(xié)調(diào)工作,我公司高度重視本工程,委派具有豐富現(xiàn)場管理經(jīng)驗的負責人組建成項目經(jīng)理部,項目經(jīng)理部建立崗位責任制 ,明確分工職責 ,落實施工責任 ,各崗位各行其職。 In order to improve the project quality, speed up the project progress, strengthen the site management, scientifically arrange the site production, anize and guarantee timely supple of the various materials and do a good job in coordination work, this pany extremely stresses the Project and accredits the pany staff with rich site management and construction experiences to set up the Project Management。 establishes the postresponsibility 6 system in the project management so as to enable everyone to do his job well. 項目管理網(wǎng)絡 The Network of the Project Management ( 1)施工現(xiàn)場項目組織機構網(wǎng)絡圖 The Network of the Project Management and the Site Organization 項 項 項 項P r o j e c t m a n a g e r 生 產(chǎn) 經(jīng) 理P r o d u c t m a n a g e r 項 項 項 項 項A s s i s t a n t p r o j e c t m a n a g e r 項 項 項Q u a l i t y i n s p e c t i o n項 項 項T e c h n i c a l l e a d e r項 項 項B u i l d e r 項 項 項S e c u r i t y c l e r k預 算 員A c c o u n t i n g c l e r k 項 項 項F i l e k e e p e r項 項 項M a t e r i a l c l e r k 施工工藝流程方案 Technical Flow Chart 地下室、隧道施工工藝 本工程地下室、隧道底板、地下室外墻防水為 3mm 厚 SAR 耐鹽堿型高聚物改性瀝青防水卷材 +4mm 厚 SBS 改性瀝青防水卷材。 地下室底板防水施工 (1)工藝流程 基層清 理 ——驗收 ——涂刷冷底子油 ——鋪貼附加層 ——平鋪卷材(第一層) ——熱熔封邊 ——驗收 ——交叉平鋪卷材(第二層) ——熱熔封邊 ——驗收 . (2) 基層清理 涂刷冷底子油前,前仔細將基層表面的垃圾、塵土等清除干凈,必要時可采用噴燈局部噴烤,但噴烤時間不宜過長,防止爆裂、起砂。報監(jiān)理驗收合格后,進行下一道工序。 (3)涂刷基層處理劑 基層含水率不超過 9%,(檢驗含水率簡便方法:剪一塊 200 200 見方的卷材平鋪于基層表面,壓緊,保持 2h,然后揭開卷材觀察其下方基層面,如有明顯的水珠,則表7 明含水率過大,不宜施工,如僅 有潮氣則可滿足施工條件)在基層表面滿刷一道冷底子油,涂刷要均勻、不透底、遮蓋率 100%。 (4)鋪貼附加層 外墻管根、陰陽角部位加鋪一層同質(zhì)卷材附加層,將卷材裁成相應的形狀進行熱熔滿貼,寬度 50cm。附加層施工必須粘貼牢固,施工要細心。項目質(zhì)檢員對此部位專門做隱蔽工程檢查。 (5)確定鋪貼方向、彈基準線冷底子油涂刷完畢 6h 后,手摸感覺不黏即可根據(jù)卷材的寬度和搭接的規(guī)定,在冷底子油上進行彈線。 按照卷材鋪貼的一般原則:彈線由排水較集中的部位開始,遵照由低到高、先平面后立面的順序彈基準線。針對現(xiàn)場實際,彈線由 電梯基坑、集水坑開始;彈線方向為南北方向,同時,根據(jù)選用卷材幅寬及長邊搭接長度要求,確定彈線間距。 (6)做樣板 在大面積鋪貼施工前,施工隊要按照技術要求及細部做法做 100m2 樣板,經(jīng)項目驗收合格后,進行大面積施工。 (7)大面積鋪貼卷材鋪貼方向:南北方向。鋪貼順序:由電梯基坑、集水坑開始,向各方向順序鋪貼。卷材鋪帖時要減少陰陽角和大面積的接頭,卷材根據(jù)墻面尺寸配制,從邊沿開始,彈出標準線。 將改性瀝青防水卷材按鋪貼長度和彈線尺寸裁剪并卷好備用,操作時將已卷好的卷材,用 1500mm 長φ 30 的管穿入卷心 ,卷材端頭比齊開始鋪的起點,按照彈好的線,手扶管心兩端向前緩緩滾動向前鋪設,使卷材平鋪于基層上,要求用力均勻、不窩氣,掌握好鋪設壓邊寬度。 然后點燃汽油噴燈,掀開卷材,加熱基層與卷材交接處,噴燈與加熱面保持 300mm 左右的距離,往返噴烤,觀察當卷材的瀝青剛剛?cè)刍瘯r,壓合至邊緣擠出瀝青粘牢。 對平面與立面相連的卷材,先鋪貼平面,然后由下向上滿粘,并使卷材緊貼陰、陽角。在永久保護墻上滿貼卷材,粘貼牢固,防水卷材甩頭上砌兩皮磚臨時保護。 (8)四周甩槎的卷材貼于保護墻上,保護墻 600mm 高度以上不刷基層處 理劑,刷脫模劑,卷材上部臨時收頭用低強度等級砂漿壓住,以免墜落,同時起保護作用。 8 (9)卷材施工完畢后,報監(jiān)理驗收,合格后方可進行下道工序。 (10)立面防水卷材施工 地下室結(jié)構施工完畢并經(jīng)驗收合格后,開始進行地下室外墻防水施工。外墻防水層施工時,先從外墻 高度起鋪貼第一層卷材,再往上錯開 500mm 開始鋪貼第二層防水。待立面防水施工完,再按照搭接長度、搭接錯開要求等鋪貼底板甩出卷材至墻面高 范圍的防水卷材。地下室結(jié)構施工完畢后,將墻面凹凸不平、錯臺部位打磨平整,局部平整度較差采取刮水泥 膩子找平,陽角犬牙狀突起打磨光滑,把墻面浮漿、灰塵等清理干凈。 基層處理及檢查:將外墻上氣泡用水泥膩子刮平,同時將墻面粘連的砂漿、突出物用小鏟鏟除,使外墻面達到規(guī)范規(guī)定的防水基層要求(基層要求同底板部分)。 拆除臨時保護墻,并將卷材甩槎整理好,對于受損的部位必須先行修理。將冷底子油攪拌均勻后,均勻涂布在干凈的基層上,不得漏涂和出現(xiàn)透底現(xiàn)象,干燥 6h,手感不黏時方可進行下道工序。 管根、陰陽角