【正文】
exit of HangJinQu expressway. It is near the cross of two main city roads and the Qujiang bridge which connects with the old city. The project is at the planed financial business area in west district, separated by a road with 780mu Xinhu residential quarter. The project has exceptional advantages in geography, munication and popularity. Process of project The project has finished plan and takeover of land. Infrastructure has formed a perfect set. Documents available West an area issue of plan general layout, uses the red graph and so on. Contact Department Quzhou West District Administration Committee Investment Office. Contact Zhou Weiying , Zheng Yongmei Telephone 05703047212 Fax 05703017005 Address West of Baiyun Quarter, West District, Quzhou Postcode 324000 Email 衢州市對外招商合作項目 項目名稱 黃衢南高速公路衢州方 20%項目資本金出資額轉讓 項目 合作方式 出資額轉讓 所屬行業(yè) 基礎設施 投資總額 (萬美元) 7538 項目規(guī)模 和內容 該高速公路項目資本金為 ,其中浙江省交通投資集團有限公司出資 ,占 30%;浙江杭金衢高速公路有限公司出資 ,占 50%;衢州市交通投資有限責任公司出資 ,占 20%,已出資2020萬元。經(jīng)商議將黃衢南高速公路衢州方 20%項目資本金出資額對外進行轉讓。 投資概算及 效益分析 ⑴黃山至衢州段 財務內部收益率 %,大于財務基準折現(xiàn)率 %,投資回收期 19年,小于營運期(高速公路一般營運期為 25年)。⑵衢州至南平段財務內部收益率 %,大于財務基準折現(xiàn)率 %。投資回收期 年。 項目背景、建設條件、區(qū)位優(yōu)勢 及 項目單位概況 黃衢南高速公路(浙江段)起自皖浙交界開化縣西坑口,經(jīng)開化、常山、柯城、江山市,終于浙閩省界沙排,全長約 160 公里,按四車道高速公路標準設計,以滬瑞干線為界分成黃衢段和衢南段,衢南段設計速度為100 公里 /小時、衢黃段 80 公里 /小時,路基寬度分別為 26 米、 米,總投資約 91億元。黃衢南高速公路已于 2020 年 10 月 28 日動工建設。到目前為止,衢南段主線征遷工作已基本完成,土地已交付施工,到目前為止完成工程投資 68000萬元;衢黃段征遷工作已經(jīng)啟動。 項目進展 情況 已經(jīng)開工建設 項目可供資料 全套資料 聯(lián)系單位 衢州市交通投資有限責任公司 聯(lián)系人 姜建明 垂詢電話 0570- 3085935 傳 真 05703085973 地 址 衢州市荷花四路 296 號 郵 編 324000 電子信箱 Project For International Economic And Technological Cooperation Project Title HuangQuNan Expressway 20% Quzhou Investment Transference Project Cooperation Mode Investment Transference Industry Infrastructure Total Investment USD mil Project Scale And Content Project capital is RMB billion yuan, involving RMB billion yuan invested by Zhejiang Traffic Investment Group, 30%。 RMB billion yuan invested by Zhejiang HangJinQu Expressway Co., Ltd., 50% and RMB billion yuan invested by Quzhou Traffic Investment Co., Ltd., 20%. Quzhou Traffic Investment Co., Ltd. has invested RMB billion yuan. The investment of Quzhou, 20% of total investment will transfer to outside after negotiation with the other two panies. Estimated Investment and Profit Analysis (1) Huangshan to Quzhou part: Financial internal rate of return is %, greater than financial standard discount rate %. Recovery period of investment is 19 years, smaller than operational period (general operational period of expressway is 25 years). (2) Quzhou to Nanping part: Financial internal rate of return is %, greater than financial standard discount rate %. Recovery period of investment is years. Project Background And Constructtion Conditions, Location And Institution Profile of Project Unit HuangQuNan Expressway (Zhejiang part) is an important part of national expressway of Beijing to Taibei expressway. Total length is 160 km. It is planed according to four driveways expressway standard and separated for HuangQu part and QuNan part by HuRui line. Total investment is RMB billion yuan. HuangQuNan Expressway was conducted on Oct 28, 2020. Till now, assessable land work of QuNan main line has been almost finished. The land has been to construct. The construction investment is BMB 680 million yuan. Assessable land work of QuHuang part has been started. Process of project Have been to construction Documents available Complete materials Contact Department Quzhou transportation investment limited liability pany Contact Jiang JingMing Telephone 0570- 3085935 Fax 05703085973 Address , Hehua Four Road, QuZhou City Postcode 324000 Email 衢州市對外招商合作項目 項目名稱 衢州市城東污水處理廠工 程 合作方式 BOT 方式特許經(jīng) 營 所屬行業(yè) 基礎設施 投資總額 (萬美元) 2570 項目規(guī)模 和內容 工程規(guī)模:設計工程規(guī)模 萬 m3/d;近期工程規(guī)模 萬 m3/d。 近期工程量包括提升泵站十座,總占地 ;污水輸送總管,管徑 dn1400 一根,管道長度 ; dn1500 一根,管道長度 ;污水處理廠一座,近期規(guī)模 萬 m3/d,占地 ,總占地 18ha。排放口一座 ,工程規(guī)模 萬m3/d。 投資概算及 效益分析 資金估算:按污水處理廠工程的工程量,總投資估算 為 45146 萬元,其中近期工程總投資為 20202 萬元;遠期工程增加投資為 25104 萬元。近期工程包括:工程費用 12426 萬元 ,其中收集系統(tǒng) 4016 萬元,污水廠 8410 萬元。其他費用為 7616 萬元。 項目背景、建設條件、區(qū)位優(yōu)勢 及 項目單位概況 衢州市城東污水處理廠業(yè)主為衢州市自來水總公司,屬城市公用事業(yè)性企業(yè),資產(chǎn)總額 4 億余元,是目前衢州市區(qū)唯一的供水企業(yè),現(xiàn)擁有二座水廠 , 總供水規(guī)模為 19 萬噸 /日,一座規(guī)模 5 萬噸 /日的污水處理廠?,F(xiàn)有員工190 余人,各類專業(yè)技術人員 80 余人。 1999 年通過 IS09001 質量保證體系認證 ,承擔著衢州市區(qū)約 25 萬人口的生活、生產(chǎn)用水,供水普及率為 100%。衢州市自來水總公司還承擔衢州市污水處理工程項目的建設以及運行維護和管理。 項目進展 情況 準備開工建設 項目可供資料 項目可研報告 聯(lián)系單位 浙江省衢州市自來水總公司 聯(lián)系人 向小民 垂詢電話 05708020205 05708020208 傳 真 05708020208 地 址 浙江省衢州市斗潭路一號 郵 編 324000 電子信箱 Project For International Economic And Technological Cooperation Project Title The Engineering of Quzhou City Wastewater Treatment Factory Cooperation Mode BOT Industry Infrastructure Total Investment USD mil Project Scale And Content Engineering scale: Design engineering scale 200,000 m3/d。 In the near future engineering scale 50,000 m3/d. The amount of engineering includes 10 stand to promote a pump in the near future, total cover has。 Dirty water transports manager, taking care of path dn is 1400, piping length is km。 The dn is 1500, piping length is km。 There is one wastewater treatment factory, in the near future scale is 50,000 m3/d, cover ha, total cover is 18 ha. Exhaust is one, engineering scale is 200,000 m3/d. Estimated Investment and Profit Analysis The funds estimates: According to the engineering quantity of the wastewater treatment factory engineering, the total investment estimates is 451,460,000 yuan, among them, the engineering total invests is 200,420,000 yuan in the near future。 The longterm engineering increases the investment as 251,040,000 yuan. The engineering in the near future includes: The