【正文】
院測(cè)設(shè)計(jì)院設(shè)計(jì),新疆電建公司施工安裝。廠房布置在距瑪納斯河西兩公里處,鍋爐廠房和汽機(jī)廠房安裝有武漢鍋爐廠生產(chǎn)的(型號(hào))WG410/ 二期 WG410/ 和北京重型汽輪機(jī)廠生產(chǎn)的 高壓汽輪機(jī)共六臺(tái),單機(jī)容量 100MW。位于北疆煤炭資源豐富的中心。關(guān)鍵詞: 負(fù)荷分配 ; 數(shù)據(jù)開采 ; 優(yōu)化運(yùn)行 ABSTRACTThe subject in order to optimize the power plant load distribution and optimal operation of circulating water system set up the mathematical model, optimization selection algorithm, running through the analysis of data, research equipment performance characteristics. The development of analytical running data capacity to optimize decision support software to run the main line to start.Initially on the plant in accordance with scheduling load curve Optimize distribution mathematical models and realtime mathematical model of load distribution, using dynamic programming method to find the results。因此研究了采用機(jī)組實(shí)際運(yùn)行數(shù)據(jù)分析獲得的方法,采用加權(quán)平均方法從數(shù)據(jù)庫(kù)大量記錄中提取性能數(shù)據(jù)。根據(jù)數(shù)學(xué)模型,對(duì)一臺(tái) 100MW級(jí)機(jī)組循環(huán)水系統(tǒng)進(jìn)行了優(yōu)化計(jì)算,得出的操作建議與原來(lái)操作進(jìn)行了比較,能產(chǎn)生較好的經(jīng)濟(jì)效益。論文作者簽名: 張 翔 年 月 日摘 要課題以電廠負(fù)荷優(yōu)化分配和循環(huán)水系統(tǒng)優(yōu)化運(yùn)行數(shù)學(xué)模型的建立、優(yōu)化算法的選擇、基于運(yùn)行數(shù)據(jù)分析設(shè)備性能特性的研究、開發(fā)具有分析運(yùn)行數(shù)據(jù)能力的優(yōu)化運(yùn)行決策支持軟件為主線展開。除在保密期內(nèi)的保密論文外,允許論文被查閱和借閱。論文作者簽名: 張 翔 年 月 日學(xué)位論文使用授權(quán)說(shuō)明:和海大學(xué)、中國(guó)科學(xué)技術(shù)信息研究所、國(guó)家圖書館、中國(guó)學(xué)術(shù)期刊(光盤版)電子雜志社有權(quán)保留本人所送交學(xué)位論文的復(fù)印件或電子文檔,可以采用影印、縮印或其他復(fù)制手段保存論文。與我一同工作的同事對(duì)本研究所做的任何貢獻(xiàn)均在論文中作了明確的說(shuō)明并表示謝意。學(xué)號(hào): 分類號(hào): TH3 密級(jí): 無(wú) U D C: 621 工程碩士專業(yè)學(xué)位論文XXXX指導(dǎo)教師姓名:趙占西 教授 河海大學(xué)機(jī)電工程學(xué)院 單 位 導(dǎo) 師: 潘學(xué)強(qiáng) 高級(jí)工程師 新疆天山電力股份有限公司 申請(qǐng)學(xué)位級(jí)別: 工程碩士 學(xué) 科 領(lǐng) 域 質(zhì)量工程 論文提交日期:2022 年 6 月 15 日 論文答辯日期:2022 年 03 月 日學(xué)位授予單位和日期: 河 海 大 學(xué) 答辯委員會(huì)主席: 趙占西 論文評(píng)閱人: 趙占西 2022 年 03 月 日 中 國(guó) 南 京火力發(fā)電廠負(fù)荷優(yōu)化分配和循環(huán)水系統(tǒng)優(yōu)化運(yùn)行的研究 張翔 河 海 大 學(xué)分類號(hào)(中圖法) TH3 UDC(DDC) 621 密級(jí) 無(wú) .論文作者姓名 XXXX 學(xué)號(hào) 單位 河 海 大 學(xué) .論文中文題名:火力發(fā)電廠負(fù)荷優(yōu)化分配和循環(huán)水系統(tǒng)優(yōu)化運(yùn)行的研究 論文中文副題名: 無(wú) 論文英文題名:Research on The Coalfired Power Plant Load Allocation and Circulating System Optimization Operation論文英文副題名 無(wú) 論文語(yǔ)種 漢 語(yǔ) 論文摘要語(yǔ)種 漢、英 論文頁(yè)數(shù) 44 論文字?jǐn)?shù) (萬(wàn))論文主題詞 負(fù)荷分配 、 數(shù)據(jù)開采 、 優(yōu)化運(yùn)行 申請(qǐng)學(xué)位級(jí)別 工程碩士 學(xué) 科 領(lǐng) 域 質(zhì)量工程 研 究 方 向 動(dòng)力工程及工程熱物理 指導(dǎo)教師姓名 趙 占 西 單 位 導(dǎo) 師 潘學(xué)強(qiáng) 高級(jí)工程師 論文答辯日期 2022 年 03 月 日 學(xué)位論文獨(dú)創(chuàng)說(shuō)明:本人所呈交的學(xué)位論文是我個(gè)人在導(dǎo)師知道下進(jìn)行的研究工作及取得的研究成果。盡我所知,出了文中特別加以標(biāo)注和致謝的地方外,論文中不包含其他人已經(jīng)發(fā)表或撰寫過的研究成果。如不實(shí),本人負(fù)全部責(zé)任。本人電子文檔的內(nèi)容和紙質(zhì)論文的內(nèi)容相一致。論文全部或部分內(nèi)容的公布(包括刊登)授權(quán)和海大學(xué)研究生院辦理。首先研究了電廠根據(jù)調(diào)度負(fù)荷曲線優(yōu)化分配數(shù)學(xué)模型和實(shí)時(shí)負(fù)荷分配的數(shù)學(xué)模型,采用動(dòng)態(tài)規(guī)劃法求解;以及循環(huán)水系統(tǒng)優(yōu)化運(yùn)行的數(shù)學(xué)模型,采用直接枚舉法求解。對(duì)一 100MW機(jī)組的優(yōu)化計(jì)算結(jié)果與實(shí)際運(yùn)行數(shù)據(jù)比較,發(fā)現(xiàn)由于設(shè)備性能的改變使得原先的優(yōu)化結(jié)果變得并非最優(yōu),得出基于設(shè)計(jì)曲線和試驗(yàn)方式等獲得設(shè)備性能的優(yōu)化計(jì)算結(jié)果會(huì)隨著設(shè)備性能變化而出現(xiàn)與實(shí)際最優(yōu)不符的情況?!√貏e在循環(huán)水系統(tǒng)性能數(shù)據(jù)獲得方面,將凝汽器、管路、循環(huán)泵綜合在一起考慮,這種類似試驗(yàn)的方法,考察它們整體的輸入輸出特性,簡(jiǎn)化了問題。 and optimal operation of circulating water system mathematical model, using the direct enumeration method to find the results.According to mathematical model of a 300MW generating units circulating water system is optimized calculation, the operation of the proposed operation to pare with the original, can produce better economic benefits.Optimization of a 300MW unit calculation results with the actual operation data pared because of changes in equipment performance, the original optimization results are not optimal. Draw a conclusion, using the design curve and experimental methods to obtain the optimal device performance results, along with changes in equipment performance does not conform to the actual optimal situation. Therefore, the study using analysis of actual operating data to obtain conclusions methods, using the weighted average method, a large number of performance data records from the database to extract. Particularly in the circulating water system performance data access, General consider Condenser, piping, circulation pump. This analysis method is similar to test, inspection of their overall inputoutput characteristics, simplifies the problem.Key words: loadappointment , dataming , operation optimization河海大學(xué)工程碩士專業(yè)學(xué)位論文1目 錄緒 論 .................................................................................................................................................21 課題的背景和意義 ................................................................................................................22 本文研究課題的主要目的 ....................................................................................................33 實(shí)現(xiàn) 經(jīng)濟(jì)運(yùn)行方法 ................................................................................................................44 設(shè)備性能特性的獲取方法 ....................................................................................................45 論文的主要內(nèi)容 ....................................................................................................................6第一章 負(fù) 荷 分 配 優(yōu) 化 ...............................................................................................................7 優(yōu)化分配負(fù)荷模型及考慮因素 .............................................................................................7 優(yōu)化分配數(shù)學(xué)模型的約束條件 .............................................................................................8 條件比較 ...............................................................................................................................10 結(jié)論 .......................................................................................................................................11第二章 考慮安全方面機(jī)組優(yōu)化負(fù)荷分配 .......................................................................................12 負(fù)荷響應(yīng)速率約束 ...............................................................................................................12 尋優(yōu)算法分析和選擇 ...........................