【正文】
could not spend a gr eat deal of m anpower cost o post hr ee steps, f ive steps and a whist le. As we all know, under t he cur ent f orm of hum an r esources costs m uch igher t han t he cost of all scientif ic and t echnological input . I n or der t o bett er achieve t he goal of planner s, as well as f or Active solid bor der defense wor k. We r em end t hat you se inf rared r adiation or linkage of electr onic f ences wit h video securit y deployment t o achieve securit y goals. 1. 3 in accordance wit h t he device on t he wall of t he pound pr operties and parameters t o a r easonable plan t o install t he inf rared r adiat ion equipm ent or f ences and electr onic equipm ent as well as video surveilance equipm ent, t he specif ic needs of t he equipm ent and m aterials quant ites we wil det ail at er. 1. 4 t he pr ogr amme according t o your pany39。s sit e t o see and list en t o t he leadership pr oposal, and in accordance wit h t he act ual needs of t he pr oject , wit h r ef er ence t o t he r elevant int ernat ional st andards and nat ional st andards, bined wit h t he experience accum ulat ed by t he pany engaged in m ult iple pr oj ects, pr epare t he t echnol gy package. I f t he cont ents or any other aspect of t he pr ogr amm e has not detailed wher e we wele your valuable m ents. Second, t he design principles of t he pr oj ect design f olows t echnology advanced, f unctional, st able and cost saving principles. And considering const ruct ion, m aint enance and oper at ion, and f or f utur e developm ent , expansion, r econst r uction and ot her f act ors leave r oom f or expansion. Design elements of t he syst em is t he systematic, int egr ated and pr ehensive。 while, system of inst alat ion debugging, and sof t war e pr ogr amming and operation using and should simple, easy m aster, f or China condit ions and t his pr oj ect of eatures. Set t he num ber of advanced t echnol gy in a t he systems, r ef lect s t he cur rent level of t he lat est developm ent of put er and wor k t echnol gy, adapt ed t o t he r equir ement s of t he t imes. While t he system is t he syst em used f or various m anagem ent levels, it s f unct ions ar e configured t o pr ovide t he user wit h f or table, safe, f ast and convenient o 3. 1, t he int elligent building design standards (GB/t 503142020) , t he design st andar d for intelligent building syst ems engineering (DB32/1911998) 3. 3, the code f or engineering design of gener ic cabling syst em f or cit y r esidential buildings ( CECS/1192020) 3. 4, code f or design of buildings and cam pus cable system s engineering ( GB/T50311 2020) , t he code f or electr ical design of civil buildings ( JGJ/ T16 92) 3. 6, t he code f or civil closed cir cuit m onit or ing TV syst em engineer ing t echnol gy ( GB/50198 94) 3. 7, t he t ypes of syst em ear t hing and safety t echnical r equir em ents ( GB1405093) , of t he securit y engineer ing pr ocedur es and r equir em ent s ( GA/T75 94) 3. 9, t he r ules of secur it y engineering accept ance ( GA/T308 2020) , t he indust rial design of TV system code ( GBJ 115) 3. 11, t he Securit y checks pr evention system pass f or graphics s ymbol ( GA/74 94) 3. 12, and fir e linkage contr ol equipment Gener al t echnology condit ions ( GB 16806 1997) f our, and syst em f unction and f eatur es in syst em bot h advanced, and pr actical, and m at ur e, and r eliable, and o syst em open, and can ext ended sex good, both investm ent r easonable, and benefit s best of pur pose, bor der secur it y alarm system on sit e equipm ent f or concent rat ed monit or ed, and contr ol and m anagement , m akes t hese quipment t o secur it y, and r eliable, and eff icient t o r un, M axim ize int elligent m anagement r ole t o cr eate a saf e, healt hy, f or table and pleasant , and t o im prove t he ef ficiency of a good envir onment and save ener gy, and r educe maint enance per sonnel. According t o t he pr oj ect39。s act ual sit uat ion and f uture developm ent r ends, bor der securit y alarm system s f or t he pr oject design. . pr inciple of syst em and bur glar alarm syst em f r om det ect or s, r egional dir ect or s, and t he alarm cont rol cent re posed of t hree par ts. I ts principles as in t he f olowing char t: det ect or s f or burglar alarm system is inside and outside t he building in key ar eas, im port ant places, prot ection, when t he probe t o ilegal invader s, t he signal t r ansmit t ed t o t he alarm contr ol: sound and light alarm, display addr ess, about he per son on dut y af ter r eceiving t he alarm, t ake m easur es according t o t he sit uation, t o contr ol t he developm ent of t he sit uation. Ant i thef t alarm system alarm f unction in addit ion t o t he above, t here is linkage f unction. Such as: open t he alar m light (including inf r ar ed lam p) , int eract ive audio and video m atrix contr oler , swit ch on t he alarm cam er a on t he spot , m at rix cont r oler TV series of contr ol: m onit or displays an im age, video f ot age, m ultim edia contr oler autom atic or human . . 8. 1 t he t hr ee guar ant ees period warr ant y 1, warr ant y 1) service period f r om dat e of accept ance of engineering, a1 year war ranty, warr ant y pr ocessing is plet ed wit hin t he r esponse t im e is 48 hour s. 2) service wit