freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

外文翻譯--工業(yè)控制系統(tǒng)和協(xié)同控制系統(tǒng)-其他專業(yè)-展示頁

2025-01-31 10:07本頁面
  

【正文】 puting power for temperature conversions came from a Motorola MVME 167 CPU and the field bus adapter to the in house SEDAC field bus was running on an additional MVME 162. The operating system was VxWorks and the application was the EPICS toolkit. Since this implementation was successful it was also implemented for the utility controls which were looking for a generic solution to supervise their distributed PLC’s. A slection of process control systems at desy DCS (D/3) As a result of a market survey the D/3 system from GSE was selected for the HERA cryogenic plant. The decision was fortunate because of the DCS character of the D/3. The possibility to expand the system on the display and on the I/O side helped to solve the increasing control demands for HERA. The limiting factor for the size of the system is not the total number of I/O but the traffic on the munication work. This traffic is determined by the total amount of archived data not by the data configured in the alarm system. The technical background of this limitation is the fact that archived data are polled from the display servers whereas the alarms are pushed to configured destinations like alarmfiles, (printer) queues or displays. SCADA Systems with DCS Features (Cube) The fact that the D/3 system mentioned above had some hard coded limitations with respect to the Y2K problem was forcing us to look for an upgrade or a replacement of the existing system. As a result of a call for tender the pany Orsi with their product Cube came into play [2]. The project included a plete replacement of the installed functionality. This included the D/3 as well as the integration of the DESY field bus SEDAC and the temperature conversion in VME. The project started promising. But soon technical and anizational problems were pushing the schedule to it’s limits which were determined by the HERA shutdown scheduled at that time. The final acceptance test at the vendors site showed dramatic performance problems. Two factors could be identified as the cause of these problems. The first one was related to the under estimated CPU load of the 北京化工大學(xué)北方學(xué)院畢業(yè)設(shè)計(論文) —— 外文文獻(xiàn)原稿和譯文 3 6th grade polynomial temperature conversion running at 1 Hz. The second one was the additional CPU load caused by the plex functionality of the existing D/3 system. Here it was underestimated that each digital and analog input and output channel had it’s own alarm limits in the D/3 system. In a SCADA like system as Cube the base functionality of a channel is to read the value and make it available to the system. Any additional functionality must be added. Last not least the load on the work for polling all the alarm limits – typically for a SCADA system – was also driving the work to it’s limits. Finally the contract with Orsi was cancelled and an upgrade of the D/3 system was the only possible solution. It was finally carried out in march 2021. In any case it sho
點擊復(fù)制文檔內(nèi)容
環(huán)評公示相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1