freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

鐵路隧道工程施工承包合同(中英文)-展示頁(yè)

2025-04-05 03:43本頁(yè)面
  

【正文】 nduct selfstrict exam before the inspection by party A’s quality inspector.乙方每進(jìn)行一道工序施工前,必須及時(shí)通知甲方,對(duì)上道工序完成工程量的確認(rèn)。Party B should, in strict conformity with party A’s technical direction and existing railway acceptance standard / norm, carry out execution hereof. The project contracted by party B should satisfy to the acceptance standard which are stipulated by state or industry.凡因乙方原因造成的施工質(zhì)量不合格的工程,乙方應(yīng)在規(guī)定的時(shí)間內(nèi)無(wú)償進(jìn)行返工,如果返工后仍達(dá)不到驗(yàn)收標(biāo)準(zhǔn)的,甲方有權(quán)委派其它單位或個(gè)人進(jìn)行整修,費(fèi)用由乙方承擔(dān)。Unit price of subproject refer to Appendix One BILL OF QUANTITY on which the settlement quantity will be calculated on the qualified quantity pleted actually by party B. Party B will, in accordance with party A’s execution drawings and subject to the unit price, viz. Project’s List and Quantity List, make pletion of any and all items of tunnel construction including execution, pletion and defect’s repair.六、工程質(zhì)量標(biāo)準(zhǔn)與驗(yàn)收 Project Quality Standards and Acceptance乙方必須嚴(yán)格按照甲方技術(shù)交底、現(xiàn)行鐵路驗(yàn)收標(biāo)準(zhǔn)和鐵路施工規(guī)范組織施工。Party B should, pursuant to the technical direction by party A’s technical personnel, carry out execution. The quantity is the same which are actual pletion by party B in accordance with party A’s technical direction. The settlement of quantity of party B’s pletion should, prior to being deemed as the basis of the acceptance and cost calculation, be determined by the check and confirmation of party A’s engineers of technician and quality in addition to the exam / approval of project’s general engineer.五、 承包工程造價(jià) Project Cost各分項(xiàng)工程承包單價(jià)為:見(jiàn)附件一《工程量清單》, 結(jié)算工程數(shù)量根據(jù)實(shí)際完成的合格工程量計(jì)量。工程量以乙方按照甲方技術(shù)交底完成的實(shí)際施工數(shù)量為依據(jù)。 quantity of drainage ditch and cable trough are calculated under the design size in drawings and unit price in appendix list。Tunnel excavation quantity is calculated pursuant to excavated section in tunnel design。Commencement date is , pletion date is . 四、 工程數(shù)量的核實(shí)和確認(rèn) Check and Confirmation of Work Quantity乙方向甲方施工技術(shù)人員提交已完工程量計(jì)算單或簽證,以便甲方對(duì)乙方進(jìn)行驗(yàn)工計(jì)價(jià)。Mortar anchor, hollow grouting anchor.B、超前小導(dǎo)管鋼管加工制作、運(yùn)輸、腳手架、鉆孔、頂管等全部制安過(guò)程;Advanced small pipe pipe manufacture, transport, scaffolding, drilling, pipe, jacking and all other process of manufacture and installation.襯砌,包括正洞襯砌、仰拱及其鋼筋、仰拱填充、鋪底、大小避車(chē)洞襯砌。具體內(nèi)容包括:臨時(shí)設(shè)施建設(shè)、腳手架,測(cè)量,人工挖除整修,鉆眼、爆破、通風(fēng)、出碴、運(yùn)料、照明,管線及排水,木支撐制作、安裝、拆卸,整修邊溝,超挖回填等為完成隧道開(kāi)挖所需的一切工序施工、完成和缺陷修復(fù)工作(棄碴運(yùn)距從出碴洞口算起1 公里、棄碴場(chǎng)用地由甲方負(fù)責(zé))。Project Name : Tunnel No. One㈡、工程地點(diǎn):DK 094+506 至DK095 +658; Project Place:㈢、工程規(guī)模:隧道總長(zhǎng)1152m 。WHEREAS: Party B being the professional pany of tunnel construction with corresponding engineering qualification and capacity has won bidding and been awarded the project hereof.NOW THEREFORE, Party, in accordance with the necessity of construction, consign the works of Tunnel No. 1 to party B for execution, including blasting excavation, tunnel portal construction, drainage facilities, bolting and shotcrete lining, lining, channel and ditch within tunnel in addition to corresponding projects affiliated to tunnel engineering, for which parties by mutual agreement conclude and enter into this contract , parties hereby agree as follows:一、組成合同的文件: Documents Constituted Contract組成本合同的文件包括:including the following:本合同協(xié)議書(shū) Agreement hereof本合同條款 Terms and conditions hereof本工程適用的標(biāo)準(zhǔn)、規(guī)范及有關(guān)技術(shù)文件Standards, norms and concerned technical documents applicable to this engineering.甲方技術(shù)交底圖紙 Drawings delivered by party A, with explanation of technology.附件1《承包人承包工程項(xiàng)目一覽表——工程量清單》,以及雙方有關(guān)工程的洽商、變更等書(shū)面協(xié)議或文件視為本合同的組成部分。鐵路隧道工程施工承包合同CONTRACT OF RAILWAY TUNNEL ENGINEERING CONSTRUCTION 簽署日期: Date of Signature甲方:中鐵集團(tuán)(以下簡(jiǎn)稱甲方)Party A: China Railway Group. ( hereinafter referred to as Party A)乙方:隧道工程公司(以下簡(jiǎn)稱乙方)Party B: Tunnel Engineering Company (hereinafter referred to as Party B)條款目錄 CONTENTS一、 組成合同的文件: Documents Constituted Contract二、 工程概況 General Review of Project三、 工期 Work Term四、 工程數(shù)量的核實(shí)和確認(rèn) Check and Confirmation of Work Quantity五、 承包工程造價(jià) Project Cost六、工程質(zhì)量標(biāo)準(zhǔn)與驗(yàn)收 Project Quality Standards and Acceptance七、隱蔽工程檢查和簽證 Inspection and Confirmation of Hidden Works八、材料的供應(yīng) Supply of Material九、工程變更 Alteration十、雙方責(zé)任與權(quán)利 Responsibilities and Rights of Parties十一、安全施工 Safe Construction十二、進(jìn)度計(jì)劃 Progress Schedule十三、承包工程價(jià)款支付和結(jié)算 Settlement and Payment十四、履約擔(dān)保 Performance Bond ( PB履約金 25%)十五、保修 Maintenance and Repair十六、違約責(zé)任 Liabilities十七、 其它約定 Miscellaneous 鑒于:甲方系鐵路建設(shè)工程總承包商,因鐵路建設(shè)需要并經(jīng)過(guò)業(yè)主同意,通過(guò)招標(biāo)將一號(hào)隧道工程承包給具有隧道建設(shè)資質(zhì)和能力的專業(yè)公司施工;鑒于:乙方系專業(yè)從事隧道工程建設(shè)的施工公司,具有相應(yīng)的工程資質(zhì)和能力,中標(biāo)承包本合同工程;據(jù)此,甲方將一號(hào)隧道的洞身鉆爆開(kāi)挖、洞門(mén)修建、防排水設(shè)施、錨網(wǎng)噴支護(hù)、襯砌、洞內(nèi)溝槽及洞室和相應(yīng)的隧道施工附屬項(xiàng)目承包給乙方施工,經(jīng)雙方協(xié)商一致,訂立本合同,共同遵守。WHEREAS: Party A being general contractor of railway engineering will, for necessity of railway construction and gain employer’s consent, contract through bidding No. One tunnel project to the professional pany with qualification and capability of tunnel construction for execution。Appendix One: The List, Bill of Quantity of Engineering contracted by contractor in addition to the agreements or files in writing relative to negotiation, alteration of engineering by parties hereto will be deemed as integral parts hereof.二、 工程概況 General Review of Project㈠、工程名稱:一號(hào)隧道。Project Scale: Total Tunnel Length : 1152 Meters㈣、承包范圍和內(nèi)容包含: Contracted Scope and Contents including as follows:洞身開(kāi)挖(圍巖級(jí)別分類(lèi)情況見(jiàn)工程量清單)。Tunnel Execution: The grade of surrounding rock refer to List of Quantity, particulars thereof include as follows: temporary facilities, scaffolding, measurement, artificial digging renovation, drilling, blasting, ventilation, ballast leaving, transport material, lighting, pipeline and drainage, the production, installation, disassembly of wooden support, repair side ditch in addition to backfill for over excavation and other works which are necessity for execution, plement and defect repairs of tunnel project.支護(hù) SupportA、砂漿錨桿、中空注漿錨桿。Lining, including tunnel, inverted arch and reinforcement, the inverted arch filling,
點(diǎn)擊復(fù)制文檔內(nèi)容
環(huán)評(píng)公示相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1